Loading...
HomeMy WebLinkAboutLetter of AcknowledgementMITCHaEwLL MORGAN Erika Bridges City of College Station Planning & Development Services PO Box 9960 College Station, TX 77842 March 1, 2013 RE: LETTER OF ACKNOWLEDGEMENT FOR THE REDMOND TERRACE SHOPPING CENTER AT COLLEGE STATION The purpose of this letter is to acknowledge that the construction plans for The Redmond Terrace Shopping Center project, to the best of my knowledge do not deviate from the B/CS Design Guidelines Manual. I also acknowledge, to the best of my knowledge that the details provided in the construction plans are in accordance with the Bryan/College Station Standard Details. have any comments, Veronica J.B`MoW, PE, Managing Partner cc: file ris further, please feel free to contact me. 511 UNIVERSITY DRIVE EAST, SUITE 204 COLLEGE STATION, TX 77840 • T 979.260.6963 • L 979.260.3564 CIVIL ENGINEERING • HYDRAULICS HYDROLOGY UTILITIES - STREETS - SITE PLANS - SUBDIVISIONS info@mitch Ellandmorgan.cam w .mitchellandmorgan.com