Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Cost Estimate
ENGINEER'S ESTIMATE REDMOND SHOPPING CENTER - PUBLIC INFRASTRUCTURE ITEM NO. QUANTITY UNIT DESCRIPTION UNIT PRICE TOTAL COST Onsite Waterline 1 1 LS Prepare R.O.W. $ 1,000.00 $ 1,000.00 2 1 LS Mobilization $ 800.00 $ 1,200.00 3 1395.1 SF 4" Concrete Sidwalk $ 4.00 $ 5,580.40 4 2 EA HandicapAccessible Rams $ 900.00 $ 1,800.00 5 92.0 LF 6" PVC Waterline AW WA C900 CL 200) $ 30.00 $ 2,760.00 6 3 EA 6" M.J. Gate Valve & Box $ 1,000.00 $ 3,000.00 7 2 EA 6"xe" M.J. Tee $ 600.00 $ 1,200.00 8 2 EA 6"x11.25 Degree M.J. Bend $ 350.00 $ 700.00 9 1 EA Connection to existing system $ 2,000.00 $ 2,000.00 10 1 EA I Std. Fire Hydrant Assembly $ 3,265.00 $ 3,265.00 11 92.0 LF Structural Backfill $ 8.00 1 $ 736.00 12 1 LS Bacteria Test $ 1,200.00 $ 1,200.00 13 1 LS Pressure Test $ 3,500.00 $ 3,500.00 14 2 EA Water Meter Connection Fittings and Valves $ 650'00 $ 1,300.00 15 92.0 LF rent Protection $ 5.00 $ 460.00 Public Infrastructure Total: $ 29,701.40 ..............kqs*h #.: �A}MFS T,.AATlrllktQRS: aasai 1 S�ONAL E� — 9 1 ��• 34-2otZ Cy. r,* I-'- 103