HomeMy WebLinkAboutLetter of CompletionLETTER OF COMPLETION
CITY ENGINEER
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
DATE: 9- 11--15
RE: COMPLETION OF
REDMONO SI+oPP10-10 Cb-NTE.A
15 D TE M 5 A,,/ 501J-r -i
Dear Sir: COI -Le Lq E 15"rAT1o,ti1 , T 7C -7-75 AD
The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station, Texas. This approval and acceptance by the City is requested in order that we
may finalize any subcontracts and to affirm their warranty on the work. This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project.
The one-year warranty is hereby affirmed and agreed to by "jal??'0.41_ SE -JlC srl-7D4L52)
and by their subcontractors as indicated by signatures below.
WORK COMPLETED
54E:J-L eWIL9fNy-CON 5Tr-,UG7"Tohl
Z4
Owner: $ kt(L PAO&" I10. L , LITD.
Phone Number: 713-vsE-s!S/
Address 043 Wedw4l Suite RJo
140vtteK.T� 77037
Signature:*
ACCEPTANCE & APPROVAL
City Representative
IAM W►� I �.
City Engineer
Revised 1131107
WARRANTY DATE
'b-12-I'i
Contractor: LAOIZ&w 1E SEKJ (-L- 5. t-TM. �Lstx)
Phone Number: 2$1-449 -` 7-15
Address:
1oZo 4 GR-1 P-Bfrl-1K1> N . t-►Du57bN tz�
ow57b7-t C � O6 -
Signature v
PLAT FILED
OFFSITE ESMTS FILED
TEMP BLANKET ESMT FILED
ai&_NO OTHER ESMTS NEEDED