HomeMy WebLinkAboutFoldervr
CITY OF C OLLEGE STATION
Planning & Development Servim
FOR OFFICE USE ONLY
P&Z CASE NO.: Q ltz. -S=j
DATE SUBMITTED: 0 -:l KtX~
SITE PLAN APPLICATION
Di{.90
~
MINIMUM SUBMITTAL REQUIREMENTS
_X __ Site plan application completed in full.
_X __ $200.00 Application Fee.
_X __ $200.00 Development Permit Application Fee.
_X __ $600.00 Public Infrastructure Inspection Fee if applicable. (This fee is payable if construction of a public
waterline, sewerline, sidewalk, street or drainage facilities is involved.)
_L_ Eleven ( 11) folded copies of site plan
1_ 0ne (1) folded copy of the landscape plan.
N/A One (1) copy of building elevation for all buildings.
N/A A list of building materials for all facades and screening for non-residential buildings.
N/A Color samples for all non-residential buildings.
N/A Traffic Impact Analysis (if applicable for non-residential buildings).
_L_A copy of the attached site plan checklist with all items checked off or a brief explanation as to why they
are not checked off.
N/A Parkland Dedication requirement approved by the Parks & Recreation Board, please provide proof of
approval (if applicable).
Date of Preapplication Conference: _______ T_u_es_d_a_y~. s_e~p~t_e_m_b_e_r _12~·~2_0~0_6 ________ _
NAMEOFPROJECT __ C_u=r_ry~P~lu~m~b~i~ng~-------------------------
ADDRESS 625 Graham Road
LEGAL DESCRIPTION Graham Road Business Center, Lot 1, 2.59 Acres
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary Contact for the Project):
Name STEVE DUNCAN PLEDGER KALKOMEY INC
Street Address 7020 COYOTE RUN
State TX Zip Code __ 7_78~0~8 __ _
Phone Number 979-731 -8000
PROPERTY OWNER'S INFORMATION:
City BRYAN
E-Mail Address -~S=E=D~@='-PK'""'"E=N'-'-"'G-'-'-1 N-'-'E=E=R"""l-'--'N-=G'"'-. C=-O==M'----
F ax Number _~9~7~9~-7~3~1~-1~5~00"'----------
Name ____________________________________ _
Street Address--------------------City _________ _
State _____ Zip Code ______ _ E-Mail Address _____________ _
Phone Number ___________ _ Fax Number ______________ _
ARCHITECT OR ENGINEER'S INFORMATION:
Name STEVE DUNCAN PLEDGER KALKOMEY INC
Street Address 7020 COYOTE RUN
State _T_X ____ Zip Code _7~7~8'"""0~8 ___ _
Phone Number 979-731-8000
6/13/03
City BRYAN
E-Mail Address SED@PKENGINEERING.COM
Fax Number 979-731-1500
I of6
SUPPLEMENTAL DEVELOPMENT PERMIT INFORMATION
Application is hereby made for the following development specific site/waterway alterations:
ACKNOWLEDGMENTS:
I, STEVE E. DUNCAN design engineer/GWReF, hereby acknowledge or affirm that:
The information and conclusions contained in the above plans and supporting documents comply with the current
requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design
Standards. As a condition of approval of this permit application , I agree to construct the improvements proposed in this
application accor ing to these documents and the requirements of Chapter 13 of the College Station City Code.
Contractor
CERTIFICATIONS: (for proposed alterations within designated flood hazard areas.)------N/A
A.I, certify that any nonresidential structure on or proposed to be on this site
as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the
100 year storm.
Engineer Date
8. I, certify that the finished floor elevation of the lowest floor, including any
basement, of any residential structure, proposed as part of this application is at or above the base flood elevation
established in the latest Federal Insurance Administration Flood Hazard Study and maps, as amended.
Engineer Date
C. I, , certify that the alterations or development covered by this permit shall not
diminish the flood-carrying capacity of the waterway adjoining or crossing this permitted site and that such alterations or
development are consistent with requirements of the City of College Station City Code, Chapter 13 concerning
encroachments of floodways and of floodway fringes.
Engineer Date
D. I, , do certify that the proposed alterations do not raise the level of the 100
year flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study.
Engineer Date
Conditions or comments as part of approval:----------------------------
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets,
or existing drainage facilities.
All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for
the above named project. All of the applicable codes and ordinances of the City of College Station shall apply.
6/13/03 3 of 6
WATER ---
1
2
3
4
5
6
7
a
9
10
11
Curry P1umbing
PK Job No. 43306-291
Plans Dated: January 29, 2007
Mobilization, including insurance,
l LS move-in, move-out, and related items
(No Bonds):
14 LF 6" water line, AWWA C-909 Class 200
PVC with detector tape in trench:
6" water line, AWWA C-909 Class 200
60 LF PVC in 14"x3/B" steel casing bv bore
with casing spacers, end seals, and
joint restraints:
1 El\ 12"x6" tapping sleeve & valve:
2 EA 6" DI bend (90, 45, 22.5, etc .):
1 LS Pavement repair (concrete),
including structural backfill:
1 LS Remove & repair curb & sidewalk as
required:
l EA Fire hydrant with lead, gate valve,
and box:
17 LF Trench safety for water line:
1 LS Traffic control:
1 LS Seed all disturbed areas:
SUBTOTAL WATER
5:\2DD!\519D!-2l 1 SOUTllCOl1'1-ro: tlada\ca.al uLi.:lat.u\2001-D2-H LakeDCC and enqr tutiM1te.al:J
$
$
$
$
$
$
$
$
$
$
$
Estimate of
Probab1e Cost
2,000.00 $
20.00 $
190. 00 $
4,200.00 $
185.00 $
2,500.00 $
1,000.00 $
2,500.00 $
2.00 $
2,000.00 $
150.00 $
$
2 I 000 • 00
280 .00
11,400 .00
4,200.00
310 ;·oo
2,500.00
1,000 .00
2,500 .00
34.00
2,000 .DO
150 .00
26,434.00
1 of 2
1,
Curry Plumbing
PK Job No. 43306-291
Plans Dated: January 29, 2007
Estimate of
Probable Cost
L..-l~te~m:... ........ ~E-s_tl_m_a-te~d~-'-~~~~~~~~---~~~~~~~--'I IL-~~~~-u_n_l_t~~~~~'--~~~~-T-o-ta-1~~~~--' Quantity Description . _ Price Price
STORM SEWER
Mobilization, including insurance,
1 1 LS move-in, move-out, and related items s 2,000 .00 $ 2,000 .00
(No Bonds):
2 l LS Clear & grub as required: $ 800 .00 s B00.00
2 489 LF 24" HOPE storm sewer line in trench
.(o .•.,,.6 • cut): s 30.00 s 14,670.00
3 l EA 24" HOPE bend (90, 45, 22 .5, etc.): s 200.00 $ 200.00
3 2 EA 4' standard manhole (0-6' cut): $ 2,000.00 s 4,000.00
4 25 LF 4 "x4' wide concrete slope paving: s 20.00 $ 500.00
4 1 LS Seed all disturbed areas: s 400.00 $ 400.00
SUBTOTAL STORM SEWER $ 22,570.00
TOTAL ALL UTILITIES s 49,004.00
2 of 2
CITY OF COLLEGE STATION
Planning & Dewlopmmt ~rvice1
SITE LEGAL DESCRIPTION:
Graham Road Business Center
Lot 1
2.59 Acres
DEVELOPMENT PERMIT
PERMIT NO. 06-59
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE ADDRESS:
625 Graham Road
DRAINAGE BASIN:
Lick Creek
DATE OF ISSUE: February 15, 2007 VALID FOR 12 MONTHS
CONTRACTOR: OWNER:
Freddie Curry
2102 Rock Prairie Road
College Station, Texas 77845
TYPE OF DEVELOPMENT:
SPECIAL CONDITIONS:
Full Development Permit
All construction must be in compliance with the approved construction plans
All trees requ ired to be protected as part of the landscape plan must be completely barricaded in accordance with Section
7 .5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operations of
this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents,
asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also
prohibited.
Full Development Permit
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria. If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite, it is the
contractors responsibility to implement measures that will meet City, State and Federal requ irements. The Owner and/or
Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any
silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any
disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be
responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment
as well as erosion, siltation or sedimentation resulting from the permitted work.
In accordance with Chapter 13 of the Code of Ord inances of the City of College Station, measures shall be taken to insure
that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage
facilities.
I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply.
Date
7Lu:P~
Date
CALCULATED FLOW
CURRY PLUMBING
CITY OF COLLEGE STATION
PK JOB #43306-291
FIRE FLOW CALCULATION
Fire Flow at hydrant Q-070 (Victoria Ave. and Graham Rd.):
With 20-psi pressure at Static Hydrant Q-084:
Qr = 29 .83cdD 2 JP:
Qr = (29.83)(0.9)(2.5)2J80=1,453 gpm
p -20 ( J
0.54
QI =Qr ;, _pr
(
96-20)0
·
54
Qf = (1,453) = 7,125 gpm 96-92
Where:
Qr = residual flow at the pitot pressure (gpm)
Q1 = Fire Flow (gpm)
cd = friction loss (usually 0.9 for smooth 2.5-in opening)
D = diameter of opening in inches (2.5 in most cases)
PP = pitot pressure (psig)
Pr = residual pressure (psig)
P, = static pressure (psig)
REQUIRED FLOW Jji. t>
Building Type~602 and 1505 of 2000 lnternationol Building Code)
Fire Area= 7,277 square feet (Section B104 of 2000 International Fire Code)
Required Fire Flow = 1,500 gpm (Table B 105.1 of 2000 International Fire Code)
Number of hydrants required = 1 (Table C105.1of2000 International Fire Code)
RESULTS
7,125 gpm available ~ 1,500 gpm required = OK
1 hydrant available ~ l hydrant required = OK
S:\2006143306-291 WILLIAMSON-Curry Plurnbing\fire report\fue flow calcs.doc Pledger Kalkomey, Inc. -Consulting Engineers
7020 Coyote Run, Bryan, TX 77808
phone: (979) 731-8000 fax: (979) 731 -1500
09 /01/2005 10 :58 FAX 979 764 3452 COLLEGE STATION PUB.UTL.
Date: 1 SEP 05
FLOW TEST REPORT
Nozzle size: 2.5 inch
Location: VICTORIA AND GRAHAM
Flow hydrant number: Q-070
Pitot reading: 75
(GPM): 1455
Static hydrant number: Q-084
Static PSI: 96
Residual PSI: 92
'
1·1 . -,
J {
~
J
J
j
1
~ i
j
I i
1
APPENDIX B FIRE-FLOW REQUIREMENTS FOR BUILDINGS
TABLE B1 05.1
MINIMUM REQUIRED FIRE FLOW AND FLOW DURATION FOR BUILDINGS
FIRE AREA (square feet) FIRE FLOW FLOW
Type IA and 1s• Type llA and lllA • Type IV and V·A • Type 118 and 1118° Type v.s• (gallons per minute)b DURATION (hours)
0-22.700 0-12,700 0-8.200 0-5,900 0-3.600 l .5M
22,701 -30.200 12,701-17,000 8.201-10.900 ::----5.901-7,900 ~ 3.601-4.800 c 1.75n -
30.201-38.700 17 .001-21.800 10.901-12.900 7,901-9,800 4.801 -6.200 2,000
2
38.701 -48.300 21.801-24.200 12.901-17.400 9.801 -12.600 6.201 -7,700 2.250
48.301-59.000 2-UOl-33.200 17.40 l-21.300 12.601-15.400 7.701-9.400 2.500
59.001-70.900 I 33.20l-39.700 21.301-25.500 15.401-18.400 9.401-11.300 2.750
70.90 l-83.700 39 .70l -47,!00 I 25.501 -30.100 18.40 l-21.800 I 11.301-13.400 3.000
83,701-97.700 47.101-5-1.900 30.101-35.200 21.80 l-25.900 13.401-15,600 3.250
3 97,70 1-1 12.700 5-1 .90 l-63,400 35,201-40.600 25.901-29,300 15.601-18,000 3,500
. -
112,701-128.700 63.40 l-72.400 40.60 1-46.400 29,301-33,500 18.001-20.600 3,750
128.701-145,900 72.401-82,100 46.40 1-52.500 33,501-3 7,900 20,601-23.300 4,000
145,901-16-1.200 82.10 1-92.400 52,501-59,100 37,901-42,700 23.301-26.300 4,250 --
164,201-183.400 92.401.103. 100 59. 101 -66,000 '1 42.701-47,700 26.301-29,300 4,500
183.401-203,700 103.101-1 14,600 66.00 l • 73.300 47,701-53,000 29,301-32.600 4,750
203, 70 l-225.200 114.601-126,700 73,301 -8 l.l 00 53.001-58.600 32.601-36,000 5,000
225,201-247.700 126.701-139,400 81.101-89.200 58.601-65,400' 36.001-39,600 5,250
247.70 l-271,200 139.40 l -152.600 89.201-97.700 65,40 l · 70.600 39.601-43.400 5,500
271,201-295.900 152.601-166,500 97,701-106.500 70,60 1-77,000 43.401-47,400 5,750
295,90 I-Greater 166.50 !-Greater 106.501-1 15.800 77,001-83.700 47.401-51,500 6.000 4
--115.801-125,500 83. 701-90.600 5 l.501-55,700 6,250
--125,50 l-135.500 90.601-97.900 . 55.701-60.200 6.500 -.. -· --135.501-145,800 97 ,90 l-106,800 60.201-64.800 6.750
--145.801-156.700 106.801-113,200 64.80 l-69 ,600 7.000
--156.701-167.900 113.201 -121.300 69.601-74.600 7.250
--167.901-179.400 121.301-129,600 74.601-79.800 7,500
--179.401-191.400 129.601 -138,300 79.801-85. 100 7.750
--19 l.40 ! -Greater 138.301-Greater 85.101-Greater 8,000
For SI: I squ:J.re foot= 0.0929 m2, I gJ.llon per minute= 3.785 Um. I pound per squ:J.re inch= 6.895 kPa.
a. Types of construction :J.re based on the /nrernativruJ! Building Code.
b. ~kasured ac 20 psi.
358 2000 INTERNATIONAL FIRE CODE®
...
,. >
Appendix C
FIRE HYDRANT LOCATIONS AND DISTRIBUTION
SECTION C101
GENERAL
CID 1.1 Scope. Fire hydrants shall be provided in accordance
with this appendix for the protection of buildings. or portions of
buildings. hereafter constructed.
SECTION C102
LOCATION
C102.l Fire hydrant locations. Fire hydrants shall be! pro~ · -
vided along required fire apparatus access roads and adjacent
public streets.
SECTION C103
NUMBER OF FIRE HYDRANTS
C103.1 Fire hydrants available. The minimum number of fire
hydrants available to a building shall not be less than that listed
in Table CI 05.1 . The number of fire hydrants available to a
complex or subdivision shall not be less than that dett!rmined
by spacing requirements listed in Table CI 05.1 when applied to
fire apparatus access roads and perimeter public streets from
which fire operations could be conducted.
SECTION C104
CONSIDERATION OF EXISTING FIRE HYDRANTS
CI0-1.1 Existing fire hydrants. Existing fire hydrants on pub-
lic stret!tS are allo\ved to be considered as available . Existing
fire hydrants on adjacent properties shall not be considered
available unless fire app:iratus access roads extend between
properties and easements are established to prevent obstruction
of such roads.
SECTION C105
DISTRIBUTION OF FIRE HYDRANTS -·
C105.1 Hydrant spacing. The average spacing between fire
hydrants shall not exceed that listed in Table CI 05.1.
Exception: The fire chief is authorized to accept a defi-
~ncy of up to 10 percent where existing fire hydrants pro-
vide all or a portion of the required fire hydrant service.
Regardless of the average spacing, fire hydrants shall be lo-
cated such that all points on streets and access roads adjacent to
a building are within the distances listed in Table C 105.1.
. .. __ TABLE C105.1
NUMBER AND DISTRIBUTION OF FIRE HYDRANTS
AVERAGE SPACING MAXIMUM DISTANCE FROM
FIRE-FLOW REQUIREMENT MINIMUM NUMBER BETWEEN HYDRANTS0• b, c ANY POINT ON STREET OR ROAD
(qpm) OF HYDRANTS (feet) FRONTAGE TO A HYDRANr
1.750 or less /"""' 1 ---.... 500 250
2.000-2.250 2 450 225
2.500 3 I 450 215
3,000 3 400 225
3.500-4,000 4 350 210
4.500-5.000 5 I 300 180
5.500 6 300 180
6.000 6 250 150
6.500-7 ,000 7 250 150
7.500 or more 8 or more' 200 120
For SI: 1 fooc = 304.8 mm, I gallon per minute= 3.785 Um.
a. Reduce by 100 feet for dead-end streets or roads.
b. Where streets are provided wich median dividers which can be crossed by lire lighters pulling hose lines, or where arterial streets are provided with four or more
traffic lanes and have a traffic count of more than 30,000 vehicles per day, hydrant spacing shall average 500 feet on each side oflhe street and be arranged on an al -
ee mating basis up to a fire-flow requirement of 7,000 gallons per minute and 400 fee! for higher lire-flow requirements .
c. Where new water mains are extended along streets where hydrants are not needed for proteccion of structures or similar lire problems. fire hydrants shall bi:: pro-.
vided at spacing no< to exceed 1,000 feet to provide for transportation hazards.
d. Reduce by 50 fee! for dead-end streets or roads.
e. One hydranc for each 1,000 gallons per minute or fraction thereof.
359
Drainage and Detention Report
Prepared for:
CURRY PLUMBING
City of College Station
Brazos County, Texas
PK Job No. 433 06-291
January 16, 2007
Prepared by:
Pledger Kalkomey, Inc.
Consulting Engineers
7020 Coyote Run • Bryan, Texas 77808
979-731-8000 • 979-731-1500 (Fax)
www.pkengineering.com
Brenham • Bryan • Rosenberg
This report was prepared by me (or under my supervision) in accordance with
(proposed draft) provisions of the Bryan/College Station Unified Drainage
Design Guidelines for the owners of the property. All applicllble licenses and
permits required by any and all state and federal regulatory agencies for the
proposed drainage improvements have been issued
S:\2006143306-291 Williamson-Curry Plumbing\drain report\drain report-Curry.doc
t'
( I ' . . . ~
J •
,. ....
... ·1 • .J
PURPOSE
Development of the subject property involves the additi on of
buildings, sidewalks, drive, and parking spaces. The drainage
area affected by the development contains approximately three
acres of land. Reference is made to the attached Existing and
Proposed Drainage Area exhibits and the Grading Plan (sheet C3
of 3, dated 1/16/07). The increase in runoff from the
development for the two-, ten-, twenty-five-, and one hundred-
year (2 -, 10-, 25-, & 100-year) storm events must be mitigated to
not increase downstream flow rates. This report documents the
engineering analysis for the mitigation through the use of a
detention basin.
METHODOLOGY
The watershed affected by the proposed development was delineated
via field surveying data. The Rational Method was used to
compute the peak flow rates for this study . The acreage (A) of
each drainage area was obtained from the maps. Based on existing
ground cover, a weighted runoff coefficient (C) for each area was
determined. A velocity-distance relationship was used to compute
the time of concentration (tc) for each area with a minimum time
of concentration of ten (10) minutes. The rainfall intensity (I)
for each drainage area was calculated using the Equations for
Calculating Rainfall Intensities for the City of College Station
(Table C-1, Unified Stormwater Design Guidelines, March 2006).
The peak flow rate (Q) for each drainage area was computed with
the following formula:
Q = (C) (I) (A)
The procedure wa s then repeate d for t h e developed conditions of
S:\2006143306-291 WILLIAMSON-Curry Plumbingldrain reportldrain report-Curry.doc
,1
property, where excess runoff due to the development will be
detained. Drainage Area 2 drains to the front of the property
(Graham Road) . No excess runoff is expected in Drainage Area 2
because of proposed grade break changes. Inflow hydrographs for
developed conditions were computed via the Malcolm Method from
the total area, percent of impervious area, rainfall depth, and
peak flow.
Outflow hydrographs for the 2-, 10-, 25-, and 100-year storms
were developed using the elevation-versus-storage relationship
for the detention basin and the elevation-versus-discharge
relationship for the outlet structure. Discharge values for the
pipe outlet structure are calculated by the weir equation (Q
= CLHi.5 ) for unsubmerged conditions and the orifice equation (Q =
CA(2GH) 0 •5 ) for submerged conditions with a transition zone between
the two conditions approximated linearly.
A modified Puls method was then used to route the post-
development hydrograph through the basin. Haestad Methods, Inc.
computer modeling program Pond-2 Version 5. 21 was used for the
calculations.
RESULTS
A detention basin is planned at the rear of the development to
off set the increase in runoff rates due to the increase in
impervious cover in Drainage Area 2. An outlet structure
,
consisting of two vertical, circular orifices (6" orifice at
91.80' and an 8" orifice at 95.65') and a horizontal grate inlet
(31" square at 98. 70') will release the post-development runoff
at less than pre-development runoff rates. A 24-inch storm pipe
will carry the runoff to a drainage ditch northwest of the
property.
S:\2006\43306-291 WILLIAMSON-Curry Plumbing\drain report\drain report-Curry.doc
Runoff rates for developed conditions are .calculated to be less
than rates for undeveloped conditions in Drainage Area 2 for all
storms except the two-year storm event. The drainage area
information and the calculations for the existing and proposed
conditions are attached. Summary data is as follows:
DRAINAGE AREA 1 (toward rear of property) :
EXISTING:
Storm Peak Flow Rate
Event ( cfs)
2 yr 2.76
10 yr 4.47
25 yr 5.30
100 yr 6.70
PROPOSED:
Peak Flow Peak Flow Peak
Storm Rate In Rate Out Storage Elevation
Event (cfs) (cfs) (ac-ft) (ft)*
2 yr 11. 39 2.43 0.59 96.12
10 yr 16.84 4.40 0.90 97.59
25 yr 19.20 4.82 1. 02 98.02
100 yr 22.19 6.06 1. 36 98.73
*Overflow elev. = 98.75 ft
S:\2006143306-291 WILLIAMSON-Curry Plumbingldrain reportldrain report-Curry.doc
DRAINAGE AREA 2 (toward street):
EXISTING:
Storm Peak Flow Rate
Event (cfs)
2 yr 1. 51
1 0 yr 2.37
25 yr 2.78
1 00 yr 3.48
PROPOSED:
Storm Peak Flow Rate
Event ( cfs )
2 yr 1. 64
1 0 yr 2.24
25 yr 2.56
100 yr 3.03
S:\2006143306-291 WILLIAMSON-Curry Plumbing\drain report\drain report-Curry.doc
'•
POND-2 Version: 5.21
S/N:
Detention Pond Volume
Curry Plumbing
College Station, TX
CALCULATED 01-12-2007 11:33:20
DISK FILE: S:\ENGR\DETAIN\CURRY\CURRY .VOL
Planimeter scale: 1 inch 1 ft.
*
Elevation
(ft)
Planimeter
(sq.in.)
Area
(acres)
Al+A2+sqr(Al*A2)
(acres)
Volume
(acre-ft)
Volume Sum
(acre-ft)
*
91. 80 0.00 0.00 0.00 0.00 0.00
92.00 198.00 0.00 0.00 0.00 0.00
93.00 3,811.00 0.09 0 .11 0.04 0.04
94.00 7' 611. 00 0.17 0.39 0 .13 0 .17
95.00 9,051.00 0.21 0 .57 0.19 0.36
96. 00 9,051.00 0.21 0.62 0.21 0.57
97.00 9,051.00 0.21 0.62 0.21 0.77
97.50 9,051.00 0.21 0.62 0.10 0.88
98.00 15,540 .00 0.36 0.84 0.14 1. 02
99.00 31,062.00 0.71 1.57 0.52 1. 54
Incremental volume computed by the Conic Method for Reservoir Volumes.
Volume= (1/3) * (EL2-EL1) * (Areal+ Area2 +sq.rt. (Areal*Area2))
where: ELl, EL2
Areal,Area2
Volume
Lower and upper elevations of the increment
Areas computed for ELl, EL2, respectively
Incremental volume between ELl and EL2
\
Outlet Structure File: CURRY .STR
S/N: POND-2 Version: 5 .21
Date Executed : Time Executed:
*****
Elevation (ft) --------------
91. 80
92 .00
92 .20
92 .40
92.60
92 .80
93 .00
93 .20
93.40
93 .60
93 .80
94 .00
94 .20
94.40
94 .60
94.80
95.00
95 .20
95 .40
95 .60
95.65
95 .80
96.00
96 .20
96 .40
96.60
96 .80
97 .00
97 .20
97 .40
97 .50
97.60
97.80
98.00
98 .20
98.40
98 .50
98 .60
98 .80
99 .00
*******************
Outlet Structure
Curry Plumbing
College Station, TX
*******************
COMPOSITE OUTFLOW SUMMARY
Q (cfs) Contributing
****
Structures
-------------------------------
0.0 1
0 .1 1
0.3 1
0 .5 1
0 .7 1
0.8 1
0 .9 1
1. 0 1
1.1 1
1.2 1
1. 3 1
1. 3 1
1. 4 1
1. 5 1
1.5 1
1. 6 1
1. 7 1
1. 7 1
1.8 1
1. 8 1
1. 8 1 +2
1. 9 1 +2
2.2 1 +2
2 .6 1 +2
3 .0 1 +2
3 .3 1 +2
3.6 1 +2
3 .8 1 +2
4.1 1 +2
4.3 1 +2
4 .4 1 +2
4 .4 1 +2
4 .6 1 +2
4 .8 1 +2
5.0 1 +2
5 .1 1 +2
5 .2 1 +2
5 .3 1 +2
6 .5 1 +2 +4
11. 4 1 +2 +4
Outlet Structure File: CURRY .STR
POND-2 Version: 5.21
Date Executed:
S/N:
Time Executed:
*******************
Outlet Structure
Curry Plumbing
College Station, TX
*******************
Outlet Structure File:
Planimeter Input File:
Rating Table Output File:
S:\ENGR\DETAIN\CURRY\CURRY
S:\ENGR\DETAIN\CURRY\CURRY
S:\ENGR\DETAIN\CURRY\CURRY
.STR
.VOL
.PND
Min. Elev. (ft) = 91. 8 Max. Elev. (ft) = 99 Iner. (ft)
Additional elevations (ft) to be included in table:
* * * * * * * * * * * * * * * * * * * * * * * * * *
97.5 98.5 95.65
**********************************************
SYSTEM CONNECTIVITY
**********************************************
Structure No. Q Table Q Table -----------------------
CULVERT-CR 1 -> 1
CULVERT-CR 2 + 1 -> 3
INLET BOX 4 + 3 -> 5
Outflow rating table summary was stored in file:
S:\ENGR\DETAIN\CURRY\CURRY .PND
. 2
'
Outlet Structure File: CURRY .STR
S/N: POND-2 Version: 5 .21
Date Executed: Time Executed:
*******************
Outlet Structure
Curry Plumbing
College Station, TX
*******************
>>>>>> Structure No. 1 <<<<<<
(Input Data)
CULVERT-CR
Circular Culvert (With Inlet Control)
El elev. (ft)?
E2 elev. (ft) ?
Diam . (ft)?
Inv . el. (ft)?
Slope (ft/ft)?
Tl ratio?
T2 ratio?
K Coeff .?
M Coeff.?
c Coeff .?
Y Coeff.?
Form 1 or 2?
Slope factor?
91. 8
99.001
0 .5
91. 8
0 .02
0.0098
2
0 .0398
0.67
1
-0.5
'
Outlet Structure File: CURRY .STR
S/N: POND-2 Version: 5.21
Date Executed: Time Executed:
*******************
Outlet Structure
Curry Plumbing
College Station, TX
*******************
>>>>>> Structure No . 2 <<<<<<
(Input Data )
CULVERT-CR
Circular Culvert (With Inlet Control)
El elev. (ft)?
E2 elev. (ft)?
Diam. (ft)?
Inv. el .(ft)?
Slope (ft/ft)?
Tl ratio?
T2 ratio?
K Coeff.?
M Coeff,?
c Coeff.?
Y Coeff.?
Form 1 or 2?
Slope factor?
91. 8
99.001
0.66667
95.65
0.02
0.0098
2
0.0398
0.67
1
-0.5
\
Outlet Structure File: CURRY
POND-2 Version: 5.21
Date Executed:
.STR
S/N:
Time Executed:
*******************
Outlet Structure
Curry Plumbing
College Station, TX
*******************
>>>>>> Structure No. 4 <<<<<<
(Input Data)
INLET BOX
Weir & Orifice defined by length and area
Elelev.(ft)? 91.8
E2 elev . (ft)? 99 .001
Crest elev. (ft)? 98 .70
Weir length (ft)? 10.6
Weir coefficient? 3.33
Orifice area (sq.ft)? 2.8
Orifice coefficient? 0.6
Start transition elev. (ft) @ ?
Transition height (ft)?
'
Outlet Structure File: CURRY .STR
S/N: POND-2 Version : 5.21
Date Executed: Time Executed:
*******************
Outlet Structure
Curry Plumbing
College Station, TX
*******************
Outflow Rating Table for Structure #1
CULVERT-CR Circular Culvert (With Inlet Control)
***** INLET CONTROL ASSUMED *****
Elevation (ft) Q (cfs) Computation Messages ---------------------------------------------
91.80 0 .0 No headwater
92.00 0.1 Equ.1: HW =.2 dc=.15
92.20 0.3 Equ.1: HW =. 4 de=. 272
92.40 0.5 Transition: HW =.6
92.60 0.7 Submerged: HW =.8
92.80 0.8 Submerged: HW =1.0
93.00 0.9 Submerged: HW =1.2
93.20 1. 0 Submerged: HW =l. 4
93.40 1.1 Submerged: HW =1. 6
93.60 1. 2 Submerged: HW =l. 8
93.80 1. 3 Submerged: HW =2 .0
94.00 1. 3 Submerged: HW =2 .2
94.20 1. 4 Submerged: HW =2 .4
94.40 1. 5 Submerged: HW =2.6
94.60 1. 5 Submerged: HW =2.8
94.80 1. 6 Submerged: HW =3.0
95.00 1. 7 Submerged: HW =3.2
95.20 1. 7 Submerged: HW =3.4
95.40 1. 8 Submerged: HW =3.6
95.60 1. 8 Submerged: HW =3.8
95.65 1. 8 Submerged: HW =3 .85
95.80 1. 9 Submerged: HW =4.0
96.00 1. 9 Submerged: HW =4 .2
96.20 2.0 Submerged: HW =4 .4
96. 40 2 .0 Submerged: HW =4.6
96. 60 2.1 Submerged: HW =4 .8
96. 80 2 .1 Submerged: HW =5.0
97.00 2.2 Submerged: HW =5 .2
97.20 2.2 Submerged: HW =5.4
97.40 2.3 Submerged: HW =5.6
97.50 2.3 Submerged: HW =5.7
)
Ac=.049
Ac=.109
Outlet Structure File: CURRY
POND-2 Version: 5.21
Date Executed:
.STR
S/N:
Time Executed:
>>>>> CONTINUED from previous page <<<<<
Outflow Rating Table for Structure #1
CULVERT-CR Circular Culvert (With Inlet Control)
***** INLET CONTROL ASSUMED *****
Elevation (ft) Q (cfs) Computation Messages
---------------------------------------------
97.60 2.3 Submerged: HW =5.8
97.80 2.3 Submerged: HW =6.0
98 .00 2 .4 Submerged: HW =6.2
98.20 2.4 Submerged: HW =6 .4
98.40 2 .5 Submerged : HW =6 .6
98.50 2 .5 Submerged : HW =6 .7
98.60 2 .5 Submerged : HW =6.8
98.80 2.5 Submerged: HW =7.0
99.00 2 .6 Submerged: HW =7.2
Used Unsubmerged Equ. Form (1) for elev. less than 92.37 ft
Used Submerged Equation for elevations greater than 92.45 ft
HW=Headwater (ft) dc=Critical depth (ft) Ac=Area (sq.ft) at de
Transition flows interpolated from the following values:
El=92.37 ft; Ql=.49 cfs; Dc=.35 ft; E2=92.45 ft; Q2=.56 cfs
\
'
Outlet Structure File: CURRY .STR
POND-2 Version: 5.21
Date Execu ted:
S/N:
Time Executed:
*******************
Outlet Structure
Curry Plumbing
College Station, TX
*******************
Outflow Rating Table for Structure *2
CULVERT-CR Circular Culvert (With Inlet Control)
***** INLET CONTROL ASSUMED *****
Elevation (ft) Q (cfs) Computation Messages ---------------------------------------------
91. 80 0 .0 E < Inv.El.= 95.65
92.00 0.0 E < Inv.El .= 95 .65
92.20 0.0 E < Inv.El.= 95.65
92.40 0.0 E < Inv.El.= 95.65
92.60 0 .0 E < Inv.El.= 95.65
92.80 0.0 E < Inv.El.= 95 .65
93.00 0 .0 E < Inv.El.= 95.65
93 .20 0.0 E < Inv.El.= 95.65
93.40 0.0 E < Inv.El .= 95.65
93 .60 0.0 E < Inv.El.= 95 .65
93 . 80 . 0.0 E < Inv.El.= 95.65
94.00 0 .0 E < Inv.El.= 95 .65
94 .20 0.0 E < Inv.El.= 95.65
94 .40 0 .0 E < Inv.El.= 95.65
94 .60 0.0 E < Inv.El .= 95.65
94 .80 0.0 E < Inv.El.= 95.65
95 .00 0.0 E < Inv.El .= 95 .65
95.20 0 .0 E < Inv.El.= 95.65
95.40 0.0 E < Inv.El.= 95.65
95 .60 0.0 E < Inv.El .= 95.65
95 .65 0 .0 No headwater
95 .80 0.1 Equ.l: HW =.15 dc=.109
96 .00 0.3 Equ .1: HW =.35 dc=.254
96 .20 0. 6 Equ .1: HW =.55 de=. 372
96.40 1. 0 Equ.1: HW =.750 de=. 471
96 .60 1.2 Submerged: HW =.95
96.80 1. 5 Submerged: HW =1.15
97.00 1. 7 Submerged: HW =l .35
97 .20 1. 8 Submerged: HW =l.55
97.40 2.0 Submerged: HW =l.75
97.50 2.1 Submerged: HW =1. 85
Ac=.037
Ac=.122
Ac=.2
Ac=.264
\
'
Outlet Structure File: CURRY
POND-2 Version: 5.21
Date Executed:
.STR
S/N:
Time Executed:
>>>>> CONTINUED from previous page <<<<<
Outflow Rating Table for Structure #2
CULVERT-CR Circular Culvert (With Inlet Control)
***** INLET CONTROL ASSUMED *****
Elevation (ft) Q (cfs) Computation Messages ---------------------------------------------
97.60 2.1 Submerged: HW =l .95
97.80 2 .3 Submerged: HW =2.15
98.00 2.4 Submerged: HW =2.35
98.20 2.5 Submerged: HW =2.55
98.40 2.7 Submerged: HW =2.75
98.50 2.7 Submerged: HW =2.85
98.60 2.8 Submerged: HW =2.95
98.80 2.9 Submerged: HW =3.15
99.00 3.0 Submerged: HW =3.35
Used Unsubmerged Equ. Form (1) for elev. less than 96.42 ft
Used Submerged Equation for elevations greater than 96.509 ft
HW=Headwater (ft) dc=Critical depth (ft) Ac=Area (sq.ft) at de
Transition flows interpolated from the following values:
El=96.42 ft; Ql=l.O cfs; Dc=.48 ft; E2=96.509 ft; Q2=1.14 cfs
\
'
Outlet Structure File: CURRY .STR
S/N : POND-2 Version: 5.21
Date Executed: Time Executed:
*******************
Outlet Structure
Curry Plumbing
College Station, TX
*******************
Outflow Rating Table for Structure #4
INLET BOX Weir & Orifice defined by l ength and area
***** INLET CONTROL ASSUMED *****
Elevation (ft) Q (cfs) Computation Messages ---------------------------------------------
91. 80 0.0 E < Inv.El.= 98.7
92 .00 0 .0 E < Inv.El.= 98.7
92.20 0.0 E < Inv .El.= 98.7
92.40 0.0 E < Inv .El.= 98.7
92.60 0.0 E < Inv.El.= 98 .7
92 .80 0.0 E < Inv.El.= 98.7
93.00 0.0 E < Inv.El.= 98.7
93.20 0.0 E < Inv.El.= 98.7
93 .40 0.0 E < Inv.El.= 98.7
93.60 0 .0 E < Inv.El.= 98.7
93 .80 0.0 E < Inv.El.= 98.7
94.00 0. o. E < Inv.El.= 98.7
94.20 0.0 E < Inv.El.= 98.7
94.40 0.0 E < Inv.El .= 98.7
94.60 0.0 E < Inv.El.= 98.7
94.80 0.0 E < Inv.El.= 98.7
95.00 0.0 E < Inv.El.= 98.7
95 .20 0.0 E < Inv.El.= 98.7
95.40 0.0 E < Inv.El.= 98 .7
95.60 0.0 E < Inv.El.= 98 .7
95 .65 0.0 E < Inv.El.= 98.7
95 .8 0 0.0 E < Inv.El.= 98 .7
96. 00 0.0 E < Inv.El.= 98.7
96 .20 0.0 E < Inv.El.= 98.7
96. 40 0.0 E < Inv.El.= 98.7
96. 60 0.0 E < Inv.El.= 98.7
96. 80 0.0 E < Inv.El.= 98.7
97.00 0.0 E < Inv.El.= 98.7
97.20 0.0 E < Inv.El.= 98.7
97.40 0.0 E < Inv.El.= 98.7
97.50 0.0 E < Inv.El.= 98.7
97.60 0.0 E < Inv.El.= 98 .7
\
•.
Outlet Structure File: CURRY
POND-2 Version: 5.21
Date Executed:
.STR
S/N:
Time Executed:
>>>>> CONTINUED from previous page <<<<<
Outflow Rating Table for Structure #4
INLET BOX Weir & Orifice defined by length and area
***** INLET CONTROL ASSUMED *****
Elevation (ft) Q (cfs) Computation Messages ---------------------------------------------
97.80 0.0 E < Inv.El.= 98 .7
98 .00 0.0 E < Inv.El.= 98.7
98.20 0.0 E < Inv.El.= 98 .7
98.40 0.0 E < Inv.El.= 98.7
98.50 0.0 E < Inv.El.= 98 .7
98.60 0.0 E < Inv.El.= 98.7
98.80 1.1 Weir: H =.1
99.00 5 .8 Weir: H =.3
Weir Cw= 3.33 Weir length= 10.6 ft
Orifice Co= .6 Orifice area= 2.8 sq.ft.
Q (cfs) = (Cw* L * H**l.5) or (Co* A* sqr (2*g*H))
No transition used, transition height = 0.0
Weir equation = Orifice equation @ elev .= 99 .08194 ft
\
Outlet Structure File: CURRY .STR
S/N: POND-2 Version: 5.21
Date Executed: Time Executed:
*******************
Outlet Structure
Curry Plumbing
College Station, TX
*******************
Outflow Rating Table 3
Table 3 l + 2
Elevation (ft) Q (cfs) Contributing Structures ---------------------------------------------
91. 80 0.0 1
92 .00 0.1 1
92 .20 0.3 1
92 .40 0.5 1
92.60 0.7 1
92 .80 0.8 1
93.00 0 .9 1
93.20 1. 0 1
93. 40 1.1 1
93.60 1. 2 1
93.80 1. 3 1
94 .00 1. 3 1
94.20 1. 4 1
94.40 1.5 1
94.60 1.5 1
94 .80 1. 6 1
95 . 00 1. 7 1
95 .20 1. 7 1
95 .40 1. 8 1
95 .60 1. 8 1
95 .65 1. 8 1 +2
95 .80 1. 9 1 +2
96.00 2.2 1 +2
96.20 2.6 1 +2
96 .40 3.0 1 +2
96.60 3.3 1 +2
96 . 80 3.6 1 +2
97 .00 3.8 1 +2
97.20 4.1 1 +2
97 . 40 4 .3 1 +2
97.50 4.4 1 +2
97 .60 4 .4 1 +2
97.80 4. 6 1 +2
98 .00 4.8 1 +2
98.20 5 .0 1 +2
98.40 5.1 1 +2
98.50 5.2 1 +2
98 .60 5 .3 1 +2
98 .80 5 .4 1 +2
\
99 .00 5.6 1 +2
Outlet Structure File : CURRY .STR
S/N: POND-2 Version : 5 .21
Date Executed : Time Executed:
*******************
Outlet Structure
Curry Plumbing
College Station, TX
*******************
Outfl ow Rating Table 5
Table 5 3 + 4
Elevation (ft} Q (cfs) Contributing Structures ---------------------------------------------
91. 80 0.0 1
92 .00 0.1 1
92.20 0 .3 1
92. 40 0.5 1
92 .60 0 .7 1
92.80 0.8 1
93 .00 0 .9 1
93.20 1. 0 1
93 .40 1.1 1
93.60 1.2 1
93 .80 1. 3 1
94 .00 1.3 1
94 .20 1. 4 1
94.40 1.5 1
94 .60 1.5 1
94.80 1. 6 1
95 .00 1. 7 1
95.20 1. 7 1
95.40 1. 8 1
95.60 1. 8 1
95 .65 1. 8 1 +2
95 .80 1. 9 1 +2
96 . 00 2 .2 1 +2
96 .20 2 .6 1 +2
96 .40 3 .0 1 +2
96 .60 3.3 1 +2
96.80 3 .6 1 +2
97.00 3 .8 1 +2
97.20 4.1 1 +2
97 .40 4.3 1 +2
97 .50 4.4 1 +2
97 .60 4 .4 1 +2
97 .80 4 .6 1 +2
98 .00 4 .8 1 +2
98.20 5 .0 1 +2
98.40 5 .1 1 +2
98.50 5 .2 1 +2
98.60 5 .3 1 +2
98 .80 6 .5 1 +2 +4
. '
99.00 11. 4 1 +2 +4
..
CURRY PLUMBING 1/12/07 4:28 PM
CITY OF COLLEGE STATION, BRAZOS COUNTY, TEXAS
REFERENCE: UNIFIED STORMWATER DESIGN GUIDELINES, CITIES OF B/CS (March 2006)
STORM EVENT:
2YRSTORM
B D
65
E
8.0 0.806
2YEARSTORM
Drainage Area 1 (Rear)
EXISTING
MANNING LENGTH DEPTH SLOPE TIME
SHEET FLOW n L, FT Pi, IN. S HOURS MIN
TC GRASS PRAIRIE 0.150 300 4.5 1.0% 0.44 26
~-----~--~-----~ TRAVEL V, FPS TIME
CONCENTRATED FLOW D, FT S Table C-4 SEC MIN
OVERLAND-GRASSLAND 52 1.0% 0.8 65 1
27
I TYPE C (Table C-3)1 % c I c. -UNDEVELOPED-PASTURE (FLAT) 0.34 100.0% 0.34
100.0% 0.34
I, IN/HR B/(TC+D)"E 3.67
TYPE SF I ACRES I
A, ACRES UNDEVELOPED-PASTURE 96,147 2.21
96,147 2.21
Q,CFS CIA 2.76
PROPOSED:
MANNING LENGTH DEPTH SLOPE TIME
SHEET FLOW n L, FT Pi, IN. s HOURS MIN
TC SMOOTH-CONCRETE 0.011 228 4.5 2.0% 0.03 2
TRAVEL V,FPS TIME
CONCENTRATED FLOW D,FT s Table C-4 SEC MIN
STREET /GUTTER 152 0.8% 2.5 61 1
10
TYPE C (Table C-3>1 % C I
C, -PHASE 1 + 2 ROOF/CONCRETE 0.92 68.0% 0.63
PHASE 1 + 2 GRASS AREAS -GOOD CONDITION (FLAT) 0.28 __ 3_2_.0_% ___ 0_.0_9
100.0% 0.71
I, IN/HR B/(TC+D)"E 6.33
TYPE SF I ACRES I
A, ACRES PHASE 1 + 2 ROOF/CONCRETE 80,809 1.86
PHASE 1 + 2 GRASS AREAS -GOOD CONDITION 38,083 0.87
118,892 2. 73
Q, CFS CIA 12.35
'
•,
CURRY PLUMBING 1/12/07 4:28 PM
CITY OF COLLEGE STATION, BRAZOS COUNTY, TEXAS
REFERENCE: UNIFIED STORMWATER DESIGN GUIDELINES, CITIES OF B/CS (March 2006)
STORM EVENT:
2YRSTORM
EXISTING
B
65
2YEARSTORM
Drainage Area 2 (Front)
D E
8.0 0.806
MANNING LENGTH DEPTH SLOPE TIME
SHEET FLOW n L, FT Pi, IN. S HOURS MIN
TC GRASS PRAIRIE 0.150 170 4.5 1.1% 0.27 16 .-----------.---......------------. TRAVEL V, FPS TIME
CONCENTRATED FLOW D, FT s Table C-4 SEC MIN
OVERLAND-GRASSLAND 0 0.0% 2.2 0 0
16
I TYPE C Cf.able C-3)l % c
C, -UNDEVELOPED-PASTURE (FLAT) 0.34 100.0% 0.34
100.0% 0.34
I, IN/HR B/(TC+D)11E 4.97
TYPE SF I ACRES I
A, ACRES UNDEVELOPED-PASTURE 38,967 0.89
38,967 0.89
Q,CFS CIA 1.51
PROPOSED:
MANNING LENGTH DEPTH SLOPE TIME
SHEET FLOW n L,FT Pi, IN . s HOURS MIN
TC SMOOTH-CONCRETE 0.011 70 4.5 0.4% 0.02
TRAVEL V,FPS TIME
CONCENTRATED FLOW D,FT s Table C-4 SEC MIN
STREET/GUTTER 61 1.1% 3.0 20 0
10
I TYPE C (Table C-3)! % C I
C, -PHASE 1 + 2 ROOF/CONCRETE 0.92 65.3% 0.60
PHASE 1 + 2 GRASS AREAS -GOOD CONDITION (FLAT) 0.28 34.7% 0.10
I, IN/HR B/(TC+D)11E
TYPE
A, ACRES PHASE 1 + 2 ROOF/CONCRETE
PHASE 1 + 2 GRASS AREAS -GOOD CONDITION
Q, CFS CIA
TP, HR TP 40, 100YR, 24 HR, INCHES
PERCENTIMPERVOUS
VOLUME RUNOFF, PERCENT
VOLUME RUNOFF, INCHES
TIME TO PEAK, HR
_1_0_0-.0-% ___ 0.--70-
6.33
SF I ACRES I
10,597 0.24
5,625 0.13
16,222 0.37
1.64
4.5
68%
85%
3.83
0.61
POND-2 Version: 5.21 S/N:
EXECUTED: 01-12-2007 11:33:48
***********************************
* *
*
*
*
*
*
Storm Water Detention Results *
Curry Plumbing *
College Station, TX *
2-Year Storm Event *
* ***********************************
Inflow Hydrograph: S:\ENGR\DETAIN\CURRY\2IN .HYO
Rating Table file: S:\ENGR\DETAIN\CURRY\CURRY .PND
----INITIAL CONDITIONS----
Elevation 91.80 ft
Outflow 0.00 cfs
Storage 0.00 ac-ft
INTERMEDIATE
Page 1
ROUTING
GIVEN POND DATA COMPUTATIONS
-------------------------------------------------------
I ELEVATION I OUTFLOW STORAGE 2S/t 2S/t + 0
I (ft) I (cfs) (ac-ft) (cfs) I (cfs)
1---------1-------------------------------1-------------
91. 80 I 0.0 0.000 0.0 I 0.0
92.00 I 0.1 0.000 0.0 I 0.1
92.20 I 0.3 0.002 0.2 I 0.5
92.40 I 0.5 0.006 0.6 I 1.1
92.60 I 0.7 0.012 1.2 I 1. 9
92.80 0.8 0.023 2.2 I 3.0
93.00 0.9 0 .038 3.6 I 4.5
93.20 1.0 0.057 5.5 I 6.5
93.40 1.1 0.079 7.6 I 8.7
93.60 1. 2 0 .104 10.1 I 11.3
93.80 1.3 0 .133 12.9 I 14.2
94.00 1.3 0.166 16.1 I 17.4
94.20 1. 4 0.202 19.5 I 20.9
94.40 1.5 0.239 23.1 I 24.6
94.60 1.5 0.277 26.8 I 28.3
94.80 1. 6 0.316 30.6 I 32.2
95 .00 1. 7 0.357 34.6 I 36.3
95.20 1. 7 0.399 38.6 I 40.3
95.40 1. 8 0.440 42.6 I 44.4
95.60 1. 8 0.482 46.7 I 48.5
95.65 1. 8 0.492 47.7 I 49.5
95 .80 1. 9 0.523 50 .7 I 52.6
96.00 2.2 0.565 54.7 I 56.9
96.20 2.6 0.607 58.7 I 61.3
96.40 3.0 0 .648 62.7 I 65.7
96 .60 3.3 0 .690 66.8 I 70.1
96.80 3 .6 0.731 70.8 I 74 .4
97 .00 3.8 0.773 74.8 I 78.6
97.20 4.1 0.814 78.8 I 82.9
97 .40 4.3 0.856 82.9 I 87.2
97.50 4.4 0.877 84.9 I 89.3 --------------------------------------------------------
\
EXECUTED 01-12 -2007
DISK FILES : 2IN .HYD
11:33:48
CURRY
GIVEN POND DATA
ELEVATION! OUTFLOW I STORAGE
(ft) I (cfs) I (ac-ft)
---------1---------1----------
97.60 I 4.4 I 0 .899
97 .80 I 4.6 I 0 .951
98.00 I 4.8 I 1.016
98 .20 I 5.0 I 1.094
98.40 I 5.1 I 1.184
98.50 I 5.2 I 1.234
98.60 I 5.3 I 1.288
98.80 I 6.5 I 1.406
99.00 I 11.4 I 1 .541
.PND
Page 2
INTERMEDIATE ROUTING
COMPUTATIONS
2S/t
I (cfs)
J------------
1 87.0
I 92.1
I 98.4
I 105.9
I 114. 6
I 119 . 5
I 124.7
I 136 .1
I 149.2
2S/t + 0
(cfs)
91. 4
96.7
103.2
110.9
119. 7
124.7
130. 0
142 .6
160 .6
Time increment (t) = 0 .250 hrs.
POND-2 Version: 5.21 S/N: Page 3
EXECUTED: 01-12-2007 11:33:48
Pond File: S:\ENGR\DETAIN\CURRY\CURRY .PND
.HYO
.HYO
Inflow Hydrograph: S:\ENGR\DETAIN\CURRY\2IN
Outflow Hydrograph : S:\ENGR\DETAIN\CURRY\OUT
INFLOW HYDROGRAPH ROUTING COMPUTATIONS
I TIME
I (hrs)
1--------
1 0.000
I 0.250
I 0.500
I 0.750
I 1. 000
I 1. 250
I 1. 500
I 1. 750
I 2.000
I 2 .250
I 2.500
I 2.750
I 3.000
I 3.250
I 3.500
I 3.750
I 4.000
I 4 .250
I 4.500
I 4.750
I 5.000
I 5.250
I 5.500
I 5.750
I 6.000
I 6.250
I 6.500
I 6.750
I 7.000
7.250
7.500
7.750
8.000
8.250
8.500
8.750
9.000
9.250
9.500
9.750
10.000
10.250
10.500
10.750
11 . 000
INFLOW
(cfs)
0.00
4.45
11. 39
10.81
6.36
3.73
2.19
1.29
0.76
0.44
0.26
0.151
0 .091
0.051
0.03
0.02
0.01
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0 .00
0.00
0.00
0.00
0 .00
0.00
0.00
0.00
0.00
Il+I2
(cfs)
4 .5
15.8
22 .2
17.2
10.1
5.9
3.5
2.1
1.2
0.7
0.4
0.2
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
2S/t -0
(cfs)
-0.0
2.7
15.8
34.6
48.1
53.5
54.6
53.5
51. 3
48.7
45.8
42.6
39.3
36.1
32.8
29.6
26.5
23.6
20.6
17.8
15.2
12.6
10.1
7.8
5 .7
3 .8
2.1
0 .6
-0 .1
-0.1
-0.1
-0 .1
-0.1
-0 .1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
2S/t + 0 I OUTFLOW IELEVATIONI
(c fs) I (cfs) I (ft) I
--------------------1---------1
0.0
4. 4
18.5
38.0
51. 8
58.1
59.4
58.1
55.5
52.5
49.4
46.2
42.8
39.5
36.11
32.81
29.61
26.61
23.61
20.61
17.81
15.21
12.61
10.1
7.8
5.7
3.8
2.1
0.6
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.11
-0.11
-0 .11
-0.11
-0.11
-0.11
-0.11
-0.11
-0.11
0 .00
0.89
1. 33
1. 70
1. 88
2.31
2.43
2.31
2.10
1. 90
1. 80
1. 80
1. 76
1. 70
1. 70
1. 61
1. 53
1.50
1.-4 7
1.39
1.31
1.30
1.25
1.15
1. 06
0.96
0.85
0. 72
0 .35
0.00
0.00
0 .00
0.00
0 .00
0.00
0.00
0 .00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
91. 80
92.99
94.06
95.09
95.76
96.06
96.12
96.05
95.94
95.80
95.65
95.49
95.32
95.16
94.99
94.83
94.67
94 .51
94.34
94.18
94.03
93 .86
93 .69
93.51
93.32
93.12
92.90
92.63
92 .25
91. 80
91. 80
91.80
91. 80
91. 80
91. 80
91. 80
91. 80
91 .80
91. 80
91. 80
91.80
91. 80
91. 80
91.80
91. 80
POND-2 Version: 5.21 S/N: Page 4
EXECUTED: 01-12-2007 11:33:48
Pond File: S:\ENGR\DETAIN\CURRY\CURRY .PND
Inf low Hydrograph: S:\ENGR\DETAIN\CURRY\2IN .HYO
Outflow Hydrograph: S:\ENGR\DETAIN\CURRY\OUT .HYO
INFLOW HYDROGRAPH ROUTING COMPUTATIONS
----------------------------------------------------------------------
TIME INFLOW I Il+I2 2S/t -0 2S/t + 0 I OUTFLOW ELEVATION
I (hrs) I (cfs) I (cfs) (cfs) I (cfs) I (cfs) (ft)
--------1---------1 ---------------------1-----------1------------------
11. 250 I 0.00 1 0.0 -0.1 I -0.11 0.00 91. 80
11.500 I 0.001 0.0 -0.1 I -0.11 0.00 91. 80
11.750 I 0.001 0.0 -0.1 I -0.1 0.00 91. 80
12.000 I 0.001 0.0 -0.1 I -0.1 0.00 91. 80
12.250 I 0.001 0.0 -0 .1 I -0.1 0.00 91. 80
12.500 I 0 .001 0.0 -0 .1 I -0 .1 0 .00 91. 80
12.750 I 0.001 0.0 -0.1 I -0.1 0 .00 91. 80
13.000 I 0.001 0.0 -0.1 I -0 .1 0 .00 91. 80
13.250 I 0.001 0.0 -0 .1 I -0.1 0.00 91. 80
13. 500 I 0.001 0.0 -0.1 I -0.1 0.00 91. 80
13.750 I 0 .00 0.0 -0.1 I -0.1 0.00 91. 80
14.000 I 0.00 0.0 -0.1 -0.1 0.00 91. 80
14.250 I 0.00 0.0 -0.1 -0.1 0.00 91. 80
14.500 0.00 0 .0 -0.1 -0.1 0.00 91. 80
14 .750 0 .00 0.0 -0.1 -0.1 0.00 91. 80
15.000 0 .00 0.0 -0 .1 -0.11 0.00 91. 80
15.250 0.00 0.0 -0.1 -0.1 1 0.00 91. 80
15.500 0 .00 0.0 -0.1 -0.11 0.00 91. 80
15 .750 0 .00 0.0 -0 .1 -0.11 0.00 91. 80
16.000 0 .00 0.0 -0.1 -0.11 0.00 91. 80
16.250 0.00 0.0 -0.1 -0.11 0.00 91. 80
16.500 0 .00 0.0 -0.1 -0.1 1 0.00 91. 80
16.750 0 .00 0.0 -0.1 -0.11 0.00 91.80
17.000 0 .00 0.0 -0.1 -0.11 0.00 91. 80
17.250 0 .001 0.0 -0.1 -0.11 0.00 91. 80
17'. 500 0 .001 0.0 -0.1 -0.11 0.00 91. 80
17.750 0.001 0.0 -0.1 -0.11 0.00 91. 80
18.000 0 .00 1 0.0 -0.1 -0 .11 0.00 91.80
18 .250 0.00 1 0.0 -0 .1 -0.11 0 .00 91. 80
18.500 0 .00 1 0.0 -0 .1 -0.11 0 .00 91. 80
18.750 0 .00 1 0.0 -0 .1 -0.1 1 0 .00 91. 80
19.000 0 .001 0.0 -0.1 -0.11 0.00 91. 80
19.250 0.001 0.0 -0.1 -0.11 0.00 91. 80
19.500 0.00 1 0.0 -0.1 -0.11 0.00 91.80
19.750 0.001 0.0 -0 .1 -0 .11 0.00 91. 80
20 .000 0.001 0.0 -0.1 -0.11 0 .00 91. 80
20.250 0 .001 0.0 -0.1 -0.11 0 .00 91. 80
20 .500 0.001 0.0 -0.1 -0.11 0 .00 91. 80
20 .750 0 .001 0.0 -0.1 -0.11 0 .00 91. 80
21.000 0.00 1 0.0 -0 .1 -0.11 0.00 91. 80
21 .250 0.001 0.0 -0.1 -0 .11 0.00 91. 80
21 .500 0.001 0.0 -0.1 -0.11 0.00 91. 80
21. 750 0.001 0.0 -0.1 -0.11 0.00 91. 80
22 .000 0.001 0.0 -0.1 -0.11 0.00 91. 80
22.250 0.001 0.0 -0.1 -0.11 0 .00 91. 80
22 .500 0.001 0.0 -0.1 -0.11 0 .00 91. 80 ------------------------------------------------------------------------
POND-2 Version: 5.21 S/N: Page 5
EXECUTED: 01-12-2007 11:33:48
Pond File: S:\ENGR\DETAIN\CURRY\CURRY .PND
.HYD
.HYD
Inflow Hydrograph: S:\ENGR\DETAIN\CURRY\2IN
Outflow Hydrograph: S:\ENGR\DETAIN\CURRY\OUT
INFLOW HYDROGRAPH ROUTING COMPUTATIONS
TIME INFLOW I Il+I2 2S/t -0 2S/t + 0 I OUTFLOW IELEVATIONI
I (hrs) I (cfs) I I (cfs) I (cfs) I (cfs) I (cfs) I (ft) I
1--------1---------1 1---------1------------1-----------1---------1---------1
I 22.750 I 0.001 I 0.0 I -0.1 I -0.11 o.oo I 91.80 I
I 23.000 I 0.001 I 0.0 I -0.1 I -0.11 0.00 I 91.80 I
I 23.250 I 0.001 I o.o I -0.1 I -0.11 o.oo I 91.80 I
I 23.500 I 0.001 I o.o I -0.1 I -0.11 o.oo I 91.80 I
I 23.750 I 0.001 I 0.0 I -0.1 I -0.11 0.00 I 91.80 I
I 24.000 I 0.001 I 0.0 I -0.1 I -0.11 o.oo I 91.80 I
\
POND-2 Version: 5.21 S/N: Page 6
EXECUTED: 01-12-2007 11:33:48
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File: S:\ENGR\DETAIN\CURRY\CURRY .PND
.HYD
.HYO
Inflow Hydrograph: S:\ENGR\DETAIN\CURRY\2IN
Outflow Hydrograph: S:\ENGR\DETAIN\CURRY\OUT
Starting Pond W.S . Elevation 91.80 ft
***** Summary of Peak Outflow and Peak Elevation
Peak Inflow
Peak Outflow
Peak Elevation
11.39 cfs
2.43 cfs
96.12 ft
***** Summary of Approximate Peak Storage *****
Initial Storage
Peak Storage From Storm
Total Storage in Pond
0.00 ac-ft
0.59 ac-ft
0.59 ac-ft
*****
0.0
.25
.5
.75
1. 0
1. 25
1. 5
1. 75
2 .0
2 .25
2 .5
2.75
3.0
3.25
3.5
3 .75
4 .0
4.25
4 .5
4.75
PON0-2 Version: 5.21 S/N:
Pond File: S :\ENGR\OETAIN\CURRY\CURRY
Inflow Hydrograph: S:\ENGR\OETAIN\CURRY\2IN
Outflow Hydrograph: S:\ENGR\OETAIN\CURRY\OUT
Peak Inf low
Peak Outflow
Peak Elevation
11.39 cfs
2 .43 cfs
96.12 ft
.PNO
.HYO
.HYO
Page 7
EXECUTED: 01-12-2007
11:33:48
Flow (cfs)
0 .0 1.5 3.0 4 .5 6.0 7.5 9 .0 10.5 12.0 13.5 15.0 16.5
.------1 -----1-----1-----1-----1-----1-----1-----1 -----1-----1-----1-
1
-Ix
I x
-I
I
-1
I
-I
I
-I
I
-I
I
-I
I
-1
I
-I
I *
-1 *
I *
-1 *
I *
-I *
I*
-I*
I*
-I*
I* -I*
I*
-I*
I*
-I*
I*
-I*
I*
-I*
I*
-I*
I
TIME
(hrs)
x
x
x
*
*
*
* *
*
*
x *
x *
x *
x *
x *
x *
x *
*x
* x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
* File: S:\ENGR\OETAIN\CURRY\2IN
x File: S:\ENGR\OETAIN\CURRY\OUT
.HYO
.HYO
Qmax
Qmax
11.4 cfs
2.4 cfs
\
·-
CURRY PLUMBING 1112107 4:28 PM
CITY OF COLLEGE STATION, BRAZOS COUNTY, TEXAS
REFERENCE: UNIFIED STORMWATER DESIGN GUIDELINES, cmES OF B/CS (March 2006)
STORM EVENT:
10 YR STORM
B D
80
E
8.5 0.763
10 YEAR STORM
Drainage Area 1 (Rear)
EXISTING
MANNING LENGTH DEPTH SLOPE TIME
SHEET FLOW n L, FT Pi, IN. S HOURS MIN
TC GRASS PRAIRIE 0.150 300 7.4 1.0% 0.34 20 .----T-RA_V_E_L __ ,,_V-.-F-PS---.,..---T-IM_E __ _,
CONCENTRATED FLOW D, FT S Table C-4 SEC MIN
OVERLAND-GRASSLAND 52 1.0% 0.8 65 1
22
I TYPE C (Table C-3)1 % C I
C, -UNDEVELOPED-PASTURE (FLAT) 0.34 100.0% 0.34 -------100.0% 0.34
I, IN/HR 8/(TC+D)AE 5.96
TYPE SF I ACRES I
A, ACRES UNDEVELOPED-PASTURE 96,147 2.21
96,147 2.21
Q,CFS CIA 4.47
PROPOSED:
MANNING LENGTH DEPTH SLOPE TIME
SHEET FLOW n L, FT Pi, IN. s HOURS MIN
TC SMOOTH-CONCRETE 0.011 228 7.4 2.0% 0.03 2
TRAVEL V,FPS TIME
CONCENTRATED FLOW D, FT s Table C-4 SEC MIN
STREET/GUTTER 152 0.8% 2.5 61 1
10
I TYPE C (Table C-3>1 % C I
C, -PHASE 1 + 2 ROOF/CONCRETE 0.92 68.0% 0.63
PHASE 1+2 GRASS AREAS-GOOD CONDITION (FLAT) 0.28 _ _,3 __ 2_.0_% ___ 0_.0_9
100.0% 0.71
I, IN/HR B/(TC+D)AE 8.63
I TYPE SF I ACRES I
A, ACRES PHASE 1 + 2 ROOF/CONCRETE 80,809 1.86
PHASE 1 + 2 GRASS AREAS -GOOD CONDITION 38,083 0.87
118,892 2.73
Q, CFS CIA 16.85
'
CURRY PLUMBING 1112101 4:28 PM
CITY OF COLLEGE STATION, BRAZOS COUNTY, TEXAS
REFERENCE: UNIFIED STORMWA TER DESIGN GUIDELINES, cmES OF BICS (March 2006)
STORM EVENT:
10YR STORM
B D
80
E
8.5 0.763
10 YEAR STORM
Drainage Area 2 (Front)
EXISTING
MANNING LENGTH DEPTH SLOPE TIME
SHEET FLOW n L, FT Pi, IN. S HOURS MIN
TC GRASS PRAIRIE 0.150 170 7.4 1.1% 0.21 13
r--=T=RA~V~E=L--,.......,.v..,...~F=P=s-.---=T~IM=E:-----,
,.-,,.c-=-o.,....,N-=-c=E.,..,.NT=RA,,....,..,T=E=D,...,F=L-::0,..,-W~---t----,D::-,-=F=T,.........---,s,,-----t Table C-4 SEC MIN
OVERLAND-GRASSLAND 0 0.0% 2.2 0 0
13
I TYPE C (Table C-3>1 % C I
C, -UNDEVELOPED-PASTURE (FLAT) 0.34 100.0% 0.34
-~1 o'"""o"'""'.o..,..%,..----::o"'""'.34...,...
I, IN/HR B/(TC+D)"E 7.78
TYPE SF I ACRES I
A, ACRES UNDEVELOPED-PASTURE 38,967 0.89
38,967 0.89
Q,CFS CIA 2.37
PROPOSED:
MANNING LENGTH DEPTH SLOPE TIME
SHEET FLOW n L,FT Pi, IN. s HOURS MIN
TC SMOOTH-CONCRETE 0.011 70 7.4 0.4% 0.02
TRAVEL V,FPS TIME
CONCENTRATED FLOW D,FT s Table C-4 SEC MIN
STREET/GUTIER 61 1.1% 3.0 20 0
10
I TYPE C (Table C-3>1 % C I
C, -PHASE 1 + 2 ROOF/CONCRETE 0.92 65.3% 0.60
PHASE 1+2 GRASS AREAS -GOOD CONDITION (FLAT) 0.28 __ 34_.7_% ___ 0_.1_0
100.0% 0.70
I, IN/HR B/(TC+D)"E 8.63
I TYPE SF I ACRES I
A, ACRES PHASE 1 + 2 ROOF/CONCRETE 10,597 0.24
PHASE 1 + 2 GRASS AREAS -GOOD CONDITION 5,625 0.13
16,222 0.37
Q,CFS CIA 2.24
TP, HR TP 40, 100YR, 24 HR, INCHES 7.4
PERCENTIMPERVOUS 68%
VOLUME RUNOFF, PERCENT 85%
VOLUMERUNOF~INCHES 6.29
TIME TO PEAK, HR 0.74
POND-2 Version: 5.21 S/N:
EXECUTED: 01-12-2007 11:34:44
***********************************
* *
*
*
*
*
Storm Water Detention Results *
Curry Plumbing *
College Station, TX *
10-Year Storm Event *
* * ***********************************
Inflow Hydrograph: S:\ENGR\DETAIN\CURRY\lOIN .HYD
Rating Tabl e file: S:\ENGR\DETAIN\CURRY\CURRY .PND
----INITIAL CONDITIONS----
Elevation 91.8 0 ft
Outflow 0.0 0 cfs
Storage 0.0 0 ac-ft
INTERMEDIATE
Page 1
ROUTING
GIVEN POND DATA COMPUTATIONS ------------------------------------------------------
ELEVATION OUTFLOW STORAGE I 2S/t 2S/t + 0
(ft) (cfs) (ac-ft) I I (cfs) I (cfs ) ----------------------------1 1------------1-------------
91. 80 0.0 0 .000 1 0.0 I 0 .0
92.00 0.1 0.0001 0.0 I 0.1
92 .. 20 0.3 0 .0021 0 .2 I 0.5
92 .40 0.5 0.0061 0.6 I 1.1
92 .60 0.7 0.0121 1.2 1. 9
92.80 0.8 0.0231 2 .2 3.0
93 .00 0.9 0 .0381 3.6 4.5
93.20 1.0 0 .0571 5.5 6.5
93.40 1.1 0 .079 1 7.6 8 .7
93 .60 1.2 0 .104 1 10.1 11. 3
93 .80 1.3 0 .13 31 12.9 14.2
94 .00 1.3 0.166 16.1 17.4
94 .20 1. 4 0 .202 19.5 20.9
94.40 1. 5 0.239 23 .1 24.6
94 . 60 1. 5 0.277 26.8 28.3
94.80 1. 6 0.316 30.6 32.2
95.00 1. 7 0.35 7 34.6 36.3
95.20 1. 7 0 .399 38.6 40.3
95.40 1. 8 0.440 42.6 44.4
95 .60 1. 8 0 .482 46.7 48.5
95.65 1. 8 0.492 47 .7 49.5
95.80 1. 9 0.523 50.7 52 .6
96. 00 2.2 0.565 54.7 56.9
96 .20 2.6 0 .607 58.7 61. 3
96.40 3.0 0.648 62.7 65.7
96. 60 3.3 0.690 66 .8 70.1
96 . 80 3.6 0.731 70.8 74.4
97 .00 3.8 0.773 74.8 78.6
97.20 4.1 0.814 78.8 82.9
97.40 4.3 0.856 82.9 87.2
97.50 4.4 0 .877 84 .9 89.3 --------------------------------------------------------
•,
EXECUTED 01-12-2007 11:34:44
DISK FILES: lOIN .HYD CURRY .PND
GIVEN POND DATA
ELEVATION! OUTFLOW I STORAGE I
(ft) I (cfs) I (ac-ft) I
---------1---------1----------1
97 .60 I 4.4 I 0.899 1
97.80 I 4.6 I 0.951 1
98.00 I 4.8 I 1.016 1
98.20 I 5.0 I 1.094 1
98.40 I 5.1 I 1.184 1
98 .50 I 5.2 I 1 .234 1
98.60 I 5.3 I 1.288 1
98.80 I 6.5 I 1.406 1
99 .00 I 11.4 I 1.541 1
Page 2
INTERMEDIATE ROUTING
COMPUTATIONS
2S/t
(cfs)
87.0
92.1
98 .4
105.9
114. 6
119 .5
124.7
136.1
149.2
2S/t + 0
(cfs) I
-------------1
91. 4 I
96.7 I
103.2 I
110. 9 I
119. 7 I
124.7 I
130 .0 I
142.6 I
160.6 I
Time increment (t) = 0.250 hrs.
·-
POND-2 Version: 5.21 S/N: Page 3
EXECUTED: 01-12-2007 11:34:44
Pond File: S:\ENGR\DETAIN\CURRY\CURRY .PND
Inflow Hydrograph: S:\ENGR\DETAIN\CURRY\lOIN .HYO
Outflow Hydrograph: S:\ENGR\DETAIN\CURRY\OUT .HYO
INFLOW HYDROGRAPH ROUTING COMPUTATIONS
---------------------------------------------------------------------
TIME INFLOW I I Il+I2 2S/t -0 2S/t + 0 OUTFLOW I ELEVATION I
(hrs) (cfs) I I (cfs) (cfs) I (cfs) (cfs) (ft) I -----------------1 1---------------------1-----------------------------!
0.000 0.001 -0.0 I 0.0 0.00 91. 80 I
0.250 4.321 4.3 2 .5 I 4.3 0.89 92.97 I
0.500 12.841 17.2 17.0 I 19.7 1.37 94.13 I
0.750 16.841 29.7 43.1 I 46.7 1.80 95 .51 I
1. 000 12.62 1 29.5 65.6 I 72 .5 3.47 96. 71 I
1. 250 8.141 20.8 77.8 I 86.3 4.26 97.36 I
1. 500 5.241 13. 4 82 .4 I 91. 2 4.40 97.59 I
1. 750 3.381 8.6 82.2 I 91. 0 4.40 97 .58 I
2.000 2.181 5.6 79.1 I 87.8 4.33 97.43 I
2.250 1. 40 3.6 74.5 I 82.7 4.08 97.19 I
2 .500 0.91 2.3 69 .4 I 76.8 3. 72 96 .92 I
2.750 0.58 1. 5 64.2 I 70.9 3.36 96.64 I
3.000 0.38 1. 0 59 .2 I 65.1 2.95 96.37 I
3 .250 0.24 0.6 54.9 I 59.9 2.47 96 .13 I
3.500 0.16 0.4 51.1 I 55.3 2.09 95.93 I
3.750 0.10 0.3 47 .7 51. 4 1. 86 95 .74 I
4.000 0 .0 6 0.2 44.2 47.8 1. 80 95.57 I
4.250 0.04 0.1 40.7 44.3 1. 80 95 .40 I
4.500 0.03 0.1 37.4 40.8 1. 71 95 .22 I
4.750 0.02 0.1 34 .0 37.4 1. 70 95.06 I
5.000 0.01 0.0 30 .8 34.1 1. 65 94.89 I
5.250 0.01 0.0 27.7 30.8 1.56 94 .73 I
5.500 0.00 0.0 24 .7 27.7 1.50 94 .57 I
5.750 0.00 0.0 21. 7 24.7 1.50 94.40 I
6.000 0.00 0.0 18.8 21. 7 1. 42 94 .24 I
6.250 0 .00 0.0 16.2 18.8 1.34 94.08
6.500 0.00 0.0 13.6 16.2 1.30 93. 92
6.750 0.00 0.0 11. 0 13. 6 1.28 93.76
7.000 0.00 0.0 8.6 11. 0 1.19 93 .58
7.250 0.00 0.0 6.4 8.61 1.10 93 .39
7.500 0.00 0.0 4.4 6.41 1.00 93.20
7.750 0.00 0.0 2.7 4.41 0.89 92.99
8.000 0 .00 0.0 1.1 2.7 0 .77 92.74
8.250 0.00 0.0 0.1 1.1 0.52 92.42
8.500 0.00 0.0 -0.0 0.1 0.07 91.93
8.750 0.00 0.0 -0.0 -0.0 0.00 91. 80
9 .000 0.00 0.0 -0.0 -0.0 0.00 91. 80
9.250 0.00 0.0 -0.0 -0.0 0.00 91. 80
9.500 0.001 0.0 -0.0 -0.0 0.00 91. 80
9.750 0.001 0.0 -0.0 -0.0 0.00 91.80
10.000 0.001 0.0 -0.0 -0.0 0.00 91. 80
10.250 0.001 0.0 -0.0 -0.0 0.00 91. 80
10.500 0.001 0.0 -0.0 -0.0 0.00 91. 80
10.750 0.001 0.0 -0.0 -0.0 0.00 91. 80
11. 000 0 .001 0.0 -0.0 -0.0 0.00 91. 80 ------------------------------------------------------------------------
' ' POND-2 Version: 5.21 S/N: Page 4 EXECUTED: 01-12-2007 11:34:44 Pond File: S:\ENGR\DETAIN\CURRY\CURRY .PND Inflow Hydrograph: S:\ENGR\DETAIN\CURRY\lOIN .HYO Outflow Hydrograph: S:\ENGR\DETAIN\CURRY\OUT .HYO INFLOW HYDROGRAPH ROUTING COMPUTATIONS ---------------------------------------------------------------------TIME I INFLOW I Il+I2 I 2S/t -0 2S/t + 0 OUTFLOW ELEVATION I (hrs) I (cfs) I (cfs) (cfs) (cfs) (cfs) (ft) 1--------1---------1 --------------------------------------------------11. 250 I 0.001 0.0 -0.0 -0.0 0.00 91. 80 11. 500 0.001 0.0 -0.0 -0.0 0.00 91. 80 11.750 0.001 0.0 -0.0 -0.0 0.00 91. 80 12.000 0.001 0.0 -0.0 -0.0 0.00 91. 80 12.250 0.001 0.0 -0.0 -0.0 0.00 91. 80 12.500 0.001 0.0 -0.0 -0.0 0.00 91.80 12.750 0.001 0.0 -0.0 -0.0 0.00 91. 80 13. 000 0.001 0.0 -0.0 -0.0 0.00 91. 80 13.250 0.001 0.0 -0.0 -0.0 0.00 91. 80 13. 500 0.00 0.0 -0.0 -0.0 0.00 91. 80 13.750 0.00 0.0 -0.0 -0.0 0.00 91.80 14.000 0.00 0.0 -0.0 -0.0 0.00 91. 80 14.250 0.00 0.0 -0.0 -0.0 0.00 I 91.80 14.500 0.00 0.0 -0.0 -0.0 o.oo I 91. 80 14.750 0.00 0.0 -0.0 -0.0 0.00 I 91. 80 15.000 0.00 0.0 -0.0 -0.0 0.00 91. 80 15.250 0.00 0.0 -0.0 I -0.01 0.00 91. 80 15.500 I 0.00 0.0 -o.o I -0.01 0.00 91.80 15.75'0 I 0.00 0.0 -0.0 I -0.01 0.00 91.80 16.000 I 0.00 0.0 -o.o I -0.01 0.00 91. 80 16.250 I 0.00 0.0 -0.0 -0.01 0.00 91.80 16.500 I 0.00 0.0 -0.0 -0.01 0.00 91. 80 16.750 I 0.00 0.0 -0.0 -0.01 0.00 91. 80 17.000 I 0.00 o.o I -0.0 -0.01 0.00 91. 80 17.250 I 0.00 o.o I -0.0 -0.01 0.00 91. 80 17.500 I 0.00 0.0 I -0.0 -0.01 0.00 91. 80 17.750 I 0.00 0.0 I -0.0 -0.01 0.00 91. 80 18.000 I 0.00 0.0 I -0.0 -0.01 0.00 91. 80 18.250 I 0.00 0.0 I -0.0 -0.01 0.00 91. 80 18.500 I 0.00 I o.o I -0.0 -0.01 o.oo I 91. 80 18.750 I 0.00 I 0.0 I -0.0 -0.01 0.00 I 91. 80 19.000 I 0.00 I o.o I -0.0 -0.01 o.oo I 91. 80 19.250 I 0.00 I 0.0 I -0.0 -0.01 o.oo I 91. 80 19.500 I 0.00 I o.o I -0.0 -0.01 0.00 I 91. 80 19.750 I 0.00 I 0.0 I -0.0 -0.01 0.00 I 91. 80 20.000 I 0.00 I 0.0 I -0.0 -0.01 0.00 I 91. 80 20.250 I 0.00 I 0.0 I -0.0 -0.01 o.oo I 91. 80 20.500 I 0.00 I 0.0 I -0.0 -0.01 0.00 I 91. 80 20.750 I 0.001 I 0.0 I -0.0 -0.01 o.oo I 91. 80 21. ooo I 0.001 I 0.0 I -0.0 -0.01 0.00 I 91. 80 21. 250 I 0.001 I 0.0 I -0.0 -0.01 o.oo I 91. 80 21. 500 I 0.001 I 0.0 I -0.0 -0.01 o.oo I 91. 80 21. 750 I 0.001 I o.o I -0.0 -0.01 0.00 I 91. 80 22.000 I 0.001 I 0.0 I -0.0 I -0.01 0.00 I 91. 80 22.250 I 0.001 I o.o I -0.0 I -0.01 o.oo I 91. 80 22.500 I 0.001 I o.o I -0.0 I -0.01 0.00 I 91. 80 ------------------------------------------------------------------------
POND-2 Version: 5.21 S/N: Page 5
EXECUTED: 01-12-2007 11:34:44
Pond File: S:\ENGR\DETAIN\CURRY\CURRY .PND
.HYD
.HYD
Inflow Hydrograph: S:\ENGR\DETAIN\CURRY\lOIN
Outflow Hydrograph: S:\ENGR\DETAIN\CURRY\OUT
INFLOW HYDROGRAPH
I TIME INFLOW I
I (hrs) I (cfs) I
1--------1---------1
I 22.750 I 0.001
I 23.000 I 0.001
I 23.250 I 0 .001
I 23.500 I 0.001
I 23 .750 I 0.001
I 24.000 I 0.001
ROUTING COMPUTATIONS
Il+I2 2S/t -0 2S/t + 0 I OUTFLOW IELEVATIONI
I (cfs) I (cfs) I (cfs) I (cfs) I (ft) I
1---------1------------1-----------1---------1---------1
I o.o I -0.0 I -0.01 0.00 I 91.80 I
I 0.0 I -o.o I -0.01 0.00 I 91.80 I
I 0.0 I -0.0 I -0.01 o.oo I 91 .80 I
I o.o I -0.0 I -0.01 0.00 I 91.80 I
I 0.0 I -o.o I -0.01 0.00 I 91.80 I
I o.o I -0 .0 I -0.01 0.00 I 91.80 i
POND-2 Version: 5 .21 S/N: Page 6
EXECUTED: 01-12-2007 11:34:44
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File: S :\ENGR\DETAIN\CURRY\CURRY .PND
.HYO
.HYO
Inflow Hydrograph: S:\ENGR\DETAIN\CURRY\l OIN
Outflow Hydrograph: S:\ENGR\DETAIN\CURRY\OUT
Starting Pond W.S. Elevation 91. 80 ft
***** Summary of Peak Outflow and Peak Elevation
Peak Inflow
Peak Outflow
Peak Elevation
16 .84 cfs
4 .40 cfs
97 .59 ft
***** Summary of Approximate Peak Storage *****
Initial Storage
Peak Storage From Storm
Total Storage in Pond
0.00 ac-ft
0.90 ac-ft
0 .90 ac-ft
*****
.25
.5
.75
1.0
1. 25
1. 5
1. 75
2.0
2.25
2.5
2.75
3.0
3.25
3.5
3.75
4.0
4.25
4.5
4.75
5.0
*
x
POND-2 Version: 5.21 S/N:
Pond File: S:\ENGR\DETAIN\CURRY\CURRY
Inflow Hydrograph: S:\ENGR\DETAIN\CURRY\lOIN
Outflow Hydrograph: S:\ENGR\DETAIN\CURRY\OUT
Peak Inflow
Peak Outflow
Peak Elevation
16.84 cfs
4.40 cfs
97.59 ft
.PND
.HYO
.HYO
Page 7
EXECUTED: 01-12-2007
11:34:44
Flow (cfs)
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0
.------1-----1-----1-----1-----1-----1-----1-----1-----1-----1-----1-
1
-I
I
-1
I
-1
I
-I
I
-I
I
-I
I
-I
I
-1
I
-I
I
-I
-
-
-
-
-
-
-
*
*
*
*
*
*
*
*
*
* -I*
I*
-I*
I
TIME
*
*
*
*
*
(hrs)
*
*
File:
File:
x
x
x
*
*
*
x
x
*
x
x
x
x
x
x
x
x
x
x
x
x
x
x
*
x
x
*
x
x
x
x
*
x
x
x
x
x
x
*
x
x
x
x
x
x
x
x
*
*
*
*
S:\ENGR\DETAIN\CURRY\lOIN
S:\ENGR\DETAIN\CURRY\OUT
*
.HYO
.HYO
*
*
*
Qmax
Qmax
*
*
16.8 cfs
4.4 cfs
\
CURRY PLUMBING 1112101 4:28 PM
CITY OF COLLEGE STATION, BRAZOS COUNTY, TEXAS
REFERENCE: UNIFIED STORMWATER DESIGN GUIDELINES, cmES OF B/CS (March 2006)
STORM EVENT:
25YRSTORM
B D
89
E
8.5 0.754
25 YEAR STORM
Drainage Area 1 (Rear)
EXISTING
MANNING LENGTH DEPTH SLOPE TIME
SHEET FLOW n L, FT Pi, IN. S HOURS MIN
TC GRASS PRAIRIE 0.150 300 8.4 1.0% 0.32 19
r---=TRA~V~E~L----,......,..,v~.F=P~S---r---=T~IM=E,....---.
~-------~------~------< CONCENTRATED FLOW D, FT S Table C-4 SEC MIN
OVERLAND-GRASSLAND 52 1.0% 0.8 65 1
20
I TYPE C (Table C-3ll % c I
C, -UNDEVELOPED-PASTURE (FLAT) 0.34 100.0% 0.34
100.0% 0.34
I, IN/HR B/(TC+D)"E 7.06
TYPE SF I ACRES I
A, ACRES UNDEVELOPED-PASTURE 96,1 47 2.21
96,147 2.21
Q,CFS CIA 5.30
PROPOSED:
MANNING LENGTH DEPTH SLOPE TIME
SHEET FLOW n L,FT Pi, IN. s HOURS MIN
TC SMOOTH-CONCRETE 0.011 228 8.4 2.0% 0.02
TRAVEL V,FPS TIME
CONCENTRATED FLOW D,FT s Table C-4 SEC MIN
STREET/GUTTER 152 0.8% 2.5 61 1
10
I TYPE C (Table C-3)1 % C I
C, -PHASE 1 + 2 ROOF/CONCRETE 0.92 68.0% 0.63
PHASE 1 + 2 GRASS AREAS -GOOD CONDITION (FLAT) 0.28 __ 3_2_.0_% ___ 0._09_
100.0% 0.71
I, IN/HR B/(TC+D)"E 9.86
I TYPE SF I ACRES I
A, ACRES PHASE 1 + 2 ROOF/CONCRETE 80,809 1.86
PHASE 1+2 GRASS AREAS-GOOD CONDITION 38,083 0.87
118,892 2.73
Q, CFS CIA 19.24
CURRY PLUMBING 1112101 4:28 PM
CITY OF COLLEGE STATION, BRAZOS COUNTY, TEXAS
REFERENCE: UNIFIED STORMWATER DESIGN GUIDELINES, CITTES OF B/CS (March 2006)
STORM EVENT:
25YR STORM
B D
89
E
8.5 0.754
25 YEAR STORM
Drainage Area 2 (Front)
EXISTING
MANNING LENGTH DEPTH SLOPE TIME
SHEET FLOW n L, FT Pi, IN . S HOURS MIN
TC GRASS PRAIRIE 0.150 ~-1_70 ___ 8_.4_~_1_.1_%"---~-0_.2_0 ____ 1~2
TRAVEL V, FPS TIME
CONCENTRATED FLOW D, FT S Table C-4 SEC MIN
OVERLAND-GRASSLAND 0 0.0% 2.2 0 0
12
I TYPE C (Table C-3>1 % c I
C, -UNDEVELOPED-PASTURE (FLAT) 0.34 100.0% 0.34
100.0% 0.34
I, IN/HR B/(TC+D)"E 9.15
TYPE SF I ACRES I
A, ACRES UNDEVELOPED-PASTURE 38,967 0.89
38,967 0.89
Q,CFS CIA 2.78
PROPOSED:
MANNING LENGTH DEPTH SLOPE TIME
SHEET FLOW n L,FT Pi, IN . s HOURS MIN
TC SMOOTH-CONCRETE 0.011 70 8.4 0.4% 0.02
TRAVEL V,FPS TIME
CONCENTRATED FLOW D,FT s Table C-4 SEC MIN
STREET /GUTTER 61 1.1% 3.0 20 0
10
I TYPE C (Table C-3>1 % C I
C, -PHASE 1 + 2 ROOF/CONCRETE 0.92 65.3% 0.60
PHASE 1 + 2 GRASS AREAS -GOOD CONDITION (FLAT) 0.28 __ 34_. 7_% ___ 0._10_
100.0% 0.70
I, IN/HR B/(TC+D)"E 9.86
I TYPE SF I ACRES I
A, ACRES PHASE 1 + 2 ROOF/CONCRETE 10,597 0.24
PHASE 1 + 2 GRASS AREAS -GOOD CONDITION 5,625 0.13
16,222 0.37
Q,CFS CIA 2.56
TP, HR TP 40, 1 OOYR, 24 HR, INCHES 8.4
PERCENT IMPERVOUS 68%
VOLUME RUNOFF, PERCENT 85%
VOLUME RUNOFF, INCHES 7.14
TIME TO PEAK, HR 0.73
. ',
POND-2 Version: 5.21 S/N: Page 1
EXECUTED: 01-12-2007 11:35 :10
***********************************
* *
*
*
*
*
*
Storm Water Detention Results *
Curry Plumbing *
College Station, TX *
25-Year Storm Event *
* ***********************************
Inflow Hydrograph: S :\ENGR\DETAIN\CURRY\25IN .HYD
Rating Table file: S :\ENGR\DETAIN\CURRY\CURRY .PND
----INITIAL CONDITIONS----
Elevation 91.80 ft
Outflow 0.00 cfs
Storage 0 .00 ac-ft
INTERMEDIATE ROUTING
GIVEN POND DATA COMPUTATIONS --------------------------------------------------------
I ELEVATION I OUTFLOW I STORAGE I 2S/t 2S/t + 0
I (ft) I (cfs) I (ac-ft) I (cfs) I (cfs) I ---------1---------1----------1 ------------1-------------1
91. 80 I 0.0 I 0 .000 0.0 I 0.0 I
92 .00 I 0 .1 I 0 .000 0.0 I 0.1 I
92.20 I 0.3 I 0 .002 0.2 I 0.5 I
92.40 I 0.5 I 0 .006 0.6 I 1.1 I
92 .60 I 0.7 I 0 .012 1.2 I 1. 9 I
92.80 I 0 .8 I 0.023 2.2 I 3.0 I
93.00 I 0.9 I 0.038 3.6 I 4.5 I
93 .20 1.0 I 0.057 5.5 I 6.5 I
93 .40 1.1 I 0.079 7.6 I 8.7
93 .60 1.2 I 0 .104 10.1 I 11. 3
93.80 1.3 I 0 .133 12.9 I 14.2
94.00 1.3 I 0 .166 16.1 I 17.4
94.20 1. 4 I 0.202 19.5 I 20.9
94.40 1.5 I 0.239 23.1 I 24 .6
94 .60 1. 5 I 0.277 26 .8 I 28.3
94 .80 1. 6 I 0.316 30.6 I 32.2
95 .00 1. 7 I 0.357 34.6 I 36 .3
95.20 1. 7 I 0.399 38 .6 I 40.3
95 .40 1.8 I 0.440 42.6 I 44.4
95.60 1. 8 I 0.482 46.7 I 48.5
95.65 1. 8 I 0.492 47.7 I 49.5
95.80 1. 9 I 0.523 50 .7 I 52.6
96 .00 2 .2 I 0.565 54.7 I 56.9
96 .20 2.6 I 0 .607 58.7 I 61.3
96 .40 3.0 I 0.648 62.7 I 65 .7
96 .60 3.3 I 0.690 66.8 I 70.1
96 . 80 3.6 I 0.731 70.8 I 74.4
97.00 3 .8 I 0.773 74.8 I 78.6
97.20 4 .1 I 0 .814 78.8 I 82.9
97.40 4.3 I 0.856 82 .9 I 87.2
97.50 4.4 I 0.877 84 .9 I 89.3
--------------------------------------------------------
EXECUTED 01-12-2007 11:35 :10
DISK FILES: 25IN .HYO CURRY
GIVEN POND DATA
IELEVATIONI OUTFLOW
I (ft) I (cfs) 1---------1---------
1 97.60 I 4.4
I 97.80 I 4.6
I 98.00 I 4.8
I 98.20 I 5.0
I 98.40 I 5.1
I 98.50 I 5.2
I 98.60 I 5.3
I 98.80 I 6.5
I 99.00 I 11.4
STORAGE
(ac-ft)
0 .899
0.951
1. 016
1. 094
1.184
1. 234
1. 288
1. 406
1. 541
.PND
Page 2
INTERMEDIATE ROUTING
COMPUTATIONS
2S/t
I (cfs) 1------------
1 87. 0
I 92.1
I 98.4
I 105.9
I 114. 6
I 119.5
I 124.7
I 136 .1
I 149.2
2S/t + 0
(cfs)
91. 4
96 .7
103.2
110.9
119. 7
124 .7
130 . 0
142.6
160.6
Time increment (t) = 0.250 hrs.
POND-2 Version: 5.21 S/N: Page 3
EXECUTED: 01-12-2007 11:35:10
Pond File: S:\ENGR\DETAIN\CURRY\CURRY .PND
Inflow Hydrograph: S:\ENGR\DETAIN\CURRY\25IN .HYO
Outflow Hydrograph: S:\ENGR\DETAIN\CURRY\OUT .HYO
INFLOW HYDROGRAPH ROUTING COMPUTATIONS ----------------------------------------------------------------------
I TIME INFLOW Il+I2 2S/t -0 2S/t + 0 I OUTFLOW I ELEVATION
I (hrs) (cfs) I (cfs) (cfs) I (cfs) I (cfs) (ft)
1-----------------1---------------------1-----------1------------------
I 0.000 0.00 I -0.0 I 0.01 0.00 91. 80
I 0.250 5.05 I 5.1 3.2 I 5.01 0.93 93.05
0.500 14.90 I 20.0 20.2 I 23.11 1. 46 94.32
0.750 19.20 I 34.1 50.3 I 54.31 2 .02 95.88
1. 000 14.07 I 33.3 75.3 I 83.61 4 .13 97.23
1.250 9.01 I 23.1 89.1 I 98.41 4.65 97.85
1.500 5.78 I 14.8 94.2 I 103.91 4.82 98.02
1.750 3.70 I 9.5 94.1 I 103.71 4.81 98.01
2.000 2.37 I 6.1 90.7 I 100.11 4.71 97.91
2.250 1. 52 I 3.9 85.6 I 94.61 4.52 97. 72
2.500 0.97 I 2.5 79.4 I 88.11 4.34 97.44
2 .750 0.62 I 1. 6 73.0 81. o I 3. 96 97.11
3.000 0.40 I 1. 0 66.9 74.11 3.58 96.79
3 .250 0.26 I 0.7 61. 3 67.61 3.13 96.48
3.500 0.16 I 0.4 56.5 61. 7 2.64 96.22
3.750 0.11 I 0.3 52.4 56.7 2.19 95.99
4. 000 0.07 I 0.2 48.7 52.5 1. 90 95.80
4.250 0.04 I 0.1 45.2 48.8 1. 80 95.62
4.500 0.03 I 0.1 41. 7 45.3 1.80 95.44
4.750 0.02 I 0.1 38.3 41. 8 1. 74 95.27
5.000 0.01 I 0.0 34.9 38.3 1. 70 95.10
5.250 0.01 I 0.0 31. 6 34.9 1. 67 94.93
5.500 0.00 I 0.0 28.5 31. 6 1. 58 94.77
5.750 0.00 0.0 25.4 28.5 1. 50 94.61
6.000 0.00 0.0 22.4 25.4 1. 50 94.45
6.250 0.00 0.0 19.6 22.4 1. 44 94.28
6.500 0.00 0.0 16.8 19.6 1. 36 94.12
6.750 0.00 0.0 14.2 16.8 1. 30 93.97
7.000 0.00 0.0 11. 6 14.2 1.30 93.80
7.250 0.00 0.0 9.2 11. 6 1.21 93. 62
7.500 0.00 0.0 7.0 9.2 1.12 93.44
7.750 0.00 0.0 4.9 7.0 1.02 93.24
8.000 0.00 0.0 3.1 4.9 0.92 93.04
8.250 0.00 0.0 1. 5 3.1 0.81 92.81
8.500 0.00 0.0 0.3 1.5 0.60 92.50
8.750 0.001 0.0 -0.1 0.3 0.18 92 .08
9.000 0.001 0.0 -0.1 -0.1 0.00 91. 80
9.250 0.001 0.0 -0.1 -0.1 0.00 91. 80
9.500 0.001 0.0 -0.1 -0.1 0.00 91. 80
9.750 0.001 0.0 -0.1 -0.1 0.00 91. 80
10.000 0.001 0.0 -0.1 -0.1 0.00 91. 80
10.250 0.001 0.0 -0.1 -0.1 0.00 91. 80
10.500 0.001 0.0 -0.1 -0.1 0.00 91. 80
10.750 0.001 0.0 -0.1 -0.1 0.00 91. 80
11. 000 0.001 0.0 -0.1 -0.11 0.00 91. 80 ------------------------------------------------------------------------
POND-2 Version: 5.21 S/N:
EXECUTED: 01-12-2007 11:35:10
Pond File: S:\ENGR\DETAIN\CURRY\CURRY
Inflow Hydrograph: S:\ENGR\DETAIN\CURRY\25IN
Outflow Hydrograph: S:\ENGR\DETAIN\CURRY\OUT
.PND
.HYD
.HYD
Page 4
INFLOW HYDROGRAPH ROUTING COMPUTATIONS
TIME
(hrs)
11. 250
11. 500
11. 750
12.000
12.250
12.500
12.750
13. 000
13. 250
13. 500
13.750
14.000
14.250
14.500
14.750
15.000
15.250
15.500
15.750
16.000
16.250
16.500
16.750
17.000
17.250
17.500
17.750
18.000
18.250
18.500
18.750
19.000
19.250
19.500
19.750
20.000
20.250
20.500
20.750
21.000
21.250
21. 500
21.750
22.000
22.250
22.500
INFLOW I
(cfs) I
---------1
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.001
0.001
Il+I2 2S/t -0 2S/t + 0
I (cfs) I (cfs) I (cfs)
1---------1------------1-----------
0.0 I
0.0 I
0.0 I o.o I
0.0 I o.o I
0.0 I o.o I
0.0 I
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
-0.1 I
-0.1 I
-0.1 I
-0.1 I
-0.1 I
-0.1 I
-0.1 I
-0.1 I
-0.1 I
-0.1 I
-0.1 I
-0.1 I
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.li
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
-0.1
OUTFLOW !ELEVATION
(cfs) (ft)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
91. 80
91. 80
91. 80
91. 80
91. 80
91. 80
91. 80
91. 80
91. 80
91. 80
91. 80
91.80
91.80
91. 80
91.80
91.80
91.80
91.80
91.80
91.80
91. 80
91.80
91. 80
91.80
91.80
91.80
91. 80
91. 80
91.80
91.80
91. 80
91.80
91. 80
91. 80
91. 80
91. 80
91. 80
91. 80
91.80
91. 80
91. 80
91. 80
91. 80
91. 80
91. 80
91. 80
' '
POND-2 Version: 5.21 S/N: Page 5
EXECUTED: 01-12-2007 11:35:10
Pond File: S:\ENGR\DETAIN\CURRY\CURRY .PND
.HYO
.HYO
Inflow Hydrograph: S:\ENGR\DETAIN\CURRY\25IN
Outflow Hydrograph: S:\ENGR\DETAIN\CURRY\OUT
INFLOW HYDROGRAPH
TIME INFLOW I
I (hrs) I (cfs) I
1--------1---------1
I 22.750 I 0.001
I 23.000 I 0.001
I 23.250 I 0.001
I 23.500 I 0.001
I 23 .750 I 0.001
I 24.000 I 0.001
ROUTING COMPUTATIONS
Il+I2 2S/t -0 2S/t + 0 I OUTFLOW IELEVATIONI
I (cfs) I (cfs) I (cfs) I (cfs) I (ft) I
1---------1------------1-----------1---------1---------1
I 0. 0 I -0 .1 I -0 .11 0. 00 I 91. 80 I
I 0.0 I -0.1 I -0.11 0.00 I 91.80 I
I 0.0 I -0.1 I -0.11 0.00 I 91.80 I
I o.o I -0.1 I -0.11 o.oo I 91.80 I
I 0.0 I -0.1 I -0.11 0.00 I 91.80 I
I 0.0 I -0.1 I -0.11 0.00 I 91.80 I
POND-2 Version: 5.21 S/N: Page 6
EXECUTED: 01-12-2007 11:35:10
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File: S:\ENGR\DETAIN\CURRY\CURRY .PND
Inflow Hydrograph: S:\ENGR\DETAIN\CURRY\25IN .HYD
Outflow Hydrograph: S:\ENGR\DETAIN\CURRY\OUT .HYO
Starting Pond W.S. Elevation 91. 80 ft
***** Surrunary of Peak Outflow and Peak Elevation
Peak Inf low
Peak Outflow
Peak Elevation
19.20 cfs
4.82 cfs
98.02 ft
***** Surrunary of Approximate Peak Storage *****
Initial Storage
Peak Storage From Storm
Total Storage in Pond
0.00 ac-ft
1. 02 ac-ft
1. 02 ac-ft
*****
. '
POND-2 Version: 5.21 S/N:
Pond File: S:\ENGR\DETAIN\CURRY\CURRY
Inflow Hydrograph: S:\ENGR\DETAIN\CURRY\25IN
Outflow Hydrograph: S:\ENGR\DETAIN\CURRY\OUT
Peak Inf low
Peak Outflow
Peak Elevation
19.20 cfs
4.82 cfs
98.02 ft
.PND
.HYD
.HYD
Page 7
EXECUTED: 01-12-2007
11:35:10
Flow (cfs)
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0
.------1-----1-----1-----1-----1-----1-----1-----1-----1-----1-----1-
.25
.5
.75
1. 0
1.25 -
1. 5
1.75 -
2.0
2.25 -
2.5
2.75
3.0
-1
I *
-I *
I *
-I *
*
x
*
x
x
*
x
*
x
x
*
*
*
3.25 -* x
*
3.5 -* x
* 3.75 -*
* x
4.0 -* x
*
4.25 -* x
*
4.5 -*
*
4.75 -I*
I*
5.0 -I*
I
TIME
(hrs)
x
x
x
x
x
x
x
x
x
x
x
*
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
*
*
*
*
* File: S:\ENGR\DETAIN\CURRY\25IN
x File: S:\ENGR\DETAIN\CURRY\OUT
*
*
.HYD
.HYD
*
Qmax
Qmax
*
*
*
*
19.2 cfs
4.8 cfs
CURRY PLUMBING 1112101 4:28 PM
CITY OF COLLEGE STATION, BRAZOS COUNTY, TEXAS
REFERENCE: UNIFIED STORMWA TER DESIGN GUIDELINES, cmES OF B/CS (March 2006)
STORM EVENT:
100YRSTORM
B D
96
E
8.0 0.73
. 100 YEAR STORM
Drainage Area 1 (Rear)
EXISTING
MANNING LENGTH DEPTH SLOPE TIME
SHEET FLOW n L, FT Pi, IN. S HOURS MIN
TC GRASS PRAIRIE 0.150 300 11 .0 1.0% 0.28 17
....------~---.....---------. TRAVEL V, FPS TIME
CONCENTRATED FLOW D, FT S Table C-4 SEC MIN
OVERLAND-GRASSLAND 52 1.0% 0.8 65
18
I TYPE C (Table C-3)1 % C I
c. -UNDEVELOPED-PASTURE (FLAT) 0.34 100.0% 0.34 -------100.0% 0.34
I, IN/HR B/(TC+D)"E 8.93
TYPE SF I ACRES I
A, ACRES UNDEVELOPED-PASTURE 96,147 2.21
96,147 2.21
Q,CFS CIA 6.70
PROPOSED:
MANNING LENGTH DEPTH SLOPE TIME
SHEET FLOW n L,FT Pi, IN. s HOURS MIN
TC SMOOTH-CONCRETE 0.011 228 11 .0 2.0% 0.02
TRAVEL V, FPS TIME
CONCENTRATED FLOW D, FT s Table C-4 SEC MIN
STREET/GUTTER 152 0.8% 2.5 61 1
10
I TYPE C (Table C-3ll % C I
c. -PHASE 1 + 2 ROOF/CONCRETE 0.92 68.0% 0.63
PHASE 1+2 GRASS AREAS -GOOD CONDITION (FLAT) 0.28 __ 3_2_.0_% ___ 0_.0_9
100.0% 0.71
I, IN/HR B/(TC+D)"E 11.64
I TYPE SF I ACRES I
A, ACRES PHASE 1 + 2 ROOF/CONCRETE 80,809 1.86
PHASE 1 + 2 GRASS AREAS -GOOD CONDITION 38,083 0.87
118,892 2.73
Q, CFS CIA 22.71
. '
CURRY PLUMBING 1112101 4:28 PM
CITY OF COLLEGE STATION, BRAZOS COUNTY, TEXAS
REFERENCE: UNIFIED STORMWATER DESIGN GUIDELINES, cmES OF B/CS (March 2006)
STORM EVENT:
100 YR STORM
EXISTING
B D E
96 8.0 0.73
100 YEAR STORM
Drainage Area 2 (Front)
MANNING LENGTH DEPTH SLOPE TIME
SHEET FLOW n L, FT Pi, IN . S HOURS . MIN
TC GRASS PRAIRIE 0.150 170 11 .0 1.1% 0.17 10
.---~T=RA..,...,..,v=EL~-..,......,v~.~F=P=s""T"""--~T~IM~E=-----i
~-------~--~---~----! CONCENTRATED FLOW D, FT S Table C-4 SEC MIN
OVERLAND-GRASSLAND 0 0.0% 2.2 0 0
10
I TYPE C (Table C-3)1 % c I
c. -UNDEVELOPED-P.ASTURE (FLAT) 0.34 100.0% 0.34
100.0% 0.34
I, IN/HR B/(TC+D)11E 11 .44
I TYPE SF I ACRES I
A, ACRES UNDEVELOPED-PASTURE 38,967 0.89
38,967 0.89
Q, CFS CIA 3.48
PROPOSED:
MANNING LENGTH DEPTH SLOPE TIME
SHEET FLOW n L,FT Pi, IN. s HOURS MIN
TC SMOOTH-CONCRETE 0.011 70 11 .0 0.4% 0.02
TRAVEL V,FPS TIME
CONCENTRATED FLOW D,FT s Table C-4 SEC MIN
STREET /GUTTER 61 1.1% 3.0 20 0
10
I TYPE C (Table C-3)1 % C
c. -PHASE 1 + 2 ROOF/CONCRETE 0.92 65.3% 0.60
PHASE 1+2 GRASS AREAS -GOOD CONDITION (FLAT) 0.28 __ 34_.7_% ___ 0_.1_0
100.0% 0.70
I, IN/HR B/(TC+D)11E 11.64
I TYPE SF I ACRES I
A, ACRES PHASE 1 + 2 ROOF/CONCRETE 10,597 0.24
PHASE 1 + 2 GRASS AREAS -GOOD CONDITION 5,625 0.13
16,222 0.37
Q,CFS CIA 3.03
TP, HR TP 40, 100YR, 24 HR, INCHES 11
PERCENTIMPERVOUS 68%
VOLUME RUNOFF, PERCENT 87%
VOLUME RUNOFF, INCHES 9.57
TIME TO PEAK, HR 0.83
POND-2 Version: 5 .21 S/N:
EXECUTED: 01-12-2007 11:35:38
***********************************
* *
*
*
*
*
Storm Water Detention Results *
Curry Plumbing *
College Station, TX *
100-Year Storm Event *
* * ***********************************
Inflow Hydrograph: S:\ENGR\DETAIN\CURRY\lO OIN .HYO
Rating Table file: S:\ENGR\DETAIN\CURRY\CURRY .PND
----INITIAL CONDITIONS----
Elevation 91.80 ft
Outflow 0.00 cfs
Storage 0.00 ac-ft
INTERMEDIATE
Page 1
ROUTING
GIVEN POND DATA COMPUTATIONS -----------------------------------------------------
ELEVATION OUTFLOW STORAGE 2S/t 2S/t + 0
(ft) (cfs) (ac-ft ) (cfs) (cfs ) -----------------------------------------------------
91. 80 0 .0 0.000 0.0 0 .0
92 .00 0.1 0 .000 0 .0 0.1
92.20 0 .3 0.002 0 .2 0.5
92 .40 0.5 0 .006 0.6 1.1
92.60 0 .7 0 .012 1. 2 1. 9
92.80 0.8 0 .023 2.2 3 .0
93.00 0 .9 0 .038 3.6 4 .5
93 .20 1. 0 0.057 5 .5 6 .5
93.40 1.1 0 .079 7.6 8 .7
93 .60 1.2 0 .104 10 .1 11. 3
93 .80 1. 3 0.133 I 12.9 14 .2
94 .00 1. 3 0 .166 I 16.1 17.4
94 .20 1. 4 0 .202 I 19.5 20 .9
94 .40 1. 5 0 .239 I 23 .1 24 .6
94 .60 1. 5 0 .277 I 26.8 28 .3
94 .80 1. 6 0 .316 I 30.6 32 .2
95 .00 1. 7 0 .357 I 34.6 36.3
95.20 1. 7 0 .399 I 38.6 40 .3
95.40 1. 8 0 .440 I 42.6 44 .4
95.60 1. 8 0.482 I 46 .7 48.5
95 .65 1. 8 0.492 I 47.7 49.5
95.80 1. 9 0.523 I 50.7 52.6
96 . 00 2.2 0.565 I 54 .7 56 .9
96 .20 2.6 0.607 I 58 .7 61. 3
96 .40 3 .0 0.648 I 62 .7 65 .7
96 . 60 3 .3 0.690 I 66.8 70.1
96. 80 3 .6 0.731 I 70 .8 74 .4
97.00 3.8 0 .773 I 74 .8 78 .6
97 .20 4.1 0 .814 I 78.8 82.9
97 .40 4.3 0 .8561 I 82.9 87 .2
97 .50 4.4 0.8771 I 84.9 89.3 --------------------------------------------------------
EXECUTED 01-12-2007 11:35:38
DISK FILES: lOOIN .HYO CURRY
GIVEN POND DATA
----------------------------
ELEVATION OUTFLOW STORAGE
(ft) (cfs) (ac-ft)
----------------------------
97.60 4.4 0.899
97.80 4.6 0.951
98.00 4.8 1. 016
98.20 5.0 1. 094
98.40 5.1 1.184
98.50 5.2 1. 234
98.60 5.3 1. 288
98.80 6.5 1. 406
99.00 11. 4 1. 541
.PND
Page 2
INTERMEDIATE ROUTING
COMPUTATIONS
2S/t 2S/t + 0
(cfs ) I (cfs)
------------1-------------
87 .0 I 91.4
92.1 I 96.7
98.4 I 103.2
105.9 I 110.9
114.6 I 119.7
119.5 I 124.7
124.7 I 130.0
136.1 I 142.6
149.2 I 160.6
Time increment (t) = 0.250 hrs.
POND-2 Version: 5.21 S/N: Page 3
EXECUTED: 01-12-2007 11:35:38
Pond File: S:\ENGR\DETAIN\CURRY\CURRY .PND
Inflow Hydrograph: S:\ENGR\DETAIN\CURRY\lOOIN .HYO
Outflow Hydrograph: S:\ENGR\DETAIN\CURRY\OUT .HYO
INFLOW HYDROGRAPH ROUTING COMPUTATIONS
---------------------------------------------------------------------
TIME INFLOW I 11+12 2S/t -0 2S/t + 0 OUTFLOW ELEVATION!
(hrs) (cfs) (cfs) (cfs) I (cfs) (cfs) (ft) I --------------------------------------!-----------------------------!
0.000 0.00 -0.0 I 0.0 0.00 91. 80 I
0.250 4. 72 4.7 2.9 I 4.7 0.91 93.02 I
0.500 14.95 19.7 19.7 I 22.6 1. 44 94.29 I
0.750 22.19 37.1 52.4 I 56.8 2.19 96.00 I
1. 000 20.44 42.6 86.0 I 95.1 4.54 97.74 I
1.250 13.91 34.4 110.1 I 120.3 5.11 98.41 I
1. 500 9.41 23.3 122.2 I 133. 4 5.63 98.65 I
1.750 6.36 15.8 125.8 I 137.9 6.06 98.73 I
2.000 4.30 10.7 124.7 I 136.5 5.92 98.70 I
2.250 2.91 7.2 120.9 I 131. 9 5.48 98.63 I
2.500 1. 96 4. 9 115 .3 I 125.8 5.22 98.52 I
2.750 1.33 3.3 108.4 I 118. 6 5.09 98.38 I
3.000 0.901 2.2 100.7 I 110. 7 5.00 98.20 I
3.250 0.611 1. 5 92.7 102.2 4.77 97.97 I
3.500 0.411 1. 0 84.7 93.7 4.49 97.69 I
3.750 0.281 0.7 77.0 85.4 4.22 97.32 I
4.000 0.191 0.5 69.9 77.4 3.74 96.94 I
4.250 0.131 0.3 63.6 70.3 3.31 96. 61 I
4.500 0.091 0.2 58.2 63.9 2.83 96.31 I
4.750 0.061 0.2 53.7 58.3 2.33 96.07 I
5.000 0.041 0.1 49.8 53.8 1. 98 95.86 I
5.250 0.03 0.1 46.3 49.9 1. 81 95.67 I
5.500 0.02 0.1 42.7 46.3 1. 80 95.49 I
5.750 0.01 0.0 39.2 42.7 1. 76 95.32
6.000 0.01 0.0 35.8 39.2 1. 70 95.15
6.250 0.01 0.0 32.5 35.9 1. 69 94.98
6.500 0.00 0.0 29.3 32.5 1. 61 94.81
6.750 0.00 0.0 26.2 29.3 1.52 94.65
7.000 0.00 0.0 23.2 26.2 1. 50 94.49
7.250 0.00 0.0 20.3 23.2 1. 46 94.32
7.500 0.00 0.0 17.5 20.3 1. 38 94.16
7.750 0.00 0.0 14.9 17.5 1. 30 94.01
8.000 0.00 0.0 12.3 14.9 1. 30 93.85
8.250 0.00 0.0 9.9 12.3 1.24 93.67
8.500 0.00 0.0 7.6 9.9 1.14 93.49
8.750 0.00 0.0 5.5 7. 6 1. 05 93.30
9.000 0.00 0.0 3.6 5.5 0.95 93.10
9.250 O.OOJ 0.0 1. 9 3.6 0.84 92.88
9.500 O.OOJ 0.0 0.5 1. 9 0.70 92. 60
9.750 O.OOJ 0.0 -0.1 0.5 0.30 92.20
10.000 O.OOJ 0.0 -0.1 -0.1 0.00 91.80
10.250 0.001 0.0 -0.1 -0.1 0.00 91. 80
10.500 0.001 0.0 -0.1 -0.1 0.00 91. 80
10.750 0.001 0.0 -0.1 -0.1 0.00 91. 80
11. 000 O.OOJ 0.0 -0.1 -0.1 0.00 91. 80
------------------------------------------------------------------------
POND-2 Version: 5.21 S/N : Page 4
EXECUTED: 01-12-2007 11:35:38
Pond File: S:\ENGR\DETAIN\CURRY\CURRY .PND
Inflow Hydrograph: S:\ENGR\DETAIN\CURRY\lOOIN .HYD
Outflow Hydrograph : S:\ENGR\DETAIN\CURRY\OUT .HYO
INFLOW HYDROGRAPH ROUTING COMPUTATIONS
---------------------------------------------------------------------
I TIME INFLOW I Il+I2 2S/t -0 2S/t + 0 OUTFLOW I ELEVATION I
I (hrs) (c fs) I (cfs) (cfs) I (cfs) (cfS) I (ft) I
1-----------------1 ---------------------1--------------------1---------1
I 11. 250 0 .00 0.0 -0.1 -0.1 0 .00 91. 80
I 11. 500 0.00 0.0 -0.1 -0.1 0.00 91 .80
I 11. 750 0.00 0.0 -0.1 -0.1 0.00 91. 80
I 12 .000 0.00 0.0 -0.1 -0.1 0 .00 91. 80
I 12.250 0.00 0.0 -0 .1 -0.1 0.00 91. 80
12.500 0 .00 0.0 -0.1 -0.1 0.00 91. 80
12.750 0.00 0.0 -0.1 -0.1 0.00 91. 80
13.000 0.00 0 .0 -0 .1 -0.1 0 .00 91. 80
13.250 0.00 0.0 -0.1 -0.1 0.00 91. 80
13. 500 0 .00 0.0 -0 .1 -0.1 0.00 91. 80
13. 750 0 .00 0 .0 -0 .1 -0.1 0.00 91.80
14.000 0 .00 0.0 -0.1 -0.1 0.00 91. 80
14.250 0.00 0.0 -0.1 -0.1 0.00 91.80
14.500 0.00 0 .0 -0.1 -0.1 0.00 91. 80
14.750 0 .00 0.0 -0.1 -0 .1 0 .00 91. 80
15.000 0.00 0.0 -0.1 -0.1 0 .00 91.80
15.250 0 .00 0.0 -0.1 -0.1 0.00 91.80
15 .500 0.00 0.0 -0.1 -0.11 0.00 91.80
15.750 -0 .00 0 .0 -0.1 -0.11 0.00 91. 80
16.000 0.00 0.0 -0.1 -0.11 0.00 91.80
16.250 0.00 0.0 -0.1 -0 .11 0.00 91. 80
16.500 0.00 0.0 -0.1 -0.11 0.00 91. 80
16.750 0.00 0.0 -0 .1 -0.1 1 0.00 91. 80
17.000 0.00 0 .0 -0.1 -0.11 0.00 91. 80
17.250 0.00 0.0 -0 .1 -0.1 0.00 91. 80
17.500 0.00 0.0 -0.1 -0.1 0.00 91.80
17.750 0.00 0.0 -0.1 -0.1 0.00 91. 80
18.000 0.00 0.0 -0.1 -0.1 0.00 91. 80
18.250 0.00 0.0 -0.1 -0.1 0.00 91 .80
18.500 0 .00 0.0 -0.1 -0.1 0.00 91. 80
18.750 0.00 0.0 -0.1 -0.1 0 .00 91 .80
19.000 0.00 0.0 -0.1 -0.1 0.00 91. 80
19.250 0.00 0.0 -0.1 -0.1 0.00 91. 80
19.500 0.00 0.0 -0.1 -0 .1 0.00 91. 80
19.750 0.00 0.0 -0.1 -0.1 0.00 91. 80
20.000 0.00 0.0 -0 .1 -0.1 0 .00 91. 80
20.250 0.00 0.0 -0 .1 -0 .1 0.00 91. 80
20.500 0.00 0.0 -0.1 -0'.1 0.00 91. 80
20.750 0.00 0.0 -0 .1 -0.1 0.00 91. 80
21.000 0.00 0.0 -0.1 -0.11 0.00 91. 80
21. 250 0 .00 0.0 -0.1 -0.11 0.00 91. 80
21. 500 0.00 0.0 -0.1 -0 .11 0.00 91. 80
21.750 0.001 0.0 -0.1 -0.11 0.00 91. 80
22.000 0.001 0.0 -0.1 -0.11 0.00 91. 80
22.250 0.001 0.0 -0 .1 -0.11 0.00 91. 80
22.500 0.001 0.0 -0.1 -0.11 0.00 91. 80 ------------------------------------------------------------------------
POND-2 Version: 5.21 S/N: Page 5
EXECUTED: 01-12-2007 11:35:38
Pond File: S:\ENGR\DETAIN\CURRY\CURRY
Inflow Hydrograph: S:\ENGR\DETAIN\CURRY\lOOIN
Outflow Hydrograph: S:\ENGR\DETAIN\CURRY\OUT
.PND
.HYD
.HYD
INFLOW HYDROGRAPH
TIME INFLOW I
I (hrs) I (cfs) I
1--------1---------1
I 22 .750 I 0.001
I 23.000 I 0.001
I 23.250 I 0.001
I 23.500 I 0.001
I 23 .750 I 0.001
I 24.000 I 0.001
ROUTING COMPUTATIONS
Il+I2 2S/t -0 2S/t + 0 I OUTFLOW !ELEVATION!
I (cfs) I (cfs) I (cfs) I (cfs) I (ft) I
1---------1------------1-----------1---------1---------1
I o.o I -0.1 I -0 .11 0.00 I 91.80 I
I 0.0 I -0.1 I -0.11 0.00 I 91.80 I
I 0.0 I -0.1 I -0.11 0.00 I 91.80 I
I o.o I -0.1 I -0.11 0.00 I 91.80 I
I 0.0 I -0.1 I -0.11 o.oo I 91.80 I
I o.o I -0.1 I -0.11 0.00 I 91.80 I
POND-2 Version: 5.21 S/N: Page 6
EXECUTED: 01-12-2007 11:35:38
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File: S :\ENGR\DETAIN\CURRY\CURRY .PND
Inflow Hydrograph: S:\ENGR\DETAIN\CURRY\lOOIN .HYD
Outflow Hydrograph: S :\ENGR\DETAIN\CURRY\OUT .HYD
Starting Pond W.S. Elevation 91. 80 ft
***** Summary of Peak Outflow and Peak Elevation
Peak Inf low
Peak Outflow
Peak Elevation
22.19 cfs
6.06 cfs
98.73 ft
***** Summary of Approximate Peak Storage *****
Initial Storage
Peak Storage From Storm
Total Storage in Pond
0.00 ac-ft
1.36 ac-ft
1.36 ac-ft
*****
POND-2 Version: 5.21 S/N:
Pond File: S:\ENGR\DETAIN\CURRY\CURRY
Inflow Hydrograph: S :\ENGR\DETAIN\CURRY\lOOIN
Outflow Hydrograph: S:\ENGR\DETAIN\CURRY\OUT
Peak Inf low
Peak Outflow
Peak Elevation
22.19 cfs
6.06 cfs
98 .73 ft
.PND
.HYD
.HYD
Page 7
EXECUTED: 01-12-2007
11:35:38
Flow (cfs)
0.0 2 .0 4.0 6.0 8 .0 10.0 12.0 14.0 16.0 18.0 20.0 22.0
------1-----1-----1-----1-----1-----1-----1-----1-----1-----1-----1 -
.25
.5
.75
1. 0
1.25 -
1. 5
1.75 -
2.0
2.25 -
2.5
2.75 -
3.0
3.25 -
3.5 *
* 3.75 -*
4.0
* 4 .25 -*
*
4.5 -*
*
4.75 -*
*
*
*
*
*
*
x
*
*
x
x
*
x
*
x
*
*
x
x
5 .0 -* x
TIME
(hrs)
x
*
x
x
x
x
*
x
x
x
*
x
x
x
*
x
x
x
x
x
x
x
x
x
x
x
x
x
x*
* x
x
x
x
x
x
*
*
*
* File: S:\ENGR\DETAIN\CURRY\lOOIN
x File: S:\ENGR\DETAIN\CURRY\OUT
*
.HYD
.HYD
*
Qmax
Qmax
*
*
*
22.2 cfs
6 .1 cfs
*
*
*