Loading...
HomeMy WebLinkAboutFire Flow AnalysisSchultz Engineering, LLC Office: 979.764.3900 Fax: 979.764.3910 July 10, 2012 Alan Gibbs, P.E. City Engineer Development Services City of College Station College Station, Texas RE: FIRE FLOW ANALYSIS PRIMROSE SCHOOL PROJECT (LOT 1, BLOCK 2 - TOWER POINT SUBDIVISION PH. 12) COLLEGE STATION, TEXAS Mr. Gibbs: This letter is provided in lieu of a formal water system analysis for Lot 1, Block 2 of the Tower Point Subdivision Phase 12. The Primrose School Project will tie into an existing 6" water line stub designed by Walter P. Moore in the plan set titled "Tower Point Infrastructure Plans for Phase 12, Lots 1-3, Block 2" and the associated Water Report. The building planned in the development is 12,000 sf and will be built using Type V-B construction. The International Fire Code requires a minimum fire flow of 3,000 gpm. The building will be fully sprinkled which decreases the required fire flow by 50% (1,500 gpm). This flowrate can be met using the existing fire hydrant on Arrington Road. As a result, no additional analysis was performed on the system, since the existing system is adequate to handle the demand. If you have questions regarding the water system in either phase, please feel free to contact me at your convenience. Sincerely, OF I e Civil Engineer JOS•EPH• P:••S V F-12327 SCHULTZ ENGINEERING, LLC. P.O. Box 11995 • College Station, Texas 77842 schultzengineeringllc.com