HomeMy WebLinkAboutSanitary Sewer DesignSchultz Engineering, LLC
Office: 979.764.3900
Fax: 979.764.3910
July 10, 2012
Alan Gibbs, P.E.
City Engineer
Development Services
City of College Station
College Station, Texas
RE: SANITARY SEWER DESIGN
PRIMROSE SCHOOL PROJECT (LOT 1, BLOCK 2 —TOWER POINT SUBDIVISION
PH. 12)
COLLEGE STATION, TEXAS
Mr. Gibbs:
Accompanying this letter are the construction plans for the Primrose School Project. The
proposed building connects to a sanitary sewer manhole designed by Walter P. Moore in the plan
set titled "Tower Point Infrastructure Plans for Phase 12, Lots 1-3, Block 2" and the associated
Sewer Report.
The sanitary sewer system that the Primrose School Project connects to was designed to handle
full build out of Lot 1. The use for Lot 1 is within the assumptions of the "Tower Point
Infrastructure Plans for Phase 12, Lots 1-3, Block 2" plans and the associated Sewer Report. As
a result, a separate sanitary sewer report is not being submitted with this project. If you have
questions regarding the sanitary sewer system in either phase, please feel free to contact me at
your convenience.
Sincerely,
Joe chintz, P.E.
Civil Engineer
SCHULTZ ENGINEERING, LLC,
P.O. Box 11995 • College Station, Texas 77842
schultzengineeringilc.com
t'L
Schultz Engineering, LLC
Office: 979.764.3900
Fax: 979.764.3910
July 10, 2012
Alan Gibbs, P.E.
City Engineer
Development Services
City of College Station
College Station, Texas
RE: SANITARY SEWER DESIGN
PRIMROSE SCHOOL PROJECT (LOT 1, BLOCK 2 — TOWER POINT SUBDIVISION
PH. 12)
COLLEGE STATION, TEXAS
Mr. Gibbs:
Accompanying this letter are the construction plans for the Primrose School Project. The
proposed building connects to a sanitary sewer manhole designed by Walter P. Moore in the plan
set titled "Tower Point Infrastructure Plans for Phase 12, Lots 1-3, Block 2" and the associated
Sewer Report.
The sanitary sewer system that the Primrose School Project connects to was designed to handle
full build out of Lot 1. The use for Lot I is within the assumptions of the "Tower Point
Infrastructure Plans for Phase 12, Lots 1-3, Block 2" plans and the associated Sewer Report. As
a result, a separate sanitary sewer report is not being submitted with this project. If you have
questions regarding the sanitary sewer system in either phase, please feel free to contact me at
your convenience.
Sincerely,
Joe chultz, P.E.
Civil Engineer
OF
U F-12327
SCHULTZ ENGINEERING, LLC.
P.O. Box 11995 • College Station, Texas 77842
schultzengi neering lic.com