Loading...
HomeMy WebLinkAboutSanitary Sewer DesignSchultz Engineering, LLC Office: 979.764.3900 Fax: 979.764.3910 July 10, 2012 Alan Gibbs, P.E. City Engineer Development Services City of College Station College Station, Texas RE: SANITARY SEWER DESIGN PRIMROSE SCHOOL PROJECT (LOT 1, BLOCK 2 —TOWER POINT SUBDIVISION PH. 12) COLLEGE STATION, TEXAS Mr. Gibbs: Accompanying this letter are the construction plans for the Primrose School Project. The proposed building connects to a sanitary sewer manhole designed by Walter P. Moore in the plan set titled "Tower Point Infrastructure Plans for Phase 12, Lots 1-3, Block 2" and the associated Sewer Report. The sanitary sewer system that the Primrose School Project connects to was designed to handle full build out of Lot 1. The use for Lot 1 is within the assumptions of the "Tower Point Infrastructure Plans for Phase 12, Lots 1-3, Block 2" plans and the associated Sewer Report. As a result, a separate sanitary sewer report is not being submitted with this project. If you have questions regarding the sanitary sewer system in either phase, please feel free to contact me at your convenience. Sincerely, Joe chintz, P.E. Civil Engineer SCHULTZ ENGINEERING, LLC, P.O. Box 11995 • College Station, Texas 77842 schultzengineeringilc.com t'L Schultz Engineering, LLC Office: 979.764.3900 Fax: 979.764.3910 July 10, 2012 Alan Gibbs, P.E. City Engineer Development Services City of College Station College Station, Texas RE: SANITARY SEWER DESIGN PRIMROSE SCHOOL PROJECT (LOT 1, BLOCK 2 — TOWER POINT SUBDIVISION PH. 12) COLLEGE STATION, TEXAS Mr. Gibbs: Accompanying this letter are the construction plans for the Primrose School Project. The proposed building connects to a sanitary sewer manhole designed by Walter P. Moore in the plan set titled "Tower Point Infrastructure Plans for Phase 12, Lots 1-3, Block 2" and the associated Sewer Report. The sanitary sewer system that the Primrose School Project connects to was designed to handle full build out of Lot 1. The use for Lot I is within the assumptions of the "Tower Point Infrastructure Plans for Phase 12, Lots 1-3, Block 2" plans and the associated Sewer Report. As a result, a separate sanitary sewer report is not being submitted with this project. If you have questions regarding the sanitary sewer system in either phase, please feel free to contact me at your convenience. Sincerely, Joe chultz, P.E. Civil Engineer OF U F-12327 SCHULTZ ENGINEERING, LLC. P.O. Box 11995 • College Station, Texas 77842 schultzengi neering lic.com