HomeMy WebLinkAboutApplication (12-71)(*OF""
CITY OF COLLEGE STATION
Home ofT,.vmA6,hf Unionxity'
SITE PLAN APPLICATION
FOR
CASE NO.:
DATE SUBM
TIME:
_- d �,j,� VIIV ON�jININIMUM SUBMITTAL REQUIREMENTS:
❑ $93 1te Plan Application Fee.
$350 Non -Residential Architectural Standards Building Review Application Fee (if applicable).
$600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is
1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is
due prior to the issuance of any plans or development permit).
❑ Application completed in full. This application form provided by the City of College Station must be used
and may not be adjusted or altered.
❑ Fourteen (14) folded copies of site plan.
One (1) folded copy of the landscape plan.
. One (1) copy of the following for Non -Residential Architectural Standards building review or Northgate
Building Review (if applicable).
❑ Building elevations to scale for all buildings.
❑ A list of building materials for all facade and screening.
❑ Color samples for all buildings or list colors to be used from the approved color palette.
ap ❑ Electronic copy of Site Plan e-mailed to csuelectdesign@cstx.gov.
ry tzp Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the
proposed request (if applicable).
The attached Site Plan Non -Residential Architectural Standards Building Review and Northgate Building
Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not
check off.
Date of Optional Preapplication or Stormwater Management Conference
NAME OF PROJECT ("0/J4"UC77oA) 5aVICES TEMI°oo?A-A`' 130ILD/AI C4
ADDRESS 93/o4 rOCV ?aAi21E {LoAg>
LEGAL DESCRIPTION (Lot, Block, Subdivision)
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project):
Name JoA1 14A I L. E-mail 161'cc, s d, 0"
Street Address 1?i17 WELSH
City CO LLC61F -aTMR®�J State rx Zip Code 7?240
Phone Number ' 171j - 77-7 --7 4q % Fax Number :al71 (094 - '5&a I Z
PROPERTY OWNER'S INFORMATION:
Name
Street Address `jAME /fS M,:WC_
City
Phone Number
State
E-mail
Fax Number
Zip Code
1/11 Page 1 of 11
ARCHITECT OR ENGINEER'S INFORMATION:
Name
Street Address -eZo C & jZ Aj wkj i L/t-z,4 IP200
City azw5ab1) State -TiC f W-CL Zip Code %°%046
Phone Number (832) 654-3%'Z Fe-PJ�beer %13 S°4"15-5/762-
OTHER CONTACTS (Please specify type of contact):
Name IV/
Street Address
City
Phone Number
Current zoning _
State
Fax Number
Present use of property T WA%J5 Py9 A-T7y1J CW TEL
Proposed use of property
Number of parking spaces required
E-mail
Zip Code
Number of parking spaces proposed
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? j— Yes rl No
This information is necessary to help staff identify the appropriate standards to review the application and will be used t
help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made,
vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law.
Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the
application be reviewed under previous ordinance as applicable?
F_, Yes
F_ No
yes, provide information regarding the first approved application and any related subsequent applications (provide
Iditional sheets if necessary):
Project Name:
City Project Number (in known):
Date / Timeframe when submitted:
1/11 Page 2 of 11
TI-FAMILY RESIDENTIAL AJ ARKLAND DEDICATION
O Ir('Fees due prior to the issuance of a Building Permit)
Total Acreage
Floodplain Acreage
Housing Units
# of 1 Bedroom Units
# of 2 Bedroom Units
# of Multi -Family Dwelling Units
X$1646=$
# of acres in floodplain
# of acres in detention
# of acres in greenways
# of 3 Bedroom Units
Date dedication approved by Parks &
# of 4 Bedroom Units Recreation Advisory Board
FOR 2 BEDROOM UNITS ONLY
# Bedrooms = 132 sq. ft.
# Bedrooms < 132 sq. ft.
COMMERCIAL
Total Acreage
Building Square Feet
Floodplain Acreage
Projects that were vested prior to January 1, 2008, per Chapter 245 of the Texas Local Government
Code may be assessed a different amount. Please contact city staff for additional information.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true
and correct.
Lam. 3.29.17,
ig ature and title Date
DIR�To�t, CONSTRUCVat.! 6F2VICE
Ce7
1/11 Page 3 of 11
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued.
2. The permit may be revoked if any false statements are made herein.
3. If revoked, all work must cease until permit is re -issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP.
7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post construction.
8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply.
11. The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
12. Release of plans to (name or firm) is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE.
Property Owner(s) Date
Engineer Certification:
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may
require a sedimentation basin.
3. The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations.
4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS
FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE.
Engineer Date
1/11 Page 4 of 11