Loading...
HomeMy WebLinkAboutCity Infrastructure Inspection NoticeDate To: From RE: Location: CITY INFRASTRUCTURE INSPECTION NOTICE 11/26/12 Alan Gibbs Mandi Alford The Barracks II Subdivision, Phase 101 DP 12-180 300 beacon Drive West ® Public Water Lines/Fire Hydrants ® Public Sanitary Sewer ® Public Storm Sewer ® Public Streets ❑ Public Detention Facility ❑ Driveway Connection to Public Street ❑ Private Construction within easement ❑ No Inspection Required Comments: Wellborn SUB for Water ® Engineer's Estimates Attached ® Construction Plans Attached ❑ Site Plan Attached CITY INFRASTRUCTURE INSPECTION NOTICE Date: 11/26/12 To: Diane Broadhurst From: Mandi Alford RE: The Barracks II Subdivision, Phase 101 DP 12-180 Location: 300 Deacon Drive West ® Public Water Lines/Fire Hydrants ® Public Sanitary Sewer ® Public Storm Sewer ® Public Streets ® Engineer's Estimates Attached ❑ Public Detention Facility ® Construction Plans Attached ❑ Driveway Connection to Public Street ❑ Site Plan Attached ❑ Private Construction within easement ❑ ❑ No Inspection Required Comments: Wellborn SUD for Water