HomeMy WebLinkAboutCity Infrastructure Inspection NoticeDate
To:
From
RE:
Location:
CITY INFRASTRUCTURE
INSPECTION NOTICE
11/26/12
Alan Gibbs
Mandi Alford
The Barracks II Subdivision, Phase 101
DP 12-180
300 beacon Drive West
® Public Water Lines/Fire Hydrants
® Public Sanitary Sewer
® Public Storm Sewer
® Public Streets
❑ Public Detention Facility
❑ Driveway Connection to Public Street
❑ Private Construction within easement
❑ No Inspection Required
Comments:
Wellborn SUB for Water
® Engineer's Estimates Attached
® Construction Plans Attached
❑ Site Plan Attached
CITY INFRASTRUCTURE
INSPECTION NOTICE
Date: 11/26/12
To: Diane Broadhurst
From: Mandi Alford
RE: The Barracks II Subdivision, Phase 101
DP 12-180
Location: 300 Deacon Drive West
®
Public Water Lines/Fire Hydrants
®
Public Sanitary Sewer
®
Public Storm Sewer
®
Public Streets
® Engineer's Estimates Attached
❑
Public Detention Facility
® Construction Plans Attached
❑
Driveway Connection to Public Street
❑ Site Plan Attached
❑
Private Construction within easement
❑
❑ No Inspection Required
Comments:
Wellborn SUD for Water