Loading...
HomeMy WebLinkAboutAs-Built Drainage LetterMcC:;L URE & BRO WNE, I?,NC,INI':ERINC/S(IRVFN'1NC:, INC. 1006 Woodereek Dr., Suite 103 Callege Station, Tz 7V845 (979) 693.3838 Engineer Reg. No, P-458 1314 10th Street, Suite 210 - HUNsvi lo. Tx. 77320 (936) 2949749 Survey Reg, No. 101033-00 October 30, 2013 Mrs. Danielle Singh, PE Asst. Engineer City of College Station Post Office Box 9960 College Station, TX 77842 Re.: As -Built Drainage Letter Carter's Crossing, Phase 2 MBESI No. 1015-0007 Dear Mrs. Singh: The purpose of this letter is to provide information to you in regards of the drainage facilities in Carter's Crossing Phase 2 based on as built conditions. We ran the hydraulic model of the subdivision with the as built elevations to determine how the box culvert under Appomattox Drive and the pipe culvert under the sidewalk would perform. The results are as shown below: Appomattox Drive Culvert 100 Year W.S.E. = 255.76 Top of Road = 256.34 36" Pipe Culvert 100 Year W.S.E.= 254.08 Elevation of Park Boundary = 255.10 The stormwater will remain within the creek without going over Appomattox Drive at the culvert location. Additionally, the 100 year storm is contained within the park boundary and will not encroach onto the lots. If you have any questions, please do not hesitate to contact me. Sincerely,) 4RoG•l Je bertso� u