Loading...
HomeMy WebLinkAboutCost EstimateCarter's Crossing Park MBESI PROJ #: 1015-0005 Engineer's Estimate of Construction Costs September 24, 2012 Item # I Description I Unit I Quantity I Unit Price I Total 2 36" HIRE Pipe, (ADS, N-12 or approved equal w/water- L.F. 10 $75.00 $750.00 ti t'oints 3 36" 4:1 Sloped Headwall I EACH 1 2 $1,200.00 $2,400.00 4 Rock Rip -Rap S.Y. 1 40 $30.00 $1,200.00 Drainage System Subtotal $4,350 Erosion Control Construction Erosion Control Plan & Sedimentation Control (per Item 5 106) (includes silt fencing, construction exits, straw bale L.S. 1 $1,000.00 $1,000.00 barriers,. inlet protection, grass seeding, and any other sedimentation control devices Erosion Control Subtotal 1 $1,000 SubTotal Construction Cost 1 $20,934 The above construction estimate is based on the engineer's preliminary opinion of probable construction costs. This estimate constitutesour best judgment at this time. Please note that the engineer does not have any control over contractor or supplier workloads and the degree to which inflation may affect project costs between now and the bid date. During construction, additional features may become apparent as the work progresses, which will result in an increase in cost. 4 -31415 Jeffer obertson, P.E. Date .. . EFFERY L. ROBERTSO', .............................. — .� 94745 tlolt S /0P11 I of 2