HomeMy WebLinkAboutCost EstimateCarter's Crossing Park
MBESI PROJ #: 1015-0005
Engineer's Estimate of Construction Costs
September 24, 2012
Item # I Description I Unit I Quantity I Unit Price I Total
2
36" HIRE Pipe, (ADS, N-12 or approved equal w/water-
L.F.
10
$75.00
$750.00
ti t'oints
3
36" 4:1 Sloped Headwall
I EACH
1 2
$1,200.00
$2,400.00
4
Rock Rip -Rap
S.Y.
1 40
$30.00
$1,200.00
Drainage System Subtotal
$4,350
Erosion Control Construction
Erosion Control Plan & Sedimentation Control (per Item
5
106) (includes silt fencing, construction exits, straw bale
L.S.
1
$1,000.00
$1,000.00
barriers,. inlet protection, grass seeding, and any other
sedimentation control devices
Erosion Control Subtotal 1 $1,000
SubTotal Construction Cost 1 $20,934
The above construction estimate is based on the engineer's preliminary opinion of probable construction costs.
This estimate constitutesour best judgment at this time. Please note that the engineer does not have any control
over contractor or supplier workloads and the degree to which inflation may affect project costs between now and
the bid date. During construction, additional features may become apparent as the work progresses, which will
result in an increase in cost.
4 -31415
Jeffer obertson, P.E. Date
.. .
EFFERY L. ROBERTSO',
.............................. — .�
94745
tlolt S /0P11
I of 2