Loading...
HomeMy WebLinkAboutStaff Comments(*�� CITY OF COLLEGE STATION Ho. ofTz A4M UW.v iry' MEMORANDUM January 24, 2013 TO: Steve Arden, via: stevea@bcrbcs.com FROM: Jason Schubert, AICP Principal Planner SUBJECT: CARTERS CROSSING PARK (SP) Thank you for the submittal of your SITE PLAN application. This project will be distributed to staff next week for their review. cc: McClure & Browne, via: jeffr@mcclurebrowne.com Case file no. 13-00900015 Plaeeixg&Deoebpm S.. P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77942 TEL. 979.764.3570 • FAX. 979.764.3496 csa.gmidevservices (* F4" CITY OF COLLEGE STATION Homr ofT AdM U.ro ,,- MEMORANDUM January 24, 2013 TO: FROM: Jason Schubert, AICP Principal Planner SUBJECT: CARTERS CROSSING PARK (SP) Thank you for the submittal of your SITE PLAN application. This project will be distributed to staff next week for their review. cc: Case file no. 13-00900015 Pkxxixg &Deve%pmmt Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77942 TEL. 979.764.3570 • FAX. 979.764.3496 atK.gov/Aevservices (*/" CITY OF COLLEGE STATION Horn ofT. A4M UahsNry' 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM February 5, 2013 TO: FROM: Teresa Rogers, Staff Planner SUBJECT: Carters Crossing Park (SP) Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter, Memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment), Seven (7) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set), Two (2) revised site plans, One (1) landscaping plan, One (1) 11x17 grading and erosion control plan, _ Easement Dedication Sheet and required documents (please note that the Site Plan will not be stamped approved until the Blanket Easement, or all other appropriate easements, have been dedicated to the City of College Station). OR Four (4) revised site and one (1) landscaping plan, $ Parkland Dedication fees prior to issuance of a building permit, _ Easement Dedication Sheet and required documents (please note that the Site Plan will not be stamped approved until the Blanket Easement, or all other appropriate easements, have been dedicated to the City of College Station). Plaeeixg&D.4.pm S.v P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77842 TEL. 979.764.3570 • FAX. 979.764.3496 csa.gov/Aevsenrices Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact Teresa Rogers at 979.764.3570. Attachments: Staff review comments PC: Case file no. 13-00900015 STAFF REVIEW COMMENTS NO. 1 Project: Carters Crossing Park (SP) — 13-00900015 PLANNING 1. Label the ownership and zoning for abutting parcels. 2. Define the boundary of the park and show the entire park property on the Site Plan. 3. All proposed structures that will be located in the park must be depicted on the site plan. In addition, the structures (except for playground equipment) would need to conform to Non - Residential Architectural (NRA) Standards, which can be found in the Unified Development Ordinance (UDO), Section 7.10. An NRA application will need to be submitted for any proposed structures in the park. 4. Depict, label, and provide the volume and page number for all easements (100-foot Gulf States Utility Easement, 60-foot Exxon Easement, 50-foot CoCS Electrical Easement) 5. Remove General Construction Note #7, as there is no parking proposed on this site. 6. Remove sign details from the construction documents. The details will not be necessary as part of the construction documents because the sign will need to be moved out of the PUE. The sign will be permitted separately and a Sign Permit Application must be submitted to Planning and Development Services for review. 7. Please note that the park sign will be required to meet standards for a Low Profile sign described in LIDO Section 7.5. It appears the sign is located to close to the right-of-way (ROW). A minimum 10-foot setback is required from the ROW. 8. Provide a general note on the site plan that states the following: Exterior building and site lighting will meet the standards of Section 7.11 of the Unified Development Ordinance. The light source shall not project below an opaque housing and no fixture shall directly project light horizontally. Fixtures will be mounted in such a manner that the projected cone of light does not cross any property line. 9. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Teresa Rogers Date: February 5, 2013 LANDSCAPING/STREETSCAPING/BUFFER 1. The park property must comply with LIDO Section 7.6, Landscaping and Tree Protection requirements. Please note that existing trees may be counted towards landscaping point totals and higher point values are awarded for barricaded trees. Any existing trees that are counted for landscape points will need to be shown on the landscape plan along with a barricade plan. 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. Reviewed by: Teresa Rogers Date: February 5, 2013 Page 3 of 3 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: February 1, 2013 ENGINEERING COMMENTS NO. 1 1. Since the park land has already been dedicated, a performance bond and a payment bond are required before the site plan can be approved. 2. Please provide an engineer's estimate. 3. Please provide a certification acknowledging that these plans are designed according to City Standards. 4. Please show all easements. 5. Please clearly designate which sidewalk is proposed with this plan and that which is existing or being constructed with other plans. 6. Please make sure to show all improvements on the site plan (signs, wall, etc). 7. Please include the Standard Drainage details with the construction plans on your next submittal. 8. An additional portion of sidewalk is shown on the site plan that is not shown on the construction plans. If the additional portion is proposed what is the shaded area in the middle of the sidewalk loop? 9. The maximum slope for publicly maintained areas is 4:1. It looks like some areas to be graded may exceed this. 10. There is a note on the construction plans stating that the Park is to be dedicated. The park has already been dedicated. 11. The sign/wall should not be located over the waterline or other utilities. Please move this feature out of the PUE. 12. Please clearly label the features. For instance, the 38" HDPE is also labeled as SD-6 in the profile view, but is not labeled at all in the plan view. Reviewed by: Danielle Singh Date: 2/4/13 GREENWAYS 1. Please provide a dead end sign for the sidewalk heading towards the Gulf States Utility easement 2. Also please end the above mentioned sidewalk as a loop or bulb where it terminates. Reviewed by: Venessa Garza, Greenways Program Manager Date: February 5, 2013 AH CITY OF COLLEGE STATION Home of Texas A&M University" MEMORANDUM January 24, 2013 TO: Steve Arden; via: stevea@bcrbcs.com FROM: Jason Schubert, AICP Principal Planner SUBJECT: CARTERS CROSSING PARK (SP) Thank you for the submittal of your SITE PLAN application. This project will be distributed to staff next week for their review. cc: McClure & Browne; via: jeffr@mcclurebrowne.com / Case file no. 13-00900015 Planning d Development Services P.O. BOX 9960 • I IfH "FEXAS AVENUF. • COLLEGES IN] [ON -I FXAU • 7,7342 "ITT. 979.764.35 70 • FAX. 979.764. i49G csbc.gov/devservices �OSSING PARK ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: ehorton(cDcstx.gov. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 9. To discuss any of the above electrical comments please contact Eric Horton at 979.764.6280. Reviewed by: Eric Horton Date:1/30/13 n m CITY OF COLLF.GR STATION --- Home of Texas AdM University` MEMORANDUM February 5, 2013 TO: Steve Arden; via: stevea@bcrbcs.com FROM: Teresa Rogers, Staff Planner SUBJECT: Carters Crossing Park (SP) Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter; Memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Four (4) revised site and one (1) landscaping plan; One (1) landscaping plan; Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact Teresa Rogers at 979.764.3570. Attachments: Staff review comments PC: Jeff Robertson, McClure & Browne; via: jeffr@mcclurebrowne.com Case file no. 13-00900015 Plztuning ter Development Services . P.O. BOX 9960 - 11M TEXAS AVENUE • COLLEGL'•. S IAHON • "ITXAS • 77543 'I'F:L. 979.764.3570 • PAX. 979.764.31M csbt.gov/devservices STAFF REVIEW COMMENTS NO. 1 Project: Carters Crossing Park (SP) — 13-00900015 PLANNING 1. Label the ownership and zoning for abutting parcels. 2. Define the boundary of the park and show the entire park property on the Site Plan. 3. All proposed structures that will be located in the park must be depicted on the site plan. In addition, the structures (except for playground equipment) would need to conform to Non - Residential Architectural (NRA) Standards, which can be found in the Unified Development Ordinance (UDO), Section 7.10. An NRA application will need to be submitted for any proposed -structures in the park. 4. Depict, label, and provide the volume and page number for all easements (100-foot Gulf States Utility Easement, 60-foot Exxon Easement, 50-foot CoCS Electrical Easement) 5. Remove General Construction Note #7, as there is no parking proposed on this site. 6. Remove sign details from the construction documents. The details will not be necessary as part of the construction documents because the sign will need to be moved out of the PUE. The sign will be permitted separately and a Sign Permit Application must be submitted to Planning and Development Services for review. 7. Please note that the park sign will be required to meet standards for a Low Profile sign described in LIDO Section 7.5. It appears the sign is located to close to the right-of-way (ROW). A minimum 10-foot setback is required from the ROW. 8. Provide a general note on the site plan that states the following: Exterior building and site lighting will meet the standards of Section 7.11 of the Unified Development Ordinance. The light source shall not project below an opaque housing and no fixture shall directly project light horizontally. Fixtures will be mounted in such a manner that the projected cone of light does not cross any property line. 9. Please note that any changes made to the plans, that have not been requested by the City of College -Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Teresa Rogers Date: February 5, 2013 LANDSCAPING/STREETSCAPING/BUFFER 1. The park property must comply with LIDO Section 7.6, Landscaping and Tree Protection requirements. Please note that existing trees may be counted towards landscaping point totals and higher point values are awarded for barricaded trees. Any existing trees that are counted for landscape points will need to be shown on the landscape plan along with a barricade plan. 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. Reviewed by: Teresa Rogers Date: February 5, 2013 Page 2 of 4 ENGINEERING COMMENTS NO. 1 1. Since the -park land has already been dedicated, a performance bond and a payment bond are required before the site plan can be approved. 2. Please provide an engineer's estimate. 3. Please provide a certification acknowledging that these plans are designed according to City Standards. 4. Please show all easements. 5. Please clearly designate which sidewalk is proposed with this plan and that which is existing or being constructed with other plans. 6. Please make sure to show all improvements on the site plan (signs, wall, etc). 7. Please include the Standard Drainage details with the construction plans on your next submittal. 8. An additional portion of sidewalk is shown on the site plan that is not shown on the construction plans. If the additional portion is proposed what is the shaded area in the middle of the sidewalk loop? 9. The maximum slope for publicly maintained areas is 4:1. It looks like some areas to be graded may exceed this. 10. There is a note on the construction plans stating that the Park is to be dedicated. The park has already been dedicated. 11. The sign/wall should not be located over the waterline or other utilities. Please move this feature out of the PUE. 12. Please clearly label the features. For instance, the 38" HDPE is also labeled as SD-6 in the profile view, but is not labeled at all in the plan view. Reviewed by: Danielle Singh GREENWAYS Date: February 5, 2013 1. Please provide a dead end sign for the sidewalk heading towards the Gulf States Utility easement 2. Also please end the above mentioned sidewalk as a loop or bulb where it terminates. Reviewed by: Venessa Garza, Greenways Program Manager Date: February 5, 2013 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: ehorton(aa)cstx.gov. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. --- - - Page 3 of 4 7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 9. To discuss any of the above electrical comments please contact Eric Horton at 979.764.6280. Reviewed by: Eric Horton SANITATION - 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: January 30, 2013 Date: February 1, 2013 Page 4 of 4 (*OF"" CITY OF COLLEGE STATION Home ofTewAcW University' MEMORANDUM February 5, 2013 TO: Steve Arden; via: stevea@bcrbcs.com FROM: Teresa Rogers, Staff Planner SUBJECT: Carters Crossing Park (SP) Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter; Memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Four (4) revised site and one (1) landscaping plan; One (1) landscaping plan; Please note that this application applicant has not provided wri Administrator that seek to addre: comments that you are not ad( explaining the details. If you have Teresa Rogers at 979.764.3570. will expire in 90 days from the date of this memo, if the :en response comments and revised documents to the s the staff review comments contained herein. If there are ressing with the revised site plan, please attach a letter any questions or need additional information, please contact Attachments: Staff review comments PC: Jeff Robertson, McClure & Browne; via: jeffr@mcclurebrowne.com Case file no. 13-00900015 Planning err Development Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS - 77842 TEL. 979.764.3570 • FAX. 979.764.3496 cstx.gov/devservices STAFF REVIEW COMMENTS NO. 1 Project: Carters Crossing Park (SP)—13-00900015 PLANNING ,,/1. Label the ownership and zoning for abutting parcels. See revised site plan. �2 Define the boundary of the park and show the entire park property on the Site Plan. See d revised site plan. J3. All proposed structures that will be located in the park must be depicted on the site plan. In addition, the structures (except for playground equipment) would need to conform to Non - Residential Architectural (NRA) Standards, which can be found in the Unified Development Ordinance (UDO), Section 7.10. An NRA application will need to be submitted for,any proposed structures in the park. See revised site plan. —npa pi�afa of mot W & Q J4. Depict, label, and provide the volume and page number for al easements (1 0-foot Gulf States Utility Easement, 60-foot Exxon Easement, 50-foot CoCS Electrical Easement) See revised site plan. f5. Remove General Construction Note #7, as there is no parking proposed on this site. See revised site plan. J6. Remove sign details from the construction documents. The details will not be necessary as part of the construction documents because the sign will need to be moved out of the PUE. The sign will be permitted separately and a Sign Permit Application must be submitted to Planning and Development Services for review. Duly noted. 7O Please note that the park sign will be required to meet standards for a Low Profile sign described in UDO Section 7.5. It appears the sign is located to close to the right-of-way (ROW). A minimum 10-foot setback is required from the ROW. Duly noted.— Ok Wllf1 C470& er t/8. Provide a general note on the site plan that states the following: Exterior building and site COD I lighting will meet the standards of Section 7.11 of the Unified Development Ordinance. The light source shall not project below an opaque housing and no fixture shall directly project light horizontally. Fixtures will be mounted in such a manner that the projected cone of light does not cross any property line. See revised site plan. V/J. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Teresa Rogers Date: February 5, 2013 LANDSCAPING/STREETSCAPING/BUFFER f1. The park property must comply with UDO Section 7.6, Landscaping and Tree Protection requirements. Please note that existing trees may be counted towards landscaping point totals and higher point values are awarded for barricaded trees. Any existing trees that are counted for landscape points will need to be shown on the landscape plan along with a barricade plan. See revised site plan. The landscaping plan has been combined with it. 2. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced v Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. Duly noted. Reviewed by: Teresa Rogers Date: February 5, 2013 Page 2 of 4 ENGINEERING COMMENTS NO. 1 1. Since the park land has already been dedicated, a performance bond and a payment bond are required before the site plan can be approved. It is my understanding that the developer is working with the City on this issue. 2. Please provide an engineer's estimate. See attached. 3. Please provide a certification acknowledging that these plans are designed according to City Standards. See attached. 4. Please show all easements. See revised site plan. 5. Please clearly designate which sidewalk is proposed with this plan and that which is existing or being constructed with other plans. See revised site plan. 6. Please make sure to show all improvements on the site plan (signs, wall, etc). See revised site plan. 7. Please include the Standard Drainage details with the construction plans on your next submittal. Duly noted. 8. An additional portion of sidewalk is shown on the site plan that is not shown on the construction plans. If the additional portion is proposed what is the shaded area in the middle of the sidewalk loop? See revised site plan. The portion of sidewalk has been removed. 9. The maximum slope for publicly maintained areas is 4:1. It looks like some areas to be graded may exceed this. All slopes will be 4:1. What area appears steeper? 10. There is a note on the construction plans stating that the Park is to be dedicated. The park has already been dedicated. See revised plan. 11. The sign/wall should not be located over the waterline or other utilities. Please move this feature out of the PUE. This issue has been addressed with the City staff. The sign has been moved back away from the water line. 12. Please clearly label the features. For instance, the 38" HDPE is also labeled as SD-6 in the profile view, but is not labeled at all in the plan view. See revised plan. Reviewed by: Danielle Singh Date: February 5, 2013 GREENWAYS 1. Please provide a dead end sign for the sidewalk heading towards the Gulf States Utility easement See revised plan. 2. Also please end the above mentioned sidewalk as a loop or bulb where it terminates. See revised plan. Reviewed by: Vanessa Garza, Greenways Program Manager Date: February 5, 2013 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: ehorton(a)cstx.gov. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. Page 3 of 4 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 9. To discuss any of the above electrical comments please contact Eric Horton at 979.764.6280. Reviewed by: Eric Horton Date: January 30, 2013 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: February 1, 2013 Page 4 of 4 _I (* hK4�� CITY OF COU..L GEl STATION Home of Texm AdM Univenity' luIto 3to] M10IDili jI April 1, 2013 / TO: Steve Arden; via: stevea@bcrbcs.comV FROM: Teresa Rogers, Staff Planner SUBJECT: Carter's Crossing Park - Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter Five (5) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) One (1) revised site plans One (1) landscaping plan One (1) 24x36 grading and erosion control plan Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Jeff Robertson, McClure & Browne; via: jeffr@mcclurebrowne.coo Case file no. 13-00900015 Planning d DevelopmentSerWees P.O. BOX 9960 • 1101 TEXAS AVENUE • C:OLLEGE STATION • TEXAS • 77842 TCI..')79.7(i4.3570 • FAX. 979.764.306 cstx.gov/devservices STAFF REVIEW COMMENTS NO. 2 Project: Carter's Crossing Park (SP) - 13-00900015 PLANNING 1. The revised landscape calculations shown on the site plan meet requirements, however the plants depicted on "Sheet 4 of 5" on the landscape plan and the numbers provided in the landscape legend do not match the site plan provided by McClure and Browne. Please revise "Sheet 4 of 5". 2. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Teresa Rogers Date: April 1, 2013 ENGINEERING COMMENTS NO. 2 1. Please provide surety (letter of credit, check, or performance bond) in the amount of $20,934. If this is provided in the form of a check, please make sure to include a letter stating what the check is for. 2. Please provide an insurance certificate/endorsement showing the City as an additional insured. Reviewed by: Danielle Singh Date: March 27, 2013 (* or q" CITY OF COLLEGE STATION Home ofT. Ae4M U hlv D' MEMORANDUM February 5, 2013 TO: Steve Arden, via: stevea@bcrbcs.com FROM: Teresa Rogers, Staff Planner SUBJECT: Carters Crossing Park (SP) Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter, Memo providing written responses to all of staffs comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment), Four (4) revised site and one (1) landscaping plan, One (1) landscaping plan, Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact Teresa Rogers at 979.764.3570. Attachments: Staff review comments PC: Jeff Robertson, McClure & Browne, via: jeffr@mcclurebrowne.com Case file no. 13-00900015 Planning &Development Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77942 TEL. 979.764.3570 • FAX. 979.764.3496 csa.govidevservices STAFF REVIEW COMMENTS NO. 1 Project: Carters Crossing Park (SP) — 13-00900015 PLANNING 1. Label the ownership and zoning for abutting parcels. 2. Define the boundary of the park and show the entire park property on the Site Plan. 3. All proposed structures that will be located in the park must be depicted on the site plan. In addition, the structures (except for playground equipment) would need to conform to Non - Residential Architectural (NRA) Standards, which can be found in the Unified Development Ordinance (UDO), Section 7.10. An NRA application will need to be submitted for any proposed structures in the park. 4. Depict, label, and provide the volume and page number for all easements (100-foot Gulf States Utility Easement, 60-foot Exxon Easement, 50-foot CoCS Electrical Easement) 5. Remove General Construction Note #7, as there is no parking proposed on this site. 6. Remove sign details from the construction documents. The details will not be necessary as part of the construction documents because the sign will need to be moved out of the PUE. The sign will be permitted separately and a Sign Permit Application must be submitted to Planning and Development Services for review. 7. Please note that the park sign will be required to meet standards for a Low Profile sign described in LIDO Section 7.5. It appears the sign is located to close to the right-of-way (ROW). A minimum 10-foot setback is required from the ROW. 8. Provide a general note on the site plan that states the following: Exterior building and site lighting will meet the standards of Section 7.11 of the Unified Development Ordinance. The light source shall not project below an opaque housing and no fixture shall directly project light horizontally. Fixtures will be mounted in such a manner that the projected cone of light does not cross any property line. 9. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Teresa Rogers Date: February 5, 2013 LANDSCAPING/STREETSCAPING/BUFFER 1. The park property must comply with LIDO Section 7.6, Landscaping and Tree Protection requirements. Please note that existing trees may be counted towards landscaping point totals and higher point values are awarded for barricaded trees. Any existing trees that are counted for landscape points will need to be shown on the landscape plan along with a barricade plan. 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. Reviewed by: Teresa Rogers Date: February 5, 2013 Page 2 of 4 ENGINEERING COMMENTS NO. 1 Since the park land has already been dedicated, a performance bond and a payment bond are required before the site plan can be approved. Please provide an engineer's estimate. Please provide a certification acknowledging that these plans are designed according to City Standards. 4. Please show all easements. 5. Please clearly designate which sidewalk is proposed with this plan and that which is existing or being constructed with other plans. 6. Please make sure to show all improvements on the site plan (signs, wall, etc). 7. Please include the Standard Drainage details with the construction plans on your next submittal. 8. An additional portion of sidewalk is shown on the site plan that is not shown on the construction plans. If the additional portion is proposed what is the shaded area in the middle of the sidewalk loop? 9. The maximum slope for publicly maintained areas is 4:1. It looks like some areas to be graded may exceed this. 10. There is a note on the construction plans stating that the Park is to be dedicated. The park has already been dedicated. 11. The sign/wall should not be located over the waterline or other utilities. Please move this feature out of the PUE. 12. Please clearly label the features. For instance, the 38" HDPE is also labeled as SD-6 in the profile view, but is not labeled at all in the plan view. Reviewed by: Danielle Singh Date: February 5, 2013 GREENWAYS 1. Please provide a dead end sign for the sidewalk heading towards the Gulf States Utility easement 2. Also please end the above mentioned sidewalk as a loop or bulb where it terminates. Reviewed by: Venessa Garza, Greenways Program Manager Date: February 5, 2013 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: ehorton(cDcstx.gov. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. Page 3 of 4 7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 9. To discuss any of the above electrical comments please contact Eric Horton at 979.764.6280. Reviewed by: Eric Horton SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: January 30, 2013 Date: February 1, 2013 Page 4 of 4 ENGINEERING COMMENTS NO. 2 1. Please provide surety (letter of credit, check, or performance bond) in the amount of $20,934. If this is provided in the form of a check, please make sure to include a letter stating what the check is for. 2. Please provide an insurance certificate/endorsement showing the City as an additional insured. Reviewed by: Danielle Singh Date: 3/27/13 (*/" CITY OF COLLEGE STATION Horn ofT. A&M UahsNry' 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM April 1, 2013 TO: Steve Arden, via: stevea@bcrbcs.com FROM: Teresa Rogers, Staff Planner SUBJECT: Carter's Crossing Park - Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter _ Five (5) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) One (1) revised site plans One (1) landscaping plan One (1) 24x36 grading and erosion control plan Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Jeff Robertson, McClure & Browne, via: jeffr@mcclurebrowne.com Case file no. 13-00900015 P/aeeixg&D.4.pm Snv . P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77842 TEL. 979.764.3570 • FAX. 979.764.3496 atcgov/Aevsenrices STAFF REVIEW COMMENTS NO. 2 Project: Carter's Crossing Park (SP) - 13-00900015 PLANNING 1. The revised landscape calculations shown on the site plan meet requirements, however the plants depicted on "Sheet 4 of 5" on the landscape plan and the numbers provided in the landscape legend do not match the site plan provided by McClure and Browne. Please revise "Sheet 4 of 5". 2. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Teresa Rogers Date: April 1, 2013 Page 2 of 2 (* F"" CITY OF COLLEGE STATION Xvme vfTrxaAdM Univrrnty MEMORANDUM April 1, 2013 TO: Steve Arden, via: stevea@bcrbcs.com FROM: Teresa Rogers, Staff Planner SUBJECT: Carter's Crossing Park -Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter Five (5) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) One (1) revised site plans One (1) landscaping plan One (1) 24x36 grading and erosion control plan Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Jeff Robertson, McClure & Browne, via: jeffr@mcclurebrowne.com Case file no. 13-00900015 Planning &Devehpmmt Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77942 TEL. 979.764.3570 • FAX. 979.764.3496 a tc.govidevservims STAFF REVIEW COMMENTS NO.2 Project: Carter's Crossing Park (SP) - 13-00900015 PLANNING 1. The revised landscape calculations shown on the site plan meet requirements, however the plants depicted on "Sheet 4 of 5" on the landscape plan and the numbers provided in the landscape legend do not match the site plan provided by McClure and Browne. Please revise "Sheet 4 of 5". 2. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Teresa Rogers Date: April 1, 2013 ENGINEERING COMMENTS NO. 2 1. Please provide surety (letter of credit, check, or performance bond) in the amount of $20,934. If this is provided in the form of a check, please make sure to include a letter stating what the check is for. 2. Please provide an insurance certificate/endorsement showing the City as an additional insured. Reviewed by: Danielle Singh Date: March 27, 2013