Loading...
HomeMy WebLinkAboutCost EstimateSCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No.12327 NAPA FLATS PUBLIC WATERLINE WATERLINE ENGINEER'S ESTIMATE OF CONSTRUCTION Item I Description I Unit I Estimated r Unit Price Total General Items t Mobilization, Overhead and Site Preparation LS l $ 500.00 $500 2 Site Cleanup, replacement of landscaping and grass sod LS 1 $ 500.00 $750 General Items Subtotal $1,250 Water Construction Items Phase I 3 Connect to Existing Waterline with 12"x6" M.J. Tapping Sleeve and Valve, complete in place BA I $ 4,500.00 $4,500 4 6" C900 Water Pipe w/tracer wire - Structural BackFlll, complete in place LF 5 $ 30.00 $150 5 6" x 45' M.J.:Bend, complete in place EA 2 $ 300.00 $600 6 6" M.J. Gate Valve w/ lockable lid, complete in place LS 1 $ 850.00 $850 Water Construction Items Subtotal $6,100 General Items Subtotal $1,250 Water Construction Items Subtotal $6,100 TOTAL CONSTRUCTION $7,350 -4 "�3" 2 s�13 F-12327, SCHULTZ, ENGINEERING. I.I.C.