Loading...
HomeMy WebLinkAboutApplication (12-143)(*Or"" CITY OP COLLEGE STATION Home ofTexm A6111 University' V) SITE PLAN APPLICATION GENERAL FOR OFFICE USE ONLY CASE NO.: DATE SUBMITTr��p TIME: �, I X MINIMUM SUBMITTAL REQUIREMENTS: Fx $932 Site Plan Application Fee. $350 Non -Residential Architectural Standards Building Review Application Fee (if applicable). Fx� $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 1% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). F Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered. 0 Fourteen (14) folded copies of site plan. One (1) folded copy of the landscape plan. One (1) copy of the following for Non -Residential Architectural Standards building review or Northgate Building Review (if applicable). Ox Building elevations to scale for all buildings. ❑x A list of building materials for all facade and screening. ❑x Color samples for all buildings or list colors to be used from the approved color palette. F Electronic copy of Site Plan e-mailed to csuelectdesign@cstx.gov. ZX Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. Jl� Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). ,J(® Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the proposed request (if applicable). The attached Site Plan Non -Residential Architectural Standards Building Review and Northgate Building Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not check off. Date of Optional Preapplication or Stormwater Management Conference 5-9-12 NAME OF PROJECT Primrose School Project ADDRESS Arrington Road ltldI LEGAL DESCRIPTION (Lot, Block, Subdivision) Lot 1, Block 2 Tower Point Subdivision Phase 12 APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name Mark Pavey, AIA - Children's Design Group E-mail child.design@mindspring.com Street Address 1114 Eagles Creek Way City Acworth Phone Number 770-485-8496 PROPERTY OWNER'S INFORMATION: Name College Station Market Place Mike Coontz Street Address 520 Post Oak Blvd., Suite 850 City Houston Phone Number 713.623.0178 State GA Zip Code 30101 Fax Number 206-350-0593 E-mail mcoontz@weinerdevelopment.com State TX Fax Number Zip Code 77027 1/11 Page 1 of 11 ARCHITECT OR ENGINEER'S INFOKMATION: Name Joe Schultz, P.E. Street Address 2730 Longmire Drive, Suite A City College Station Phone Number 979-764-3900 State TX OTHER CONTACTS (Please specify type of contact): Name Jennifer M. Darlington - Children's Design Group Street Address 1114 Eagles Creek Way City Acworth Phone Number 404-993-4646 Current zoning Present use of property Vacant Proposed use of property Day Care Center E-mail joeschultz64@verizon.net Zip Code 77845 Fax Number 979-764-3910 State GA Fax Number E-mail Jennifer.childdesign@yahoo.co Zip Code 30101 Number of parking spaces required 48 Number of parking spaces proposed 48 Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? r Yes FX_ No information is necessary to help staff identify the appropriate standards to review the application and will be used t determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made, ng is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. this application a continuation of a project that has received prior City platting approval(s) and you are requesting the #ication be reviewed under previous ordinance as applicable? jX Yes F_ No If yes, provide information regarding the first approved application and any related subsequent applications (provide additional sheets if necessary): Project Name: Tower Point Preliminary Plat City Project Number (in known): 06-00500261 Date / Timeframe when submitted: 12-04-06 1/11 Page 2 of 11 CERTIFIG. (IONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re -issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP. 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre - pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11. The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12, Release of plans to (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. Property Owner(s) Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may require a sedimentation basin. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirement& it of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guideligsofi fev nt has been designed in accordance with all applicable codes and ordinances of the City of ge° a tioYYa ate and Federal Regulations. 4. I, THE ENGF E T� Q�CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE , 3 tl� PPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURAT jp°gEpH P. SGH P°o Hg ILr 9` -/0Y2_ Engineer Date 1111 Page 4 of 11 The following CERTIFk .`PIONS apply to development in SNdcial Flood Hazard Areas. Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only Permits:* A. 1, certify, as demonstrated in the attached drainage study, that the alterations or development covered by this permit, shall not: (i) increase the Base Flood elevation; (ii) create additional areas of Special Flood Hazard Area; (iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set forth in the City of College Station Code of Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor (v) increase Base Flood velocities. beyond those areas exempted by ordinance in Section 5.11.3a of Chapter 13 Code of Ordinances. Engineer Date Initial * If a platting -status exemption to this requirement is asserted, provide written justification under separate letter in lieu of certification. Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits: am certify to the following: (1) that any nonresidential or multi -family structure on or proposed to be on this site as part of this application is designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm. Engineer Date Additional certification for Floodway Encroachments: C. I, , certify that the construction, improvement, or fill covered by this permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments. Engineer Date IM Page 5 of 11 Required for all projects proptr Ong structures in Special Flood Hazaru Area (Elevation Certificate required). Residential Structures: D. I, , certify that all new construction or any substantial improvement of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -pour) and post construction. Engineer / Surveyor Commercial Structures: E. 1, Date certify that all new construction or any substantial improvement of any commercial, industrial, or other non-residential structure are designed to have the lowest floor, including all utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation Engineer/ Surveyor OR Date I, , certify that the structure with its attendant utility, ductwork, basement and sanitary facilities is designed to be flood -proofed so that the structure and utilities, ductwork, basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the hydrostatic and hydrodynamic conditions. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre - pour) and post construction. Engineer/ Surveyor Conditions or comments as part of approval: Date 1/11 Page 6 of 11 MULTI -FAMILY RESIDENTIAL Total Acreage Floodplain Acreage Housing Units # of 1 Bedroom Units # of 2 Bedroom Units # of 3 Bedroom Units # of 4 Bedroom Units FOR 2 BEDROOM UNITS ONLY # Bedrooms =132 sq. ft. # Bedrooms < 132 sq, ft. * Projects that were vested prior to January 1 Code may be assessed a different amount. The applicant has prepared this application and < and correct. <t Skin7 and title PARKLAND DEDICATION (Fees due prior to the issuance of a Building Permit) # of Multi -Family Dwelling Units X $1646 =$ # of acres in floodpfain # of acres in detention # of acres in greenways Date dedication approved by Parks & Recreation Advisory Board COMMERCIAL Total Acreage Z27 Building Square Feet 12,000 Floodplain Acreage. 0 per Chapter 245 of the Texas Local Government contact city staff for additional information. that the facts stated herein and exhibits attached hereto are true Date 1111 1 Page 3 of 11