Loading...
HomeMy WebLinkAboutStaff Comments(*Or1 CITY OF, COIS,IIGE .STATION Home afTexz A&M University June 4, 2012 Planning & Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM TO: Ray Bomnskie, Brazos Valley Church of Christ, via: Ilaggiescout(cDgmail.com FROM: Teresa Rogers, Staff Planner SUBJECT: BRAZOS VALLEY CHURCH OF CHRIST - Final Plat Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by any Monday at 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting held in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Thirteen (13) 1 Vx17" copies of the revised final plat; One (1) Mylar original of the revised final plat (required after P&Z approval); and One (1) copy of the digital file of the final plat on diskette or e-mail to: pdsdigitalsubmittal(cDcstx.gov. Upon receipt of the required documents for the Planning & considered formally filed with the City of College Station. expire in 90 days from the date of this memo, if the applicant comments and revised documents to the Administrator that Zoning Please meeting, your project will note that this application has not provided written respo be will nse seek to address the staff review comments contained herein. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.csb(.gov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments cc: J. Dale Browne, Jr., P.E., McClure & Browne Engineering/Surveying; via email: daleb(cDmcclurebrowne.com Case file no. 12-00500106 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 1 of 4 STAFF REVIEW COMMENTS NO. 1 Project: BRAZOS VALLEY CHURCH OF CHRIST (FP) - 12-00500106 PLANNING 1. Remove Norton Lane from the boundary (dark line) of the plat. This revision will include modifications to the metes and bounds description, the lot corner markers, and the survey monument. This Partition Tract is currently owned by multiple parties and is not a part of this development. In order to include it on the Final Plat all owners would need to sign the Final Plat Application, Final Plat and they will need to be included in the title block. 2. The Preliminary Plat approved in 2007 that granted a waiver to sidewalk requirements has expired. Therefore it will be necessary to revise the Final Plat application to include a Waiver Request to Subdivision Regulations and pay the associated Waiver Request Fee in order to not construct sidewalks along Wellborn Road. Staff will be in support of the waiver based on the previous Planning and Zoning Commission decision to approve the request, but the current Planning and Zoning Commission has the authority for final approval/denial in this request. 3. The plat currently includes three Certificates of Ownership and Dedication. Please clarify if it is necessary for all directors of the Brazos Valley Church of Christ to sign documents. If everyone must sign the documents, the Final Plat Application will need to be revised to also include their names and signatures and they must also be listed on the Final Plat in the title block. However, if they do not need to sign the documents, please remove the two extra Certificates of Ownership and Dedication. 4. Revise the Certificate(s) of Ownership and Dedication to include the last sentence stating: All such dedications shall be in fee simple unless expressly provided otherwise. Also, remove are from "and whose name are subscribed hereto" and replace it with the word is. 5. Revise the Approval of Planning and Zoning Commission to state Certificate of Planning and Zoning Commission. 6. Revise the Certificate of County Clerk to include "State of Texas, County of Brazos" as shown in Section 8.8 Certifications in the Unified Development Ordinance. 7. Correct the distance for the south property line to be 628.41 feet on the Final Plat so it will match the distance listed in the Metes and Bounds. The current number of 606.90 may be listed adjacent to the boundary, which when added to 21.50 of ROW dedication, gives the entire measured distance. 8. Revise the ownership for the tract currently listed as Betty Albright Bathelor to Stanley & B M Riley Krenek and the tract for Jehoon & Manique Youm Park to Juan J and Hee O Rocha. 9. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. 10. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. Reviewed by: Teresa Rogers Date: June 1, 2012 ENGINEERING COMMENTS NO. 1 1. Please show and label the existing 20-ft PUE (V.9075, P.13) along the front of property. 2. Why is the distance along the southern property line different from that on the preliminary plat? 3. Please add a note regarding maintenance responsibility of Norton Ln. 4. Please provide a 20-ft rear lot PUE. Reviewed by: Erika Bridges Date: June 4, 2012 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes or provides descriptive easements for electric infrastructure as designed by CSU for electric lines (where applicable, including street lights) 2. Developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. 3. The following easements will be required: Show 10' easement each side of the existing single phase overhead electrical line. 20' easement total. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull boxes and secondary pedestals provided by CSU). 8. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to: wdavis@cstx.gov. 9. Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. 10. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. 11.To discuss any of the above electrical comments please contact Weldon Davis at 979.764.5027. Reviewed by: Weldon Davis Date: May 29, 2012 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 3 of 4 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: May 29, 2012 TxDOT 1. No Additional Comments Reviewed by: Chad Bohne Date: May 25, 2012 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 4 of 4 CITY OF COI].6GF. STATION Home ofTe AdM Unio iV- 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM June 18, 2012 TO: Ray Bomnskie, Brazos Valley Church of Christ, via email: ilaggiescout CDgmail.com FROM: Teresa Rogers, Staff Planner SUBJECT: BRAZOS VALLEY CHURCH OF CHRIST (FP) - Final Plat Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by any Monday at 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting held in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat, Thirteen (13) 11"x17" copies of the revised final plat, and One (1) copy of the digital file of the final plat on diskette or e-mail to pdsdig italsubmittal (o).cstx. gov. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.csb(.gov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: J. Dale Browne, Jr., P.E., McClure & Browne Engineering/Surveying, via email: daleb gnmcclurebrowne.com Case file #12-00500106 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 2 Project: BRAZOS VALLEY CHURCH OF CHRIST (FP) - 12-00500106 ENGINEERING COMMENTS NO. 2 1. (Repeat) Please show and label the existing 20-ft PUE (V.9075, P.13) along the front of property. It looks like the easement actually curves slightly towards Wellborn in the area where the ROW is located. Please revise. 2. (Repeat) Please add a note regarding maintenance responsibility of Norton Ln. Since Norton Ln. has been removed from the bounds of the plat and the church will not be taking access from the driveway, the note is no longer necessary and should be removed. Reviewed by: Erika Bridges Date: June 15, 2012 Home of Texas A&M University