HomeMy WebLinkAboutFolder 2.44FOR OFFICE USE ONLY
Case No. __ ._... .......... ---T----fl'----1
DEVELOPMENT PERMIT
MINIMUM SUBMITTAL REQUIREMENTS
[8J $200.00 Development Permit Application Fee.
[8J Drainage and erosion control plan, with supporting Drainage Report two (2) copies each D Notice of Intent (N.0.1.) if disturbed area is greater than 5 acres
LEGAL DESCRIPTION Parkway Plaza Addition. Phase 11
APPLICANT (Primary Contact for the Project):
Name Steve E. Duncan P.E. _____ _;;:;..=-.;...;;_;::;.;.....::;-=....;~-'-l....,.;.....;..=.;._ ___ ~ E-Mail ----=sc..=e.:::.d"""@'""'p:;.;_k=e..:....:n.;;.i.g;..:..;in'-=e=e;,_;,;rin;...:.og=.=co=m..:...;__ __
Street Address ----------------'-7....::.0=2-=-0--=C:;....;:o;...i.y=o..:...:te'-'R~un'-'--------------
City Bryan State Texas Zip Code ...... 7--78"'°"0"'""8'------
Phone Number ____ __.....(9_7-'-9.._) _73--1.._-....... 80.._0._0______ Fax Number (979) 731-1500
PROPERTY OWNER'S INFORMATION:
Name Parkway Baptist Church. Chris Snidow, Pastor E-Mail ___ _.p=a=s=to=r_..@__.p"'"'b"""c:....::c=s=.o;.;...rg..__ __ _
Street Address ________________ 1--=5....::.0-'-1--=S:;....;:o'"""u=th"""'w""""e"""s'""'t---P....::.a'"""'rk"""'w-'-'a""'y'----------
City ---~C-'-o_lle....,g .... e_S.._t~a ....... ti ....... on ____ State Texas Zip Code ...... 77--8.._4 ___ 2 ______ _
Phone Number _____ (._9_7""'"'9)._6.._9"""3_-4_7-'0_1 ___ _ Fax Number (979) 693-1328
ARCHITECT OR ENGINEER'S INFORMATION:
Name Steve E. Duncan P.E. _____ ....--=-.;...;;_;::;.;.....::;-=...,;==-'-l....,.;.....;..=.;._ ___ ~ E-Mail ----=sc..=e.:::.d=@ .... o:;.;_k=e..:....:n.w.g'"""in=e=e;,_;,;rin"""g""'.-=-co=m..:...;__ __
Street Address ----------------'7--=0=2=0--=C"'""o'""'y....::.o"""'te'-'-'R-=u""""n __________ _
City Bryan State Texas Zip Code ...... 77.._8 ..... 0'""'8 _____ _
Phone Number _____ (._9_7""'"'9)._7.._3_1_-8 __ 0-'0 ....... 0____ Fax Number (979) 731-1500
Application is hereby made for the following development specific site/waterway alterations:
ACKNOWLEDGMENTS:
I, Steve E. Duncan. P.E. , design engineer/owner, hereby acknowledge or affirm that:
The information and conclusions contained in the above plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage
Policy and Design Standards.
As a condition of approval of this permit application, I agree to construct the improvements proposed in this
application according to these documents and the requirements of Chapter 13 of the College Station City
Code
Property Owner(s) {}-f ;lh:<a1f) Contractor
1-Aug-02 1 of 2
CERTIFICATIONS: (for proposed alterations within designated flood hazard areas.)
A. I, Steve E. Duncan, P.E. , certify that any nonresidential structure on or proposed to be on this site as
part of this application is designated to prevent damage to the structure or its contents as a result of
flooding from the 100 year storm.
• ---'-'Y-~~~h-"'--t?',2.. ___ _
Engineer Date
B. I, Steve E. Duncan. P.E. , certify that the finished floor elevation of the lowest floor, including any
basement, of any residential structure, proposed as part of this application is at or above the base flood
elevation established in the latest Federal Insurance Administration Flood Hazard Study and maps, as
amended.
Engineer Date
C. I, Steve E. Duncan. P.E. , certify that the alterations or development covered by this permit shall not
diminish the flood-carrying capacity of the waterway adjoining or crossing this permitted site and that
such alterations or development are consistent with requirements of the City of College Station City
Code, Chapter 13 concerning encroachments of floodways and of floodways fringes.
Engineer Date
D. I, Steve E. Duncan. P.E. , do certify that the proposed alterations do not raise the level of the 100 year
flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study.
Engineer Date
Conditions or comments as part of approval: -----------------------
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets,
or existing drainage facilities. All development shall be in accordance with the plans and specifications
1-Aug-02 2 of 2
' ; .
Pledger Kalkomey, Inc.
Consulting Engineers
October 21, 2002
Ms. Bridgette George
City of College Station
P.O. Box 9960
College Station, Texas 77842
Re: Parkway Baptist Church
New Multi-Purpose Building
PK Job No. 37600-021
Dear Ms. George:
Enclosed please find
referenced project.
the following
/0-2l#JZ ff::. 101
7020 Coyote Run .... <l6d-Y.4
Bryan, Texas 77808 UT'"
979-731-8000, 979-731-1500 (Fax)
www.pkengineering.com
information for the
Items in response to your Development Permit Memo dated
September 4, 2002:
Development Permit:
a. Check No. 11061 for $600. 00 dated September 11, 2 002
for the Infrastructure Inspection Fee.
b. The Easement Dedication Sheet and required attachments
were transmitted on September 9, 2002.
c. Two ( 2) originals of the Certification sheet for the
Drainage Report are enclosed.
d. The revised plans were transmitted on September 9, 2002
and September 12, 2002 with the exception of the water
line profile. Three (3) copies of the water line
profile sheet are enclosed.
Engineering:
1. Previously transmitted.
2. Previously transmitted.
3. Previously transmitted.
4. Previously transmitted.
5. Previously transmitted.
6. Previously transmitted.
7. OK, check enclosed.
8. The certification sheet is attached.
S:\2000137600-021 PARKWAY BAPTIST---new building\cs-08-site review 3 response.doc
Brenham • Bryan • Conroe • Rosenberg
Ms. Bridgette George
October 21, 2002
Page 2
9. Per our conversation, the trickle channel has
included to handle erosive velocities during low
conditions. During the 10-year and larger storms,
area is flooded.
been
flow
the
In response to the Conditional Use Site Plan Review Memo dated
September 11, 2002:
Engineering:
3. A signed and sealed copy of the revised engineering
estimate is attached.
Per your October 11, 2002 email , please find a letter for proof
of authority allowing the designated trustees to sign any
required forms on behalf of Parkway Baptist Church.
If you have any questions, please contact me at 979-731-8000,
979-731-1500 (fax), or sed@pkengineering.com.
Very Truly Yours ,
Steve E. Duncan, P.E.
SED/rlm
Enclosures
cc: Parkway Baptist Church
Robert Payne, R.L. Payne & Associates
~-v DEVELOPMENT PERMIT
PERMIT NO. 02-44
Project: PARKWAY BAPTIST CHURCH
COLLlGl STATION FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
PARKWAY PLAZA
ADDITION PH 2
DATE OF ISSUE: t11!il0? <9 l \ lu..f o3
OWNER:
PARKWAY BAPTIST CHURCH
1501 SOUTHWEST PARKWAY
CS, TX 77842
SITE ADDRESS:
1501 SOUTHWEST PARKWAY
DRAINAGE BASIN:
Bee Creek Trib. "A"
VALID FOR 12 MONTHS
CONTRACTOR:
TYPE OF DEVELOPMENT: Full Development Permit
SPECIAL CONDITIONS:
All construction must be in compliance with the approved construction plans
All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not
count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter.
EROSION CONTROL MUST BE IN PLACE UPON CITY INSPECTION.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate
construction site in accordance with the approved erosion control plan as well as the City of College Station
Drainage Policy and Design Criteria. If it is determined the prescribed erosion control measures are ineffective
to retain all sediment onsite, it is the contractors responsibility to implement measures that will meet City, State
and Federal requirements. The Owner and/or Contractor shall assure that all disturbed areas are sodden and
establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion
control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original
condition , placement and state. The Owner and/or Contractor shall be responsible for any damage to
adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion,
siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced
before any operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets,
or existing drainage facilities.
I hereby grant this permit for development of an area inside the special flood hazard area. All development
shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the
development permit application for the above named project and all of the codes and ordinances of the City of
College Station that apply.
Owner~ontractor Date
~-v DEVELOPMENT PERMIT
PERMIT NO. 02-44
Project: PARKWAY BAPTIST CHURCH
COLLlGE STATION FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
PARKWAY PLAZA
ADDITION PH 2
DATE OF ISSUE: 12/03/02
OWNER:
PARKWAY BAPTIST CHURCH
1501 SOUTHWEST PARKWAY
CS, TX 77842
TYPE OF DEVELOPMENT:
SPECIAL CONDITIONS:
SITE ADDRESS:
1501 SOUTHWEST PARKWAY
DRAINAGE BASIN:
Main Bee Creek
VALID FOR 12 MONTHS
CONTRACTOR:
Full Development Permit
All construction must be in compliance with the approved construction plans
All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not
count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter.
EROSION CONTROL MUST BE IN PLACE UPON CITY INSPECTION.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate
construction site in accordance with the approved erosion control plan as well as the City of College Station
Drainage Policy and Design Criteria. If it is determined the prescribed erosion control measures are ineffective
to retain all sediment onsite, it is the contractors responsibility to implement measures that will meet City, State
and Federal requirements. The Owner and/or Contractor shall assure that all disturbed areas are sodden and
establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion
control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original
condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to
adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion,
siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced
before any operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets,
or existing drainage facilities.
I hereby grant this permit for development of an area inside the special flood hazard area. All development
shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the
development permit application for the above named project and all of the codes and ordinances of the City of
Coll e Station that apply.
lZ-/03;bz..
Date 1
Owner/Agent/Contractor Date
PARKWAY BAPTIST CHURCH
NEW MULTIPURPOSE BUILDING
PK JOB NO . 37600-021
ESTIMATE OF PROBABLE COST FOR PUBLIC INFRASTRUCTURE
ITEM I UNITI $/UNIT I# UNITS I TOTAL COST
1 6" C-900 PVC WATER LINE LF 15.00 190 $ 2,850 .00
6" DI WATER LINE IN 12 " x 3 /8 "
2 CASING BY BORE LF 80 .00 80 6,400.00
3 6" DI WATER LINE LF 30.00 20 600.00
4 6 II x 12" TAPPING SLEEVE & VALVE EA 1,800.00 1 1,800.00
5 6 II DI BEND EA 150.00 1 150 .00
6 6" DI TEE EA 300 .00 2 600 .00
7 6" DI PLUG EA 100.00 1 100 .00
8 FIRE HYDRANT ASSEMBLY EA 2,000.00 1 2,000 .00
9 2" DOMESTIC METER EA 2,650 .00 1 2,650.00
10 1 1 /2 " IRRIGATION METER EA 2,650.00 1 2,650.00
11 REPLACE 4' SIDEWALK SF 4.00 125 500.0 0
12 SEEDING LS 200 .00 1 200.00
$20,500.00
WATER ESTIMATE 2002-11-07 .xls
Pledger Kalkomey, Inc.
Consulting Engineers
December 2, 2002
Ms. Bridgette George
City of College Station
P.O. Box 9960
College Station, Texas 7784 2
Re: Parkway Baptist Church
New Multi-Purpose Building
PK Job No. 37600 -021
Dear Ms. George:
7020 Coyote Run
Bryan, Texas 77808
979-731-8000, 979-731-1500 (Fax)
www.pkengineering.com
Enclosed please find four (4) copies of the following approved
Water Line Profile, dated October 16, 2002 for the referenced
project.
If you have any questions , please contact me at 979-731-8 000,
979-731-1500 (fax), or sed@pkengineering .com .
Very Truly Yours,
Steve E. Duncan, P.E.
SED/rlm
cc: R. L. Payne & Associates, 1 copy
Parkway Baptist Church, 1 copy
S:\2000137600-021 PARKWAY BAPTIST--new building\cs-13-approved water profile.doc
Brenham • Bryan • Conroe • Rosenberg
Pledger Kalkomey, Inc.
DJ.-11&
7020 Coyote Run
Bryan, Texas 77808
11/11/02-
q :LJ~~
Jt
Consulting Engineers 979-731-8000, 979-731-1500 (Fax)
www.pkengineering.com
November 7, 2 002
Ms. Bridgette George
City of College Station
P.O. Box 9960
College Station, Texas 77842
Re: Parkway Baptist Church
New Multi-Purpose Building
PK Job No. 37600-021
Dear Ms. George:
Enclosed please find the following in response
Development Permit Memo dated November 4, 2002:
• 1 copy of the revised cost estimate.
to y our
• 1 blueline of the Waterline Profile (C.1.6) with revision
no. 1 dated today.
• Letter from Maurice Janae and Don Jensen for temporary
construction access to Lot l, Block 1 of Southwood #19.
• Staff Review Comment replies:
1 . The sanitary sewer line was changed to 10-inch.
2 . The water line was lowered for 4-feet mini mum cover.
3 . An additional joint of DI pipe was added and a note
stating that both lines had to be tested was added.
4. The cost estimate has been revised.
5 . The bore pit is shown along with a note, the letter
has been obtained.
6. The north arrow has been corrected.
7MlL'.
Steve E. Duncan, P.E.
sed@pkengineering.com
SED /rlm
Enclosures
cc: Parkway Baptist Church
Robert Payne, R.L. Payne & Associates
S:\2000137600-021 PARKWAY BAPTIST---ncw building\cs-10-dev pcnnit.doc
Brenham • Bryan • Conroe • Rosenberg
Parkway Baptist Church
New Multi Purpose Building
PK Job No. 37600-021
Parkway Baptist Church
1501 Southwest Parkway
College Station, Texas 77840
(979) 693-4701
I , Steve E. Duncan, P.E. certify that the design for the
aforementioned development is reasonably safe from f loading
in accordance with the guidance provided within FEMA's
Technical Bulletin 10-01 related to ensuring that structures
Vice President
Title
Professional Engineer
Type of License
Steve E. Duncan, P.E.
Pledger Kalkomey, Inc.
7020 Coyote Run
Bryan, Texas 77808
(979) 731-8000
(979) 731-1500 Fax
sed@pkengineering.com
www.pkengineering.com
December 31, 2002
from f loading and in accordance with
practices.
Date r I
83252
License Number
License Expiration Date
S:\2000\3760-0-021 PARKWAY BAPTIST--ncw building\FEMA -Professional Certification.doc
Pledger Kalkomey, Inc.
Consulting Engineers
November 20, 2002
Ms. Bridgette George
City of College Station
P.O. Box 9960
College Station, Texas 77842
Re: Parkway Baptist Church
New Multi-Purpose Building
PK Job No. 37600-021
Dear Ms. George:
7020 Coyote Run
~l--6oi..
13Sr
Bryan, Texas 77808
979-731-8000, 979-731-1500 (Fax)
www.pkengineering.com
Enclosed please find the revised Waterline Profile Sheet (C.1.6)
dated October 16, 2002 to be stamped approved for the referenced
project.
Very Truly Yours,
Steve E. Duncan, P.E.
sed@pkengineering.com
SED/rlm
Enclosures
S:\2000137600-021 PARKWAY BAPTIST--new building\cs-12-transmit waterline profile.doc
Brenham • Bryan • Conroe • Rosenberg
TO: Steve Duncan
Parkway Baptist church
1501 Southwest Paarkway
CS,Tx.77842
FROM;MAURICE JANAC
SUBJECT;ACCESS TO PROPERTY
Granting temporary construction
Access a s l u110 1·: ii~ p1 upe 1 t y
is restored back to it's
orignal conditon .
'• • \ J • ,. ~
• '(\I '·'('ti f j.'i''l~.~-,.· 1. b'l '·•I . H ~ '
1 , · 1) I',., , >-r, · , t, 1 1 •·. • 1 , 1 Jr t : I
J () : c" (" ('>!"1 j( '.j 1
0 ':': -:i. < N 0 ~ 00 0 N 8 ~ 'S oii ~ .; ;;: ~ "' i " :§ ·5 ~ " " T t; ~ cc >-< ;;: ~ < c.. N 0 0 0 'C ::;; 6 0 0 ~ l •~I I I @) @ ® CD @ ® $, , ·~ '{() 11/1/od-<:::'.'.) ~ \ -. ~ ~
Parkway Baptist Church
October 15, 2002
Ms. Bridgette George
City of College Station
Development Services
P. 0. Box 9960
College Station, TX 77842
Dear Ms. George:
1501 Southwest Parkway
P.O. Box 10104
College Station, Texas 77842
Phone (409) 693-4701
According to Section two (2), Number seven (7) of our By-Laws, the Trustees have
authority to sign legal documents involving the sale, mortgage, purchase, or rental of
property, or other legal documents related to church approved matters. The Certificate
of Incorporation with addendums on record with the State of Texas, charter no.
00469882-01 lists the original Trustees. Our current Trustees are:
1. Mr. Bill Scott
2. Dr. Bob Johnson
3. Dr. Roy Cornwell
Should you have any questions, please do not hesitate to contact me.
Thank you for your help concerning this matter.
Sincerely,
Chris Snidow, Pastor
STAFF REVIEW COMMENTS NO. 1
Project: DP-PARKWAY PLAZA ADDITION PH 2 (DP) -DEVELOPMENT PERMIT (02-
00100044)
ENGINEERING
1. Our maps show the sanitary sewer line along Southwest Parkway to be a 10-inch
diameter line. You show a 6-inch line. Please verify.
2. The proposed water line from Station 133 to Station 215, has less than the required
4 feet of cover. Increase depth of water line in this area to meet requirement.
3. Please refer to TNRCC §290.44 e.B.iv.111, regarding the water line crossing under
the existing wastewater line. You will meet the regulations by continuing the DI pipe
to one joint passed the bend, before changing to PVC. In addition, both the water
line and wastewater line must pass a pressure and leakage test per AWWA C600
standards.
4. Provide revised cost estimate or addendum to reflect water line revisions.
5. Show southern bore pit on plan view to verify you will not be in private property. If
pit is in private property and not in easement, provide a letter from the property
owner granting temporary construction access.
6. Please check orientation of north arrow.
Reviewed by: Spencer Thompson Date: October 31, 2002
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Staff Review Comments Page 2 of 4
DRAINAGE REPORT
PREPARED FOR :
PARKWAY BAPTIST CHURCH
CITY OF COLLEGE STATION
BRAZOS COUNTY, TEXAS
PK JOB NO. 37600 -021
PREPARED BY :
PLEDGER KALKOMEY , I NC .
CONSULTING ENGINEERS
7020 COYOTE RUN
BRYAN, TEXAS 77808
Tel: (979) 731-8000
Fax: (979) 731 -1500
sed@pkengi neering.com
www.pkengineering.com
s l.2000U1000.0'11 PARKWAY 8APTIST-·---bu~\()r..,.Rtl0Cf1\dr .. l'l•IOQl"1· Priw•18ao~ll Churel'lwp:I
PURPOSE
Development of the subject property involves the addition of a
building, sidewalks, and additional parking spaces. The drainage
area affected by the development contains approximately 3.8 acres
of land. Reference is made to the attached grading plan (sheet
C.0.3, Draft dated 8/19/02) drawing. The increase in runoff from
the development for all frequencies of storm events up to and
including the twenty-five year (25-year) storm event must be
mitigated to not increase downstream flow rates. This report
documents the engineering analysis for the mitigation through
diverting the runoff towards the existing Bee Creek flood plain.
METHODOLOGY
Using field surveying data the three watersheds affected by the
proposed development were delineated.
The Rational Method was used to compute the peak flow rates for
this study. The area (A) of each drainage area was obtained from
the maps. Based on existing land use patterns, the weighted c
factor for each area was determined. A velocity-distance
relationship was used to compute the time of concentration (tc) for
each area with a minimum time of concentration of ten (10) minutes.
The rainfall intensity (I) for each drainage area was determined
using the following formula from the State Department of Highways
and Public Transportation Bridge Division Hydraulic Manual, Third
Edition, December 1985.
I = b
The peak flow rates (Q) for each drainage area were computed with
the following formula:
Q = (c) (I) (A)
S\2000\31000-021 PARKWAVBAPnsr-~\QfeonR~ ..... rllpllf1-P.n..wrtB"Pll•IChurchwpd
The procedure was then repeated for the developed conditions of
each of the watersheds. After development, the boundaries and
areas of the proposed watersheds differ from that of the existing
watersheds due to the re-grading of the property.
RESULTS
The drainage area information and the calculations for the existing
and proposed conditions are attached.
The subject property and the adjacent park are both within the 10
year and 25 year flood plains of Bee Creek. No detention is
proposed since the subject property and park are already submerged
and the increase in runoff from the proposed development will
result in no significant change to the flood plain. Drainage area
#1 and Drainage area #2 both drain into the existing storm inlet
located at the northeastern entrance on Southwest Parkway.
The boundary between drainage area #3 and drainage area # 2 was
shifted to off set the increa se in runoff rates from drainage areas
#1 and #2 to the existing storm inlet. The increase in runoff of
drainage area #3 is detained in the flood plain. The changes in
rates are as follows.
DRAINAGE AREAS #1 and #2 COMBINED (FLOW RATE AT STO RM INLET)
EXISTING AREA = 1.28 ACRES
PROPOSED AREA= 0.69 ACRES
Storm EXISTING PEAK
Event FLOW RATE (cfs)
2 yr 2.84
5 yr 3.45
10 yr 3 .88
25 yr 4.43
DRAINAGE AREA #3 (FLOW RATE AT FLOOD PLAIN)
EXISTING AREA= 2.65 ACRES
PROPOSED AREA= 2.89 ACRES
Storm EXISTING PEAK
Event FLOW RATE (cfs)
2 yr 7.24
5 yr 8.84
10 yr 9.93
25 yr 11.35
PROPOSED PEAK
FLOW RATE (cfs)
2.71
3.30
3 .71
4.23
PROPOSED PEAK
FLOW RATE (cf s)
11.60
14.17
15.95
18.2 3
PARK0lAY BAPTIST CHURCH
CITY OF COLLEGE STATION, TEXAS
EXISTING DRAINAGE BOUNDARIES
I
EXISTING CULVERT
. -' ' ,, ...... ~
' ' '
PATH FOR TIME OF
CONCENTRATION
0 10'
\
,,
,.>
[[II Pledger Kalkomey, Inc. lllKJ Consulting Engineers
7020 Coyote Run • Bryan, Teus 77808
979-731-8000 • 979-731-1500 (Fax)
www.pkeoginccring.com
Brenham · Bryan • Conroe • Rosenberg
PARK~AY BAPTIST CHURCH
CITY OF COLLEGE STATION, TEXAS
PROPOSED DRAINAGE BOUNDARIES
I
·. ;. . "~ ,., ~· .....
-~ ... ·t ~--
2
0 10'
.. I i
I .·
I
.1 I I .. 1 I I
I
----::.1
I
/
I
---
[Ell Pledger Kalkomey, Inc. Ill{] Consulting Engineers
7020 Coyote Run · Bryan. TeUJ 77808
979-731-8000 · 979-731-1500(Fax)
www.pkeoginocring.com
Brenham • Bryan • Conroe • Rosenberg
PARKWAY BAPTIST CHURCH 8/18/02 11 :03 PM
CITY OF COLLEGE STATION, BRAZOS COUNTY, TEXAS
REFERENCE: TXDOT BRIDGE DIVISION HYDRAULIC MANUAL
STORM EVENT: B D E
2 YR STORM 65 8.0 0.806
2 YEAR STORM
DRAINAGE AREA #1
EXISTING:
TRAVEL V, FPS TIME
TYPE LF I % (FIG 5) SEC I MIN
TC, MIN GRASSED PASTURE 250 1.2% 0.8 333.33 5.56
PAVED AREA 50 2.0% 2.8 17.86 0.30
10.00
I TYPE C (TBL5) I % c I
C, -CONCRETE DRIVES/WALKS 0.90 48.4% 0.44
LAWNS -CLAY/SAND SOIL <2% 0.20 45.3% 0.09
ROOFS 0.9 6.3% 0.06
100.0% 0.58
I, IN/HR B/(TC+D)"E 6.33
TYPE SF I ACRES I A, ACRES CONCRETE DRIVES/WALKS 12,260 0.28
LAWNS -CLAY/SAND SOIL <2% 11,488 0.26
ROOFS 1,587 0.04
25,335 0.58
Q,CFS CIA 2.14
PROPOSED:
TRAVEL V,FPS TIME
TYPE LF I % (FIG 5) SEC I MIN
TC, MIN GRASSED PASTURE 250 1.2% 0.8 333.33 5.56
PAVED AREA 50 2.0% 2.8 17.86 0.30
10.00
I TYPE C (TBL5) I % c
c -CONCRETE DRIVES/WALKS 0.90 48.9% 0.44
LAWNS -CLAY/SAND SOIL <2% 0.20 39.0% 0.08
ROOFS 0.90 12.1% 0.11
100.0% 0.63
I, IN/HR B/(TC+D)"E 6.33
I TYPE SF ACRES I A. ACRES CONCRETE DRIVES/WALKS 14,498 0.33
LAWNS -CLAY/SAND SOIL <2% 11 ,551 0.27
ROOFS 3,577 0.08
29,626 0.68
Q,CFS CIA 2.70
PARKWAY BAPTIST CHURCH 8/18/02 11 :03 PM
CITY OF COLLEGE STATION, BRAZOS COUNTY, TEXAS
REFERENCE: TXDOT BRIDGE DIVISION HYDRAULIC MANUAL
STORM EVENT: B D E
2 YR STORM 65 8.0 0.806
2 YEAR STORM
DRAINAGE AREA #2
EXISTING:
TRAVEL V,FPS TIME
I TYPE LF I % (FIG 5) SEC I MIN
TC, MIN GRASSED PASTURE 180 1.9% 1.0 180.00 3.00
10.00
I TYPE C (TBL5) I % c I c -CONCRETE DRIVES/WALKS 0.90 3.5% 0.03
LAWNS -CLAY/SAND SOIL <2% 0.20 83.4% 0.1 7
ROOFS 0.9 13.1 % 0.12
100.0% 0.32
I, IN/HR B/(TC+D)"E 6.33
TYPE SF I ACRES I A, ACRES CONCRETE DRIVES/WALKS 530 0.01
LAWNS -CLAY/SAND SOIL <2% 12,661 0.29
ROOFS 1,990 0.05
15,181 0.35
Q,CFS CIA 0.70
PROPOSED:
TRAVEL V,FPS TIME
I TYPE LF I % (FIG 5) SEC I MIN
TC, MIN GRASSED PASTURE 40 1.9% 1.0 40.00 0.67
PAVED AREA 90 2.0% 2.8 32 .14 0.54
10.00
TYPE C (TBL5) I % c I c -CONCRETE DRIVES/WALKS 0.90 0.0% 0.00
LAWNS -CLAY/SAND SOIL <2% 0.20 100.0% 0.20
100.0% 0.20
I, IN/HR B/(TC+D)"E 6.33
TYPE SF ACRES I A. ACRES CONCRETE DRIVES/WALKS 0.00
LAWNS -CLAY/SAND SOIL <2% 577 0.01
577 0.01
Q,CFS CIA 0.02
PARKWAY BAPTIST CHURCH 8/18/02 11 :03 PM
CITY OF COLLEGE STATION, BRAZOS COUNTY, TEXAS
REFERENCE: TXDOT BRIDGE DIVISION HYDRAULIC MANUAL
STORM EVENT: B D E
2 YR STORM 65 8.0 0.806
2 YEAR STORM
DRAINAGE AREA #3
EXISTING:
TRAVEL V,FPS TIME
I TYPE LF I % (FIG 5) SEC I MIN
TC, MIN GRASSED PASTURE 360 0.8% 0.7 553.85 9.23
PAVED AREA 270 1.1% 2.1 128.57 2.14
11 .37
I TYPE C (TBL5) I % c I c -CONCRETE DRIVES/WALKS 0.93 28 .3% 0.26
LAWNS -CLAY/SAND SOIL <2% 0.20 64.6% 0.13
ROOFS 0.93 7.1% 0.07
100.0% 0.46
I, IN/HR B/(TC+D)"E 5.96
TYPE SF ACRES I
A, ACRES CONCRETE DRIVES/WALKS 32,625 0.75
LAWNS -CLAY/SAND SOIL <2% 74,549 1.71
ROOFS 8,250 0.19
115,424 2.65
Q,CFS CIA 7.24
PROPOSED:
TRAVEL V,FPS TIME
TYPE LF I % (FIG 5) SEC I MIN
TC, MIN GRASSED PASTURE 390 0.9% 0.7 557.14 9.29
PAVED AREA 360 1.0% 2 180.00 3.00
12.29
I TYPE C (TBL5) I % c
C, -CONCRETE DRIVES/WALKS 0.93 50.9% 0.47
LAWNS -CLAY/SAND SOIL <2% 0.20 31.6% 0.06
ROOFS 0.93 17.5% 0.16
100.0% 0.70
I, IN/HR B/(TC+D)"E 5.75
I TYPE SF ACRES I
A, ACRES CONCRETE DRIVES/WALKS 64,017 1.47
LAWNS -CLAY/SAND SOIL <2% 39,750 0.91
ROOFS 21 ,970 0.50
125,737 2.89
Q,CFS CIA 11 .60
PARKWAY BAPTIST CHURCH 8/18/02 11 :04 PM
CITY OF COLLEGE STATION, BRAZOS COUNTY, TEXAS
REFERENCE: TXDOT BRIDGE DIVISION HYDRAULIC MANUAL
STORM EVENT: B D E
5 YR STORM 76 8.5 0.785
5 YEAR STORM
DRAINAGE AREA #1
EXISTING:
TRAVEL V, FPS TIME
I TYPE LF I % (FIG 5) SEC I MIN
TC, MIN GRASSED PASTURE 250 1.2% 0.8 333.33 5.56
PAVED AREA 50 2.0% 2.8 17.86 0.30
10.00
I TYPE C (TBL5) I % c
C, -CONCRETE DRIVES/WALKS 0.90 48.4% 0.44
LAWNS -CLAY/SAND SOIL <2% 0.20 45.3% 0.09
ROOFS 0.9 6.3% 0.06
100.0% 0.58
I, IN/HR B/(TC+D)"E 7.69
I TYPE SF ACRES I A, ACRES CONCRETE DRIVES/WALKS 12,260 0.28
LAWNS -CLAY/SAND SOIL <2% 11 ,488 0.26
ROOFS 1,587 0.04
25,335 0.58
Q,CFS CIA 2.61
PROPOSED:
TRAVEL V, FPS TIME
TYPE LF I % (FIG 5) SEC I MIN
TC, MIN GRASSED PASTURE 250 1.2% 0.8 333.33 5.56
PAVED AREA 50 2.0% 2.8 17.86 0.30
10.00
I TYPE C (TBL5) I % c I c -CONCRETE DRIVES/WALKS 0.90 48.9% 0.44
LAWNS -CLAY/SAND SOIL <2% 0.20 390% 0.08
ROOFS 0.90 12.1% 0.11
100.0% 0.63
I, IN/HR B/(TC+D)"E 7.69
TYPE SF ACRES I A, ACR ES CONCRETE DRIVES/WALKS 14,498 0.33
LAWNS -CLAY/SAND SOIL <2% 11 ,551 0.27
ROOFS 3,577 0.08
29,626 0.68
Q,CFS CIA 3.28
PARKWAY BAPTIST CHURCH 8/18/02 11 :04 PM
CITY OF COLLEGE STATION, BRAZOS COUNTY, TEXAS
REFERENCE: TXDOT BRIDGE DIVISION HYDRAULIC MANUAL
STORM EVENT: B D E
5 YR STORM 76 8.5 0.785
5 YEAR STORM
DRAINAGE AREA #2
EXISTING:
TRAVEL V,FPS TIME
TYPE LF I % (FIG 5) SEC I MIN
TC, MIN GRASSED PASTURE 180 1.9% 1.0 180.00 3.00
10.00
TYPE C (TBL5) I % c I c -CONCRETE DRIVES/WALKS 0.90 3.5% 0.03
LAWNS -CLAY/SAND SOIL <2% 0.20 83.4% 0.17
ROOFS 0.9 13.1% 0.12
100.0% 0.32
I, IN/HR B/(TC+D)"E 7.69
I TYPE SF I ACRES I A, ACRES CONCRETE DRIVES/WALKS 530 0.01
LAWNS -CLAY/SAND SOIL <2% 12,661 0.29
ROOFS 1,990 0.05
15, 181 0.35
Q,CFS CIA 0.85
PROPOSED:
TRAVEL V,FPS TIME
TYPE LF I % (FIG 5) SEC I MIN
TC, MIN GRASSED PASTURE 40 1.9% 1.0 40.00 0.67
PAVED AREA 90 2.0% 2.8 32.14 0.54
10.00
I TYPE C (TBL5) I % c c -CONCRETE DRIVES/WALKS 0.90 0.0% 0.00
LAWNS -CLAY/SAND SOIL <2% 0.20 100.0% 0.20
100.0% 0.20
I, IN/HR B/(TC+D)"E 7.69
TYPE SF ACRES I
A, ACRES CONCRETE DRIVES/WALKS 0.00
LAWNS -CLAY/SAND SOIL <2% 577 0.01
577 0.01
Q,CFS CIA 0.02
PARKWAY BAPTIST CHURCH 8/18/02 11 :04 PM
CITY OF COLLEGE STATION, BRAZOS COUNTY, TEXAS
REFERENCE: TXDOT BRIDGE DIVISION HYDRAULIC MANUAL
STORM EVENT: B D E
5 YR STORM 76 8.5 0.785
5 YEAR STORM
DRAINAGE AREA #3
EXISTING:
TRAVEL V,FPS TIME
I TYPE LF I % (FIG 5) SEC I MIN
TC, MIN GRASSED PASTURE 360 0.8% 0.7 553.85 9.23
PAVED AREA 270 1.1% 2.1 128.57 2.14
11 .37
I TYPE C (TBL5) I % c I c. -CONCRETE DRIVES/WALKS 0.93 28.3% 0.26
LAWNS -CLAY/SAND SOIL <2% 0.20 64.6% 0.13
ROOFS 0.93 7.1% 0.07
100.0% 0.46
I, IN/HR B/(TC+D)"E 7.27
TYPE SF ACRES
A, ACRES CONCRETE DRIVES/WALKS 32,625 0.75
LAWNS -CLAY/SAND SOIL <2% 74,549 1.71
ROOFS 8,250 0.19
115,424 2.65
Q,CFS CIA 8.84
PROPOSED:
TRAVEL V, FPS TIME
TYPE LF % FIG 5 SEC MI N
TC, MIN GRASSED PASTURE 390 0.9% 0.7 557.14 9.29
PAVED AREA 360 1.0% 2 180.00 3.00
12.29
TYPE C (TBL5) I % c
C, -CONCRETE DRIVES/WALKS 0.93 50.9% 0.47
LAWNS -CLAY/SAND SOIL <2% 0.20 31 .6% 0.06
ROOFS 0.93 17.5% 0.16
100.0% 0.70
I, IN/HR B/(TC+D)"E 7.02
TYPE SF ACRES
A, ACRES CONCRETE DRIVES/WALKS 64,017 1.47
LAWNS -CLAY/SAND SOIL <2% 39,750 0.91
ROOFS 21,970 0.50
125,737 2.89
Q,CFS CIA 14.17
PARKWAY BAPTIST CHURCH 8/18/02 11 :04 PM
CITY OF COLLEGE STATION, BRAZOS COUNTY, TEXAS
REFERENCE: TXDOT BRIDGE DIVISION HYDRAULIC MANUAL
STORM EVENT: B D E
10 YR STORM 80 8.5 0.763
10 YEAR STORM
DRAINAGE AREA #1
EXISTING:
TRAVEL V,FPS TIME
TYPE LF I % (FIG 5) SEC I MIN
TC, MIN GRASSED PASTURE 250 1.2% 0.8 333.33 5.56
PAVED AREA 50 2.0% 2.8 17.86 0.30
10.00
I TYPE C (TBL5) I % c
c -CONCRETE DRIVES/WALKS 0.90 48.4% 0.44
LAWNS -CLAY/SAND SOIL <2% 0.20 45.3% 0.09
ROOFS 0.9 6.3% 0.06
100.0% 0.58
I, IN/HR B/(TC+D)"E 8.63
I TYPE SF ACRES I
A, ACRES CONCRETE DRIVES/WALKS 12,260 0.28
LAWNS -CLAY/SAND SOIL <2% 11,488 0.26
ROOFS 1,587 0.04
25,335 0.58
Q,CFS CIA 2.93
PROPOSED:
TRAVEL V,FPS TIME
TYPE LF I % (FIG 5) SEC I MIN
TC, MIN GRASSED PASTURE 250 1.2% 0.8 333.33 5.56
PAVED AREA 50 2.0% 2.8 17.86 0.30
10.00
TYPE C (TBL5) I % c
C, -CONCRETE DRIVES/WALKS 0.90 48.9% 0.44
LAWNS -CLAY/SAND SOIL <2% 0.20 39.0% 0.08
ROOFS 0.90 12.1% 0.11
100.0% 0.63
I, IN/HR B/(TC+D)"E 8.63
I TYPE SF I ACRES I A, ACRES CONCRETE DRIVES/WALKS 14,498 0.33
LAWNS -CLAY/SAND SOIL <2% 11,551 0.27
ROOFS 3,577 0.08
29,626 0.68
Q,CFS CIA 3.68
PARKWAY BAPTIST CHURCH 8/18/02 11 :04 PM
CITY OF COLLEGE STATION, BRAZOS COUNTY, TEXAS
REFERENCE: TXDOT BRIDGE DIVISION HYDRAULIC MANUAL
STORM EVENT: B D E
10 YR STORM 80 8.5 0.763
10 YEAR STORM
DRAINAGE AREA #2
EXISTING:
TRAVEL V,FPS TIME
I TYPE LF I % (FIG 5) SEC I MIN
TC, MIN GRASSED PASTURE 180 1.9% 1.0 180.00 3.00
10.00
I TYPE C (TBL5) I % c I c -CONCRETE DRIVES/WALKS 0.90 3.5% 0.03
LAWNS -CLAY/SAND SOIL <2% 0.20 83.4% 0.17
ROOFS 0.9 13.1% 0.12
100.0% 0.32
I, IN/HR B/(TC+D)"E 8.63
TYPE SF ACRES I A, ACRES CONCRETE DRIVES/WALKS 530 0.01
LAWNS -CLAY/SAND SOIL <2% 12,661 0.29
ROOFS 1,990 0.05
15,181 0.35
Q,CFS CIA 0.95
PROPOSED:
TRAVEL V,FPS TIME
TYPE LF % FIG 5 SEC MIN
TC, MIN GRASSED PASTURE 40 1.9% 1.0 40 .00 0.67
PAVED AREA 90 2.0% 2.8 32.14 0.54
10.00
TYPE C (TBL5) I % c
c -CONCRETE DRIVES/WALKS 0.90 0.0% 0.00
LAWNS -CLAY/SAND SOIL <2% 0.20 100.0% 0.20
100.0% 0.20
I, IN/HR B/(TC+D)"E 8.63
I TYPE SF ACRES I
A, ACRES CONCRETE DRIVES/WALKS 0.00
LAWNS -CLAY/SAND SOIL <2% 577 0.01
577 0.01
Q,CFS CIA 0.02
PARKWAY BAPTIST CHURCH 8/18/02 11:04 PM
CITY OF COLLEGE STATION, BRAZOS COUNTY, TEXAS
REFERENCE: TXDOT BRIDGE DIVISION HYDRAULIC MANUAL
STORM EVENT: B D E
10 YR STORM 80 8.5 0.763
10 YEAR STORM
DRAINAGE AREA #3
EXISTING:
TRAVEL V,FPS TIME
I TYPE LF I % (FIG 5) SEC I MIN
TC, MIN GRASSED PASTURE 360 0.8% 0.7 553.85 9.23
PAVED AREA 270 1.1% 2.1 128.57 2.14
11.37
TYPE C (TBL5) I % c
c -CONCRETE DRIVES/WALKS 0.93 28.3% 0.26
LAWNS -CLAY/SAND SOIL <2% 0.20 64.6% 0.13
ROOFS 0.93 7.1% 0.07
100.0% 0.46
I, IN/HR B/(TC+D)AE 8.18
I TYPE SF I ACRES I
A, ACRES CONCRETE DRIVES/WALKS 32,625 0.75
LAWNS -CLAY/SAND SOIL <2% 74,549 1.71
ROOFS 8,250 0.19
115,424 2.65
Q,CFS CIA 9.93
PROPOSED:
TRAVEL V,FPS TIME
TYPE LF I % (FIG 5) SEC I MIN
TC, MIN GRASSED PASTURE 390 0.9% 0.7 557.14 9.29
PAVED AREA 360 1.0% 2 180.00 3.00
12.29
TYPE C (TBL5) I % c I c -CONCRETE DRIVES/WALKS 0.93 50.9% 0.47
LAWNS -CLAY/SAND SOIL <2% 0.20 31 .6% 0.06
ROOFS 0.93 17.5% 0.16
100.0% 0.70
I, IN/HR B/(TC+D)AE 7.90
TYPE SF ACRES I A. ACRES CONCRETE DRIVES/WALKS 64,017 1.47
LAWNS -CLAY/SAND SOIL <2% 39,750 0.91
ROOFS 21,970 0.50
125,737 2.89
Q,CFS CI A 15.95
PARKWAY BAPTIST CHURCH 8/18/02 11 :06 PM
CITY OF COLLEGE STATION, BRAZOS COUNTY, TEXAS
REFERENCE: TXDOT BRIDGE DIVISION HYDRAULIC MANUAL
STORM EVENT: B D E
25 YR STORM 89 8.5 0.754
25 YEAR STORM
DRAINAGE AREA #1
EXISTING:
TRAVEL V,FPS TIME
I TYPE LF I % (FIG 5) SEC I MIN
TC, MIN GRASSED PASTURE 250 1.2% 0.8 333.33 5.56
PAVED AREA 50 2.0% 2.8 17.86 0.30
10.00
TYPE C (TBL5) I % c
c -CONCRETE DRIVES/WALKS 0.90 48.4% 0.44
LAWNS -CLAY/SAND SOIL <2% 0.20 45.3% 0.09
ROOFS 0.9 6.3% 0.06
100.0% 0.58
I, IN/HR B/(TC+D)"E 9.86
I TYPE SF ACRES I
A, ACRES CONCRETE DRIVES/WALKS 12,260 0.28
LAWNS -CLAY/SAND SOIL <2% 11,488 0.26
ROOFS 1,587 0.04
25,335 0.58
Q,CFS CIA 3.34
PROPOSED:
TRAVEL V, FPS TIME
TYPE LF I % (FIG 5) SEC I MIN
TC, MIN GRASSED PASTURE 250 1.2% 0.8 333.33 5.56
PAVED AREA 50 2.0% 2.8 17.86 0.30
10.00
I TYPE C (TBL5) I % c
C, -CONCRETE DRIVES/WALKS 0.90 48.9% 0.44
LAWNS -CLAY/SAND SOIL <2% 0.20 39.0% 0.08
ROOFS 0.90 12.1 % 0.11
100.0% 0.63
I, IN/HR B/(TC+D)"E 9.86
TYPE SF ACRES I A. ACRES CONCRETE DRIVES/WALKS 14,498 0.33
LAWNS -CLAY/SAND SOIL <2% 11,551 0.27
ROOFS 3,577 0.08
29,626 0.68
Q,CFS CIA 4.21
PARKWAY BAPTIST CHURCH 8/18/02 11 :06 PM
CITY OF COLLEGE STATI ON, BRAZOS COUNTY, TEXAS
REFERENCE: TXDOT BRIDGE DIVISION HYDRAULIC MANUAL
STORM EVENT: B D E
25 YR STORM 89 8.5 0.754
25 YEAR STORM
DRAINAGE AREA #2
EXISTING:
TRAVEL V,FPS TIME
I TYPE LF I % (FIG 5) SEC I MIN
TC, MIN GRASSED PASTURE 180 1.9% 1.0 180.00 3.00
10.00
I TYPE C (TBL5) I % c I c -CONCRETE DRIVES/WALKS 0.90 3.5% 0.03
LAWNS -CLAY/SAND SOIL <2% 0.20 83.4% 0.17
ROOFS 0.9 13.1 % 0.12
100.0% 0.32
I, IN/HR B/(TC+D)"E 9.86
TYPE SF ACRES I
A, ACRES CONCRETE DRIVES/WALKS 530 0.01
LAWNS -CLAY/SAND SOIL <2% 12,661 0.29
ROOFS 1,990 0.05
15, 181 0.35
Q,CFS CIA 1.09
PROPOSED:
TRAVEL V,FPS TIME
TYPE LF I % (FIG 5) SEC I MIN
TC, MIN GRASSED PASTURE 40 1.9% 1.0 40.00 0.67
PAVED AREA 90 2.0% 2.8 32.14 0.54
10.00
I TYPE C (TBL5) I % c c -CONCRETE DRIVES/WALKS 0.90 0.0% 0.00
LAWNS -CLAY/SAND SOIL <2% 0.20 100.0% 0.20
100.0% 0.20
I, IN/HR B/(TC+D)"E 9.86
TYPE SF ACRES I
A, ACRES CONCRETE DRIVES/WALKS 0.00
LAWNS -CLAY/SAND SOIL <2% 577 0.01
577 0.01
Q,CFS CIA 0.03
PARKWAY BAPTIST CHURCH 8/18/02 11 :06 PM
CITY OF COLLEGE STATION, BRAZOS COUNTY, TEXAS
REFERENCE: TXDOT BRIDGE DIVISION HYDRAULIC MANUAL
STORM EVENT: B D E
25 YR STORM 89 8.5 0.754
25 YEAR STORM
DRAINAGE AREA #3
EXISTING:
TRAVEL V,FPS TIME
I TYPE LF I % (FIG 5) SEC I MIN
TC, MIN GRASSED PASTURE 360 0.8% 0.7 553.85 9.23
PAVED AREA 270 1.1% 2.1 128.57 2.14
11.37
TYPE C (TBL5) I % c
c -CONCRETE DRIVES/WALKS 0.93 28.3% 0.26
LAWNS -CLAY/SAND SOIL <2% 0.20 64.6% 0.13
ROOFS 0.93 7.1% 0.07
100.0% 0.46
I, IN/HR B/(TC+D)"E 9.34
I TYPE SF ACRES I
A, ACRES CONCRETE DRIVES/WALKS 32,625 0.75
LAWNS -CLAY/SAND SOIL <2% 74,549 1.71
ROOFS 8,250 0.19
115,424 2.65
O,CFS CIA 11.35
PROPOSED:
TRAVEL V,FPS TIME
TYPE LF I % (FIG 5) SEC I MIN
TC, MIN GRASSED PASTURE 390 0.9% 0.7 557.14 9.29
PAVED AREA 360 1.0% 2 180.00 3.00
12.29
TYPE C (TBL5) I % c
C, -CONCRETE DRIVES/WALKS 0.93 50 .9% 0.47
LAWNS -CLAY/SAND SOIL <2% 0.20 31.6% 0.06
ROOFS 0.93 17.5% 0.16
100.0% 0.70
I, IN/HR B/(TC+D)"E 9.03
TYPE SF ACRES I A. ACRES CONCRETE DRIVES/WALKS 64,017 1.47
LAWNS -CLAY/SAND SOIL <2% 39,750 0.91
ROOFS 21,970 0.50
125,737 2.89
Q,CFS CIA 18.23
CERTIFICATION
I hereby certify that this report for the drainage design of
Parkway Baptist Church was prepared by me (or under my
supervision) in accordance with the provisions of the City of
College Station Drainage Policy and Design Standards for the
owners thereof.
~·1· Reg1stere Pro essiona Engineer
State of Texas No . 83252