CASE NO. ?3 -03
DA TE SUBMITIED ~-/ Q-Q 3
(Wolf Pen Creek, University Drive Corridor, and Northgate)
MINIMUM SUBMllTAL REQUIREMENTS
@' $200 Special District review fee. §: $200 Site plan application and review fee.
~ $200 Development permit fee.
fr. '.". .$600 Public Infrastructure Inspection Fee if applicable. (This fee is payable if construction of a public
watertine, sewer line, sidewalk, street or drainage facilities is involved.) N.~,
(5) folded copies of site plan.
Ten (10) folded copies of building elevations (including signage) with dimensions.
Color and material samples.
A copy of the attached site plan checklist with all items checked off or a brief explanation as to why they are not
checked off.
NAMEOFPROJECT Acts Couocil of Brazos Vo.\\':j
ADDREssiote.CS~i~~ o.f ~<~~h~d (' s~
LEGAL DESCRIPTION L; ye Lo ;; Y-\< =~\'on Ph°'se.1I
APPLICANT (Primary Contact for the Project):
Name IDo. \e B (OW oe.) J(.) P. E. E-Mail °' be...\@\1<.C'j't:>e.c. com
street Address 5 05 Un\\/er5it'.::3 D<\ve.. Ea.n+1 Su.i+e. 803
City Co l \~ S to. i-( on State T -€.)(fl. S Zlp Code I 7 8 40
Phone Number _~.. (ql~) 6lf{o-(o9\~ Fax Number (C\19) 8"\Co-89 \l\-
PROPERTY OWNER'S INFORMATION· .
Name De. 8 DO\\)\d Rome i E-Mail rome.\@foroe.i.com
Street Address asc \ TQ~S f\\JfX)ll Q South
City C.o\\e<je Sto..\-\on state Tuq,s ZJpCode 17~'10
Phone Number (C\19) Co9(e-&z87 FaxNumber (91'1) loCOO-107'2
· ~OR ENGINEER'S INFORMATION:
Name Jim s l n ~I e+~n . ~ail Ji m@~a rch i te c±s . c OYYl
Street Address \<;:!QQ \Arn\/fX51 t-~~~ \:::,0.5±-Suite.. l DL\:
City C.o\\e~ D'rO:J\<:>o state_ _ ___ ZlpCode =z:z9 40
Phone Number ('\Jq) St.\ (p-5"] OQ Fax Number (9'19) 8 4 (o -5 701
OTHER CONTACTS (Please specify type of contact, i.e. project manager, potential buyer, loeal contact, etc.)
Name N/A I
E-Mail ____________ _
Street Address _____________________________ ~
City ___________ State ______ _ ZlpCode ________ _
Phone Number----------Fax Number _____________ _
SITE PLAN APPLICATION l of3
Special District Site Plan.doc 10121/02
CURRENTZONING _---2WLl.L.P~C~----------------
PRESENTUSE OF PROPERTY _)!v~~~c~o.un_Ll,.c.~~'4----------------
PROPOSEDUSEOFPROPERTYit\-\...!..\+...!___s<Oco.~\~\ex-'-£1-~!I.{------------~
VARIANCE(S) REQUESTED AND REASON(S) _i_:N~o~n..s;.e _____________ _
#OF PARKING SPACES REQUIRED __ 4~'0 ___ # OF PARKING SPACES PROVIDED _4..:....9_,__ __
MULTl-FAMIL Y RESIDENTIAL
Total Acreage __
Floodplain Acreage __
Housing Units __
#of 1 Bedroom Units
#of 2 Bedroom Units
#of 3 Bedroom Units
__ #of 4 Bedroom Units
FOR2 BEDROOM UNITS ONLY
__ # Bedrooms = 132 sq. ft.
__ #Bedrooms < 132 sq. ft.
PARKLAND DEDICATION
#of Multi-Family Dwelling Units
x $452 = $
__ #of acres in floodplain
# of acres in detention
__ #of acres in greenways
__ date dedication approved by Parks Board
COMMERCIAL
Total Acreage: \ • 3 S 4'
Building Square Feet: t-/-S d. S ~ 5 F
Floodplain Acreage: None.
NOTE: Parkland Dedication fee is due prior to the issuance of a Building Permit
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached
hereto are true and correct.
Date7
SITE PLAN CHECKLIST
Special District Site Plan.doc I 0/21/02 2 of3
SUPPLEMENTAL DEVELOPMENT PERMIT INFORMATION
Application is hereby made for the following development specific site/waterway alterations:
ACKNOWLEDGMENTS:
I, __ , design engineeGereby acknowledge or affirm that:
The information and conclusions contained in the above plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage
Policy and Design Standards. As a condition of approval of this permit application, I agree to construct the
improvements proposed in this application according to these documents and the requirements of Chapter 13
of the College Station City Code.
~
Property Owner(s) Contractor
CERTIFICATIONS: (for proposed alterations within designated flood hazard areas.)
A. I, __ certify that any nonresidential structure on or proposed to be on this site as part of this application
is designated to prevent damage to the structure or its contents as a result of flooding from the 100 year storm.
Engineer Date
B. I, __ certify that the finished floor elevation of the lowest floor, including any basement, of any
residential structure, proposed as part of this application is at or above the base flood elevation established in
the latest Federal Insurance Administration Flood Hazard Study and maps, as amended.
Engineer Date
C. I, __ , certify that the alterations or development covered by this permit shall not diminish the flood-
carrying capacity of the waterway adjoining or crossing this permitted site and that such alterations or
development are consistent with requirements of the City of College Station City Code, Chapter 13 concerning
encroachments of floodways and of floodway fringes.
Engineer Date
D. I, __ , do certify that the proposed alterations do not raise the level of the 100 year flood above elevation
established in the latest Federal Insurance Administration Flood Hazard Study.
Engineer Date
Conditions or comments as part of approval:
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets,
or existing drainage facilities. All development shall be in accordance with the plans and specifications
submitted to and approved by the City Engineer for the above named project. All of the applicable codes and
ordinances of the City of College Station shall apply.
1-Aug-02 3 of 5
·.
~~
<:OLLLC.l STATION
1.
SUBMIT APPUCA TION AND THIS
UST CHECKED OFF WITH 10
FOLDED COPIES OF SITE PLAN FOR REVEW
SITE PLAN MINIMUM REQUIREMENTS
(ALL CITY ORDINANCES MUST BE MET)
INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
Sheet size -24• x 36" (minimum).
A key map (not necessarily to scale).
Title block to include:
Name, address, location, and legal description
Name, address, and telephone number of applicant
Name, address, and telephone number of developer/owner (if differs from applicant)
Name, address, and telephone number of architect/engineer (if differs from applicant)
Date of submittal
Total site area
North arrow.
Scale should be largest standard engineering scale possible on sheet
Ownership and current zoning of parcel and all abutting parcels.
Existing locations of the following on or adjacent to the subject site:
Streets and sidewalks (RO.W.).
Driveways (opposite and adjacent per Driveway Ordinance 1961).
Buildings.
Water courses.
Show all easements clearly designating as existing and type (utility, access, etc.).
100 yr. floodplain and floodway (if applicable) on or adjacent to the proposed project site, note if there is
none on the site.
Utilities (noting size and designate as existing) within or adjacent to the proposed site, including building
transformer locations, above ground and underground service connections to buildings, and drainage inlets.
Meter locations.
Topography (2' max or spot elevations) and other pertinent drainage Information. (If plan has too much
information, show drainage on separate sheet) ~/ 8. Proposed location, type and dimensions of the following.:
~p.. Phasing. Each phase must be able to stand alone to meet ordinance requirements. ~ ,,, The gross square footage of all buildings and structures and the proposed use of each. If different uses are
to be located in a single building, show the location and size of the uses within the building. Building
separation is a minimum of 15 feet w/o additional fire protection.
Setbacks. Show building setbacks as outlined in Ordinance 1638 Zoning Ordinance,
(Section 7, Table A).
Off-Street parking areas with parking spaces drawn, tabulated, and dimensioned. Minimum parking space
is 9' x 20', or on a perimeter row 9' x 18' with a 2' overhang. Designate number of parking spaces required
by ordinance and provided by proposal.
Handicap parking spaces.
SITE PLAN CHECKLIST 4 of3
Special District Site Plan.doc l 0/21/02
NOTE:
~ Parking Island~. Raised landscape islands, (6" raised curb) a minimum of 180 sq. ft. are required at both
ends of every parking row (greenspace area contiguous to the end island maybe applied toward the
required 180 sq. ft.). Additionally, 180 sq. ft. of landscaping for every 15 interior parking spaces must be
provided. All required islands must be landscaped or set with decorative pavers, or stamped dyed concrete
or other decorative materials as approved.
Drives. Minimum drive aisle width is 23' with head-in parking or 20' without parking.
Curb cuts. For each proposed curb cut (including driveways, streets, alleys, etc.) locate existing curb cuts
on the same opposite side of the street to detennine separation distances between existing and proposed
curb cuts. Indicate driveway throat length as measured in the Driveway Ordinance. (See Ordinance 1961
for driveway location and design requirements.)
Security gates (show swing path and design specs with colors).
Sidewalks (both public and private). Sidewalks are required at time of development if property has frontage
on a street shown on the Sidewalk Master Plan or if the review staff determines the necessity. (Refer to
Section 10.2 of the Zoning Ordinance). -B-/ Medians. Show any and all traffic medians to be constructed on site.
[§"' Landscape Reserve. A twenty four foot setback from RO.W. to curb of parking lot is required. Pavement
may encroach into this 24' reserve by up to 1134 square feet if streetscape requirement can still be met In
no case may the pavement be less than 6' from the property line.
Common open spaces sites
Loading docks
Detention ponds
Guardrails
Retaining walls
All required and other types of fences (a 6' privacy fence is required between industriaVcommercial and
residential developments as well as between multi-family and single family developments).
Sites for solid waste containers with screening. Locations of dumpsters are accessible but not visible from
streets or residential areas. Gates are discouraged and visual screening is required. (Minimum 12 x 12 pad
required.)
Show all easements clearty designating as proposed and type (utility, access, etc.). tf dedicated by
separate instrument list by volume and page.
Utilities (noting size and designate as proposed) within or adjacent to the proposed site, including building
transformer locations, above ground and underground service connections to buildings.
Meter locations (must be located in public R.0.W. or public utility easement.).
Proposed grading (1' max for proposed or spot elevations) and other pertinent drainage information. (If plan
has too much information, show drainage on separate sheet)
Show proposed and existing fire hydrants. Fire hydrants must be located on the same side of a major
street as a project, and shall be In a location approved by the City Engineer. Any structure in any zoning
district other than R-1, R-1A, or R-2 must be within 300 feet of a fire hydrant as measured along a public
street. highway or designated fire lane.
Show fire department connections. FDC's should be within 150' of the fire hydrant. In no case shall they be
any further than 300' apart, and they shall be accessible from the parking lot without being blocked by
parked cars or a structure.
Show fire lanes. Fire lanes a minimum of 20 feet in width with a minimum height clearance of 14 feet must
be established if any portion of the proposed structure is more than 150 feet from the curb line or pavement
edge of a public street or highway.
I
' I ,,_
9.
10.
Fire hydrants must be operable and accepted by the City, and drives must have an all weather
surface as defined in the Zoning Ordinance Section 9 before a building permit can be issued.
Will building be sprinkled? Yes 0 No ri
If the decision to sprinkle Is made after the site plan has been fPproved, then the plan must be resubmitted.
Wheelstops may be required when cars overhang onto property not owned by the applicant or
where there may be conflict with handicap accessible routes or above ground utilities, signs or other
conflicts.
Show curb and pavement detail. A 6" raised curb Is required around all edges of all parts of all paved areas
without exception. (To include island, planting areas, access ways, dumpster locations, utility pads, etc.)
Curb details may be found in the Zoning Ordinance Section 9 and alternatives to those standards must be
SITE PLAN APPLlCATION 5 of 3
Special District Site Plan.doc 10/21102
0
0
0
0
0
0
0
0
0
~13.
~ 14.
~ 15.
gl 16.
fl NA-11.
718.
CJ 19.
~20.
approved by the City Engineer. No exception will be made for areas designated as •reserved for future
parking".
Landscape plans as required in Section 11 of the Zoning Ordinance (See Ordinance# 1638.) The landscaping
-plan can be shown on a separate sheet if too much information is on the original site plan. If requesting
protected tree points, then those trees need to be shown appropriately barricaded on the landscape plan.
Attempt to reduce or eliminate plantings in easements. Include information on the plans such as:
required point calculations
additional streetscape points required. Streetscape compliance is required on all streets larger than a
residential street
calculations for# of street trees required and proposed (proposed street tree points will accrue toward total
landscaping points.)
proposed new plantings with points earned
proposed locations of new plantings
screening of parking lots
screening of dumpsters, detention ponds, transformers, NC units, loading docks, propane tanks, utility
demarcation point on buildings, or other areas potentially visually offensive.
existing landscaping to remain
show existing trees to be barricaded and barricade plan. Protected points will only be awarded
if barricades are up before the first development permit is issued.
Show irrigation system plan. (or provide note on how Irrigation system requirement will be met prior to
issuance of C.O.) All plans must include irrigation systems for landscaping. Irrigation meters are separate
from the regular water systems for buildings and will be sized by city according to irrigation deman submitted
by applicant and must include backflow prevention protection.
Is there any landscaping in TxDOT R.O.W. ? Yes
If yes, then TxDOT permit must be submitted.
Will there be any utilities in TxDOT RO.W. ? Yes
If yes, then TxDOT permit must be submitted.
Will there be access from a TxDOT RO.W. ? Yes
If yes, then TxDOT permit must be submitted.
0
0
0
No~
No~
No cg/
The total number of multi-family buildings and units to be constructed on the proposed project
site.
The density of dwelling units per acre of the proposed project.
Provide a water and sanitary sewer legend to include water demands (minimum, maximum and
average demands in gallons per minute) and sewer loadings (maximum demands in gallons per
day).
Are there impact fees associated with this development? Yes 0 No~
NOTE: Signs are to be permitted separately.
SITE PLAN APPLICATION 6 of3
Special District Site Plan.doc 10!21102
DEVELOPMENT PERMIT
PERMIT NO. 03-03 ~-~ Project: ARTS COUNCIL OF THE BRAZOS VALLEY
COlllGl STATION FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Eastmark Subdivision Phase 11
Lot 1R
Block H
DATE OF ISSUE: 04/01/03
OWNER:
Arts Council of the Brazos Valley
c/o P. David Romei
2501 Texas Avenue South
College Station, Texas 77840
TYPE OF DEVELOPMENT:
SPECIAL CONDITIONS:
SITE ADDRESS:
2275 Dartmouth Drive
DRAINAGE BASIN:
Wolf Pen Creek
VALID FOR 9 MONTHS
CONTRACTOR:
Full Development Permit
All construction must be in compliance with the approved construction plans
All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not
count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter.
Erosion control per the approved plans must be in place for duration of the project.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate
construction site in accordance with the approved erosion control plan as well as the City of College Station
Drainage Policy and Design Criteria. If it is determined the prescribed erosion control measures are ineffective
to retain all sediment onsite, it is the contractors responsibility to implement measures that will meet City, State
and Federal requirements. The Owner and/or Contractor shall assure that all disturbed areas are sodden and
establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion
control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original
condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to
adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion,
siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced
before any operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets,
or existing drainage facilities.
I hereby grant this permit for development of an area outsiqe the special flood hazard area. All development
shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the
development permit application for the above named projec;;t and all of the codes and ordinances of the City of
Coll e Station that apply. ,.
Date I 1
o1J(tl/o ~
Date
ASH 8t BROWNE EIYGl!YEERIJYG, l!YC.
Engineers and Consultants
P.O. Box 10838, College Station, Texas 77842
979-846-6914 877-245-4839 Fax: 979-846-8914
April 28, 2003
Carol Cotter
Graduate Engineer
City of College Station
P.O. Box 9960
College Station, Texas 77842
Re.: Water Meter Size
Arts Council of Brazos Valley
ABEi No. 1003001
Dear Carol :
VIEWED FOR nuo1 1 a tJr,e
APR 2 8 2003
OLLt:Gt: ~•A HON
ENGINEERING
As per our conversation on Friday, this letter shall serve as the request for the installation
of a 1-1 /2" water meter for the above referenced project. Please find attached the
information that justifies the installation of a 1-1/2" water meter in lieu of the 3/4" water
meter as approved by the City for the above referenced project. This information was
obtained from the MEP engineer (i.e. Brazos Valley Engineering, Inc.). Based on the
fixture units in the building, the 2000 International Plumbing Code, ASPE and AWWA
standards, the meter should be a 1-1/2" meter.
If you have any questions or need any additional information, please do not hesitate to
call.
Sincerely,
Attachments
,,,,,,, ---~E OF r.~ \\ ..... ~~ •••••••••• .;¥ .:!,,
":;1,··· ····':'I~ I "" .•· •••• I "*/A_,l.-•.ttli. , * . .,."() . 2".v. ;> • ..,. ~· .. :. ·········· ... ·······""·· :~. ~ J..,J. DALE BROWNE, JR. ~ ~ ·:·····························ill' I-<>'· 81 : "' ·.~·· A 890 -~~6' o·. rr, <> "v, 1t~"~G/STE~~···~~ ,,~sio"····ii~G~
\'' NAL --'""'-
\\Abei#6\0FFIC8Pmjects\1003 -Jim Singleton Architects\001 -ACBV Site Oesignlletters\COCS -Cottel1>1 -Letter.wpd
9796936946 PAGE 01
FAX TRANSMISSION
Brazos Valley :Engineering, Inc.
StnJchn/•M«hanical•EJectrical"' TAB
3209 Earl Rudder Freeway South, Suite 200 • College Station, TX 77845-6011
Phone: (979) 693-2835 www.bvei.com Fax : (979) 693-6946
To: Dale @ Ash & Browne Engineering Date: April 25, 2003
Fu #: 846-8914 Pages: S, incl this cover
From: Sarah Johnson sheet.
Subject: Ans Center Water Meter Cale. Document#: C0710102-0l 1
COMMENTS:
On the attGhed pages I have shown the calculations done to obtain the meter size for the Arts Council
Center. Per these cllcs, the meter needs to be 1-1/2". The total fixture units for the water supply is 91 .
Using Table .E102 from Appendix E of the 2000 International Plumbing Code, it was determined that 91
fixture units have a demand of approximately 64.5 gpm. We then used that gpm to determine the water
meter size. On Table 3-1 of the ASPE Data Book, you will find that at the n:commended desing criteria
of800/o ofrnaximum capacity, the smallest meter that will meet our demand of 64.5 gpm is the 1-1/2''.
This meter is also the only meter that will work based on the maximum capacity for the A WW A flow
criteria. This is why on our Water Supply Cale we specified that a 1-l /2" meter is necessary. I hope
this clears up any confusion regarding our meter sizing. If you have any funher questions. please let me
know.
Sarah
~4/2~/2003 05:05
•. APPENDIX a
979693694& PAGE 02
TAall1GI TABLE FOR EITIMATING DEMAND
llUPPLY w•-·---··· ':t r"\,JR fUHIH r "''"'·• .,..,.LY SYSTEMS ....aDOM!NANTLY FOR FlUSH VALVES
'--OetMnd Laid Defflllnd """'....., CW--ltiPlllJ (Cubic f .. t pt!' mlnutt) ....... unlll) ~,., ,,.,_, (Culllo fllt Pll' mlnlM> fllllur• un .. ) (Galfone "' mlnut•)
I lO 0.04104
2 s.o 0.0684
) 6.S 0.86892
4 8.0 1.06944
s 9.4 l.256592 s IS.O 2.0052
6 10.7 1.430376 6 17.4 2.326032
7 t 1.8 1.577424 7 19.8 2.646364
a 12.1 l .711104 8 22.2 2.967696
9 13.7 1.831416 9 24.6 3.188S28
10 14.6 J.9S1728 10 ].7.0 3.60936
11 IS.4 2.058672 11 17.8 3.716304
12 16.0 2.13888 12 28.6 3.823248
13 16 . .S 2.20572 13 29.4 3.930192
14 17.0 2.272S6 14 30.2 4.037136
IS 17.S 2.33~ IS 31.0 4.14408
16 18.0 2.90614 16 31 .8 4.141024
17 l&.4 2.459712 17 32.6 4.357968
18 18.8 2.Slll84 18 33.4 4.464912
19 19.2 2.S666S6 19 34.2 4.5711156
20 19.6 2.620128 20 lS.O 4.6788
lS 21.S 2.87412 25 38.0 S.079114
30 23.J 3.114744 JO 42.0 S.61356
3S 24.9 3.328632 3S 44.0 S.88192
40 16.3 3.Sl.5784 40 46.0 6.1492S
4S 27.7 3.70l936 45 48.0 6.41664
so 29.1 3.890018 so so.o 6.684
60 32.0 4.27776 60 S4.0 7.2187~
70 35.0 4.6788 70 58.0 7.7S344
80 38.0 S.0798' _..IL.. ~ 8.1111216
90 41.0 H8088 ,,-90, 8 . .59562.i
100 43.S S.81S08 .... loo..' ~ 9.0234
110 48.0 6.41664 l?O 9.75864
140 s2.s 7.0182 140 77.0 10.29336
160 '7.0 7.61976 160 81.0 10.82808
180 61.0 8.IS448 180 85..S 11.42964
200 6.5.0 8.6892 200 90.0 12.0312
ns 70.0 9.3S76 22S 95.S 12.76644
2SO 75.0 t0.0l60 2SO 101.0 13.S0168
275 80.0 10.6944 27' 104 . .5 11.96956
300 8S.O 11 .3628 300 108.0 14.43744
400 IOS.O 14.0364 400 127.0 16.97736 soo 124.0 16.57632 soo 143.0 llJ.11624
750 170.0 22.7256 7SO 177.0 23.661 )6
1.000 208.0 27.10544 1,000 208.0 27.80544
1.2'0 239.0 31.94952 l,2SO 239.0 31.94952
J.500 269.0 35.95992 l.SOO 269.0 35.9.5992
1.7.SO 297.0 39.70296 1.7SO 297.0 39.70296
(C11rc1iJ11udJ
2000 INTERNATIONAL PLUMBINO cooEe
~4/L~IL~~~ ~~=~~ 97%936946 PAGE 03 3·2 Slat ha. Cold Water s,...1 TaWe 3-1. Dllpla-.tllt•TJpe Mttan MHdas AWWA Spedfk8dons Flow-Prmure Lola A•••.-Reco111mended for ··~o.tp Colldauoa1 Flow-Masl11111111 c.,.dty Crtt.t.-M hr CeM 31 Pa Cent or AW'WA Plow Crllerla ot Maximum Capadty Maximum Capacit ,.. .,,. ptl -pti Ir ands or Mettn A•P· ~·% 10.4 16 6.1 6.0 1.0 6 % I +1~ 2 J Size ... 2 J 4 6 8 10.6 24 6.9 9.0 I.OS 9.3 40 6.3 16.5 1.0 11.3 80 8.6 30.0 0.9 10.4 121 6.~ 38.0 0.5 13.1 240 8.3 90.0 ' I.I .. TypeMlten AWWA Spedfkatlom Flow•P,_,. Lcm AYen&tl Recoat••ded for Reeomm_.td D ... • Conllfttlom Flo•-Mu...._ C.,.tty Crft ... -H Per C•t 51 P• Ccat of AW'WA Flow Crlltria ' olM.xlmum C•l'•itJ Ma1bw1U11 CapedtJ -... ...... "' -pti 160 9.2 128 6.1 80 2.6 310 U.4 2'0 8.9 160 4.2 500 9.6 400 6.3 2'0 J.S 1,000 9.4 800 S.8 SOO 2.5 uoo 12.0 1,280 7.8 800 4.0 ~ 3-3. 1WWM-Tne Maten Me.tins AWWA SpedftcadoM Flow-PnMure1-A•erq• Rec:o-Hdtcl for ReeommendedD....... C........__Flow-Mas..._ c.,.dty Crtt.ta-U Per Cmt !O Per Cent of 6 6 6 6 3 Brandl of Met en A•&t· 3 s s 4 l Sire AWWA Flew Crtt..-of Madftlum CapadtJ Ma:idnnna Capacity ..... of M1trn A•p. ... -,.. """ ... .... ... 2 160 4.S 128 2.8 80 1.0 .5 4 4 4 l l.SO 4.6 210 3.0 17S 1.2 4 600 J.5 .so 2.1 300 0.8 6 1.1'0 .J.5 1,000 2.0 62' 0. 7 t. TypeaflwdWngai< .... .,,-y. 2. MinUnmn ad .Umana demllld. 3. Wu:rpnuna.ailablo. 4. sueo1w1c1m, .,..., '· ~ Wl.e ..... md clev8don lollea. 6. Mew COii&. 1. MUn--.ce COlll. Tbeft>llDMqllblesfnm A.WW AStlPdlrdM22are reprinted • nli'cml 11ftdclhee far 'nlCI' mc11:n. SIZING THE WATEll LINE la snc*llY Ill~...., C8ll be repnled • • ~ftlddllld.far ............. a&IPIJIOlimardy UllOlllplleric tenlpelltare, it ii CUltOmlrY '° UIDllle lMl waierbuamitanndeftlityof61.4lbaJcubicfoot(1 Q.IL), whichholds noarlyconstantthn>u1houa atemprnurenn~ ol 32 to a (0.co 1,-'C), Par ~·.....,. involYina w11er healing sysrems such• boilcr..fccdpumpdbdlaqebeads.jtis ncccmry ID Me into ICCOUM lhe chlnte iG deaaity, vapar peuute lftd viacosily widl ~ Applicldon of die common empirical equaUonJ for Wlltr flow is limited fD WMU at mual allftOlllheric ~ in lhe 32 10 lOOP (0 to 37.8C) rln&e. At IUaher tcmpcna.wcs. lhc cha1ca in den· lily a Yilcality lave a ClOnlldaable ~ng on flow nUdonl ... whcRKCUDIC n:aullS 11C clesiml, lbc use of lhe common empirical fonnulle is not ftlCommended.
PAGE 04
WATER SUPPLY CALCULATION
STA TIC PRESSURE: 50 psi
t!t:~R: 91
64.5 , l-172;
f
50 psi PRESSURE IN MAIN
6 .Psi LOSS THRU METER
1.6 psi LOSS THRU TAP
25 psi FIXTURE LOSS AT END --psi LOSS THRU BACKFLOW PREVENTER
6.45 2si STA TIC HEAD LOSS
10.95 psi AVAILABLE PRESSURE
PIPE LENGTH {TAP TO METER) 50 ft
PIPE LENGTH 200 ft
VERTICAL LENGTH 15 ft
EQUIVALENT LENGTH QF FITTINGS 28 ft
TOTAL DEVELOPED LENGTH 293 ft
MAX. ALLOWABLE LOSS = PRESSURE AVAILABLE: 10.95 psi x 100 -3. 74 psi
(PER 100 ft OF PIPE) TOT Al LENGTH = 293 ft
STAFF REVIEW COMMENTS NO. 1
Project: DP-ARTS COUNCIL OF BRAZOS COUNTY-DEVELOPMENT PERMIT( 03-
00100003)
ENGINEERING
1. Please sign certification page.
2. An Erosion Control Plan will need to be submitted and approved prior to issuance of
Development Permit.
3. Runoff from property will need to be returned to sheet flow, or conveyed to the
street.
4. Please clarify the number of weirs/curb outlets and their locations in the report. Site
Plan shows 4 weirs. No values are shown for Weir D in the Drainage Report.
5. Site/Grading Plan shows drainage from property to Colgate and Dartmouth. Are
these accounted for in Drainage Report?
Reviewed by: Carol Cotter Date: January 24 , 2003
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Staff Review Comments Page 2 of 4
DRAINAGE REPORT
FOR
ARTS COUNCIL OF BRAZOS VALLEY
College Station, Texas
PREPARED FOR:
Dr. P. David Romei
Executive Director
Arts Council of Brazos Valley
2501 Texas Avenue South
College Station, Texas 77840
PREPARED BY:
ASH & BROWNE ENGINEERING, INC.
P.O. Box 10838
College Station, Texas 77842
January 2003
ABEi No. 1003001
C COPYRIGHT 2002, Ash & Browne, Engineering, Inc.
TABLE OF CONTENTS
GENERAL LOCATION AND DESCRIPTION
Location ............................................................. 1
Description of Property ................................................. 1
Proposed Improvements ................................................ 1
DRAINAGE BASINS AND SUB-BASINS
Primary and Secondary Basin Description .................................. 1
DRAINAGE DESIGN CRITERIA
Regulations .......................................................... 1
Development Criteria Reference and Constraints ............................. 1
HYDROLOGICAL CRITERIA
Runoff Calculation Method .............................................. 2
Hydraulic Criteria ...................................................... 2
Detention and Storage Calculation Method .................................. 3
DRAINAGE FACILITY DESIGN
General Concept ...................................................... 3
· Table 1.1
Runoff Quantities
Existing Conditions and Developed Conditions without Detention
Table 1.2
Runoff Quantities for
Existing Conditions and Developed Conditions with Detention
CONCLUSION
Compliance with City Standards .......................................... 4
Effectiveness of Drainage Design ......................................... 4
Explanation of the Effectiveness of
Existing and Proposed Improvements ................................. 4
FIGURE #1
LOCATION MAP
FIGURE #2
EXISTING DRAINAGE CONDITIONS
FIGURE #3
PROPOSED DRAINAGE CONDITIONS
FIGURE #4
STAGE STORAGE CURVE
FIGURE #6
2-YEAR STORM EVENT HYDROGRAPHS
FIGURE #7
5-YEAR STORM EVENT HYDROGRAPHS
FIGURE #8
10-YEAR STORM EVENT HYDROGRAPHS
FIGURE #10
50-YEAR STORM EVENT HYDROGRAPHS
FIGURE #11
100-YEAR STORM EVENT HYDROGRAPHS
ATIACHMENT #1
CALCULATIONS
CERTIFICATION
"I, J. Dale Browne, Jr, certify that this report for the drainage design of site plan for the Arts
Council of Brazos Valley was prepared by me in accordance with the provisions of the City of
College Station Drainage Policy and Design Standards for the owners thereof."
Licensed Professional Engineer
State of Texas No. 81890
Drainage Report January 2003
Arts Council of Brazos Valley
DRAINAGE REPORT
GENERAL LOCATION AND DESCRIPTION
Location
The proposed site consists of lots 1 through 6 of Block H of the Eastmark Subdivision, Phase 11
in the City of College Station. The property is located at the northeast comer of the intersection
of Dartmouth Avenue and Colgate Circle. Refer to Figure #1 for the project Location Map.
The nearest primary drainage-way, Wolf Pen Creek, is located approximately 1, 150 feet to the
north. The property is located in the unshaded Flood Zones "X" as shown on FIRM (Flood
Insurance Rate Map) map, Map Number: 48041C0144 C, effective date of July 2, 1992.
Description of Property
The site contains 1.35 acres of land covered with native grasses and trees. Currently, the
property is undeveloped. There are no primary or secondary drainage-ways located within the
site. Stormwater is conveyed over the site from the southwest to the northeast. The runoff sheet
flows to the adjacent property located to the north. Once the runoff is on the adjacent properties,
the water is conveyed to Wolf Pen Creek.
Proposed Improvements
The proposed project will involve the construction of a single story structure and associated
parking facilities. The drainage from this development will be captured in the parking lot and
released through curb outlets which will meter the discharge from the project site.
DRAINAGE BASINS AND SUB-BASINS
Primary and Secondary Basin Description
The property is located within the Carter Creek Drainage Basin as set forth in the City of College
Station -"Drainage Policy and Design Standards" (Policy). Figure #2 and #3 shows the
existing/proposed basins within the property and how the runoff is conyeyed off of the site.
DRAINAGE DESIGN CRITERIA
Regulations
No deviations were taken from the City's Policy when this report was composed.
Development Criteria Reference and Constraints
No prior reports or investigations were reviewed as part of this report. Since no other reports
1
Drainage Report January 2003
Arts Council of Brazos Valley
were reviewed or available, this report looks at the impact that the proposed development will
have on the adjacent property. Because a majority of the runoff from the site sheet flows onto the
adjacent property, the "Point of Study" was taken along the northern property line. After
development, the peak flow at this location will be kept near equal to or below the current
conditions.
The main constraint that effects the development is the lack of secondary drainage facilities near
the subject site. The lack of a subsurface drainage system within the area dictates that detention
of additional runoff is required to keep from impacting adjacent property owners. Therefore, a
majority of the runoff from the subject site will be transported to the parking lot which will be
utilized as a detention facility that will release the runoff at a controlled rate.
HYDROLOGICAL CRITERIA
Runoff Calculation Method
Runoff for all areas was calculated based on the "Rational Method". The runoff coefficients of
0.35 and 0.90 were used for pervious areas (i .e. grassy areas, landscaping, etc.) and impervious
areas (i.e. streets, structures, etc.), respectively. The composite runoff coefficient for the
proposed developed conditions was determined to be 0. 71 . Intensity was determined based on
the City of College Station Intensity Duration Frequency Curves and the calculated time of
concentration (with 10 minutes as a minimum) for each drainage area. The runoff for developed
condition with detention was determined with Hydraflow "Hydrographs V. 6.02", which is based
on the Rational Method. Refer to Attachment #1 for the time of concentration and runoff
calculations for predeveloped, developed, and developed with detention conditions .
Hydraulic Criteria
There will be no stormwater drainage facilities (i.e. stormsewer, street flow, etc.) as part of th is
development.
A computer program was used to determine the discharge rate of the curb outlets that will be used
to meter the flow out of the parking lot. The program calculates the discharge based on the weir
equation:
Where:
Q = C LHt 5
w
Q =Flow Rate (cfs)
Cw= Weir Coefficient (Used: 2.84)
L = Length of Weir (ft)
H = Distance between water surface and the crest.
Based on th is equation and the storage in the parking lot, the discharge rate of the four curb
outlets was determined. Refer to Attachment #1 -Calculations for the discharge ca lculations.
2
Drainage Report January 2003
Arts Council of Brazos Valley
Detention and Storage Calculation Method
Detention and storage facilities will be required for this development so that the adjacent property
is not impacted by the increase in storm water runoff. The size of the detention facility was
determined with Hydraflow software program "Hydrographs V. 6.02". The size of the proposed
detention facility was determined based on the storage and discharge characteristics of the
proposed detention facility. Refer to Figures #4 and #5 for the stage storage curve and stage
discharge curves, respectively. Refer to Figures #6 through #11 for the hydrograph curves for
all site conditions. Refer to Attachment #1 for the hydrograph data that was used to generate the
graphs.
DRAINAGE FACILITY DESIGN
General Concept
The existing site all drains to a point on the north property line where it is discharged onto the
adjacent property. Due to the lack of any secondary drainage facilities with or adjacent to the
project site, the stormwater runoff from the site after development must also be discharged from
the site at the same location.
Under present conditions, all runoff from the site sheet flows to the adjacent property. After
development the increase in runoff would be significant. The following table illustrates the impact
the proposed development will have on the adjacent property if detention is not provided.
Table 1.1
Runoff Quantities
Existing Conditions and Developed Conditions without Detention
Existing Runoff Proposed Runoff lncrease/(Decrease)
(cfs) (cfs) (cfs)
Storm Frequency (yr) Storm Frequency (yr) Storm Frequency (yr)
2 I 5 I 1 o I 25 I 50 I 1 oo 2 I 5 I 1 o I 25 I 50 I 1 oo 2 I 5 I 1 o I 25 I 50 I 1 oo
I 2.99 I 3.63 I 4.08 I 4.66 I 5.27 I 5.so I 6.06 I 7.37 I 8.28 I 9.45 I 10.69111.16 I 3.07 I 3.74 I 4.20 I 4.79 I 5.42 I 5.661
Based on the above information, a detention facility is required. The following table shows the
3
Drainage Report January 2003
Arts Council of Brazos Valley
runoff at the Point of Study after the runoff from the development is routed through the proposed
detention facilities (i.e. parking lot):
Table 1.2
Runoff Quantities for
Existing Conditions and Developed Conditions with Detention
Existing Runoff Proposed Runoff lncrease/(Decrease)
(cfs) (cfs) (cfs)
Storm Frequency (yr) Storm Frequency (yr) Storm Frequency (yr)
2 I 5 I 1 o I 25 I 50 I 1 oo 2 I 5 I 1 o I 25 I 50 I 1 oo 2 I 5 I 1 o I 25 I 50 l 1 oo
I 2.99 I 3.63 I 4.08 I 4.66 I 5.27 I 5.5o I 3.01 I 3.49 I 3.78 I 4.17 I 5.26 I 5.74 I 0.02 I (0.14) I (0.30) I (0.49) I (0.01i I 0.24 I
As can be seen from the above table, the proposed development with the detention facility will
decrease the amount of runoff that is currently being discharged at the Point of Study.
CONCLUSION
Compliance with City Standards
From the information that is presented in this report, we have shown that the development of this
site will meet the City's policy.
Effectiveness of Drainage Design
The proposed drainage plan shows how the stormwater will be conveyed onto the adjacent
property. The use of the parking lot as a detention facility for the development will help control
runoff being discharged onto the adjacent property.
Explanation of the Effectiveness of
Existing and Proposed Improvements
The use of the parking lot as the detention facility for this project allows the increase in runoff to
be detained on site so that the discharge off of the site is near equal to or less and existing
undeveloped conditions. Upon review of the design calculations, the detention facilities will be
capable of handling all storm events from a 2-year storm to a 100-year storm.
4
Drainage Report January 2003
Arts Council of Brazos Valley
FIGURES
SCALE: 1• a:: 400'
0 100' 200' 400'
1003001-001-01
ARTS COUNCIL
OF BRAZOS VALLEY
FIGURE #1
LOCATION MAP
fl.SH lit BROWJYE EJYGJJYEERIJYCJ, me.
Engineers and Consultants
P.O. Box I 0838, College Station, Texas 77842
979-84~914 877-245-4839 Fax: 979-846-8914
303.40
303.20
_303.00
~ -c
0
+: 302 .80 co > Q)
w 302 .60
302.40
302 .20
ARTS COUNCIL OF BRAZOS VALLEY
Figure #4 -Stage Storage Curve
~ .-----.-----------~ ......
~
~ ~
/ /
---
/ r
0
0 2,000 4 ,000 6,000 8,000
Storage (cf)
_____.
10,000
303.40
303.20
_303.00
~ -c
0
+:i 302.80 co > <U
w 302.60
302.40
302.20
0
0
ARTS COUNCIL OF BRAZOS VALLEY
Figure #5 -Stage Discharge Curve
------------:...----------J
J
J
I r
10 20 30 40
Discharge ( cfs)
---___.
50 60
-~ (.) -cu -m
0::
:= 0
u..
10
8
6
4
2
0
ARTS COUNCIL OF BRAZOS VALLEY
Figure #6 -2-Year Storm Event
+-+ + +--+-+ r + -+-+
+ -+-+ + + +
I
10 20 30 40
Time (min .)
-Existing Conditions -Developed Conditions -Developed Conditions w/Detention
j
50
-~
ARTS COUNCIL OF BRAZOS VALLEY
Figure #7 -5-Year Storm Event
+ ~
~ 6 -+--~~~-----t-~---~~~r---~~~~-;-~~~~--+-~~~~--t
Q.) ..... ro
0:::
~ 4 -r-~---~-+-~~--.-+--~~~-t---~~~+--~~--i
0
LL
0
-Existing Conditions
10 20 30 40 50
Time (min.)
-Developed Conditions -Developed Conditions w/Detention
-J!2 (.) -Q) ..... ro
0::
~ 0
Ll..
10
8
6
4
2
0
ARTS COUNCIL OF BRAZOS VALLEY
Figure #8 -10-Year Storm Event
--. --1 I -+ --+----+ --·----------+ + ~ -+-
I
--+ --1-----t t-I r + -+ + +-1---+--+ +
I
I
+ + ~ 1
+ + t + +-... +
10 20 30 40
Time (min .)
-Existing Conditions -Developed Conditions -Developed Conditions w/Detention
50
ARTS COUNCIL OF BRAZOS VALLEY
Figure #9 -25-Year Storm Event
10 ~~~~~~~~~~~~~~~~~~~
-1 l · , + -r · ~ ~
8 -+-~___,__.__~-r-~l ~I -+-~~~~~
...-t +. + +"--~ -'+t ~ ~ 6 -t-~~-----,r--~~~-t-~~~~-t-~~~~r--~~_._I __,
Q.) ....... co + -+ +-.... + .... .... -+ -l-c:::
~ 4 -+---:t-~~~-=~~~~-=--+-~_!__~--+~~-"---r--l
0
LL
t
0 ~~~~'-----1f----~---'--~-+-~~~-"---+-~~~---1f----~---'--~-1
0 10 20 30 40 50
Time (min .)
-Existing Conditions -Developed Conditions -Developed Conditions w/Detention
-.. ~ (,) -(1) ..... co 0::
~ 0
LL
12
10
8
6
4
2
0
ARTS COUNCIL OF BRAZOS VALLEY
Figure #10 -50-Year Storm Event
+ +-~ t + + -t-+ + ~ ~ ~ +
10 20 30 40
Time (min .)
-Existing Conditions -Developed Conditions -Developed Conditions w/Detention
50
-~ (.) -Q) ...... ro
0::
~ 0
LL
12
10
8
6
4
2
0
0
ARTS COUNCIL OF BRAZOS VALLEY
Figure #11 -100-Year Storm Event
+ + -t +
+ ~ + t + + + ~
+
+
10 20 30 40
Time (min .)
+
~
-Existing Conditions -Developed Conditions -Developed Conditions w/Detention
f
50
Drainage Report
Arts Council of Brazos Valley
ATTACHMENT #1
CALCULATIONS
January 2003
Reservoir Report Page 1
English
Reservoir No. 1 -Parking Lot
Pond Data
Pond storage is based on known contour areas
Stage I Storage Table
Stage Elevation Contour area Iner. Storage Total storage
ft ft sqft cuft cuft
0.00 302.32 00 0 0
0.18 302.50 481 43 43
0.28 302.60 2,982 173 216
0.38 302.70 6,658 482 698
0.48 302.80 10,063 836 1,534
0.58 302.90 13,278 1,167 2,702
0.68 303.00 18,860 1,607 4,308
0.93 303.25 25 ,523 5,548 9,856
Culvert I Orifice Structures Weir Structures
[A] [B] [C] [D] [A] [B] [C] [D]
Rise in ·= 0.0 . 0.0 0.0 0.0 Crest Len ft = 2.25 0.75 144.50 0.00
Span in = 0.0 0.0 0.0 0.0 Crest El. ft = 302.32 302.50 303.00 0.00
No. Barrels = 0 0 0 0 Weir Coeff. = 2.84 2.84 2.80 0.00
Invert El. ft = 0.00 0.00 0.00 0.00 Eqn. Exp. = 1.50 1.50 1.50 0.00
Length ft = 0.0 0.0 0.0 0.0 Multi-Stage = No No No No
Slope% = 0.00 0.00 0.00 0.00
N-Value = .000 .000 .000 .000
Orif. Coeff. = 0.00 0.00 0.00 0.00
Multi-Stage ------No No No Tailwater Elevation = 0.00 ft
Note: All outflows have been analyzed under inlet and outlet control.
Stage I Storage I Discharge Table
Stage Storage Elevation ClvA Clv B ClvC ClvD WrA WrB WrC WrD Discharge
ft cuft ft cfs cf s cfs cfs cf s cf s cf s cf s cfs
0.00 0 302.32 0.00 0.00 0.00 0.00
0.18 43 302.50 0.49 0.00 0.00 0.49
0.28 216 302.60 0.95 0.07 0.00 1.01
0.38 698 302.70 1.50 0.19 0.00 1.69
0.48 1,534 302.80 2.12 0.35 0.00 2.47
0.58 2,702 302.90 2.82 0.54 0.00 3.36
0.68 4,308 303.00 3.58 0.75 0.00 4.34
0.93 9,856 303.25 5.73 1.38 50.58 57.69
Hydrograph Summary Report Page 1
Hyd. Hydrograph Peak Time Time to Volume Return Inflow Maximum Maximum Hydrograph
No. type flow interval peak period hyd(s) elevation storage description
(origin) (cfs) (min) (min) (cuft) (yrs) (ft) (cuft)
1 Rational 2.99 1 10 2,690 2 ------ECond.
2 Rational 6.06 1 10 5,458 2 ----PCond.
3 Reservoir 3.01 1 20 5,458 2 2 302.86 2,256 2to 3
..
Proj. file: Drainage. GPW IDF file: Brazos. !OF Run date: 12-23-2002
Hydrograph Report
Hyd. No. 1
ECond.
Hydrograph type
Storm frequency
Drainage area
Intensity
1-D-F Curve
= Rational
= 2 yrs
= 1.4 ac = 6.33 in
= Brazos.IDF
Hydrograph Discharge Table
Time --Outflow
(hrs cfs)
0.02 0.30
0.03 0.60
0.05 0.90
0.07 1.20
0.08 1.49
0.10 1.79
0.12 2.09
0.13 2.39
0.15 2.69
0.17 2.99 <<
0.18 2.84
0.20 2.69
0.22 2.54
0.23 2.39
0.25 2.24
0.27 2.09
0.28 1.94
0.30 1.79
0.32 1.64
0.33 1.49
0.35 1.35
0.37 1.20
0.38 1.05
0.40 0.90
0.42 0.75
0.43 0.60
0.45 0.45
0.47 0.30
... End
Peak discharge = 2. 99 cfs
Time interval = 1 min
Runoff coeff. = 0.35
Time of cone. (Tc)= 10 min
Reced. limb factor = 2
Page 1
English
Total Volume = 2,690 cuft
Hydrograph Report
Hyd. No. 2
PCond.
Hydrograph type
Storm frequency
Drainage area
Intensity
1-D-F Curve
= Rational
= 2 yrs
= 1.4 ac
= 6.33 in
= Brazos.IDF
Hydrograph Discharge Table
Time --Outflow
(hrs cfs)
0.02 0.61
0.03 1.21
0.05 1.82
0.07 2.43
0.08 3.03
0.10 3.64
0.12 4.24
0.13 4.85
0.1 5 5.46
0.17 6.06 «
0.18 5.76
0.20 5.46
0.22 5.15
0.23 4.85
0.25 4.55
0.27 4.24
0.28 3.94
0.30 3.64
0.32 3.34
0.33 3.03
0.35 2.73
0.37 2.43
0.38 2.12
0.40 1.82
0.42 1.52
0.43 1.21
0.45 0.91
0.47 0.61
... End
Peak discharge = 6.06 cfs
Time interval = 1 min
Runoff coeff. = 0.71
Time of cone. (Tc)= 10 min
Reced. limb factor = 2
Page 1
English
Total Volume= 5,458 cult
Hydrograph Report Page 1
English
Hyd. No. 3
2 to 3
Hydrograph type = Reservoir Peak discharge = 3.01 cfs
Storm frequency = 2 yrs Time interval = 1 min
Inflow hyd. No. = 2 Reservoir name = Parking Lot
Max. Elevation = 302.86 ft Max. Storage = 2,256 cuft
Storage Indication method used. Total Volume= 5,458 cuft
Hydrograph Discharge Table
Time Inflow Elevation ClvA Clv B ClvC ClvD WrA WrB WrC WrD Outflow
(hrs) cfs ft cfs cfs cfs cfs cfs cf s cfs cf s cfs
0.03 1.21 302.50 0.51 0.00 0.51
0.05 1.82 302.54 0.65 0.02 0.66
0.07 2.43 302.58 0.86 0.05 0.91
0.08 3.03 302.62 1.03 0.08 1.11
0.10 3.64 302.64 1.17 0.11 1.28
0.12 4.24 302.67 1.34 0.15 1.50
0.13 4.85 302.71 1.53 0.20 1.73
0.15 5.46 302.73 1.68 0.23 1.91
0.17 6.06 << 302.76 1.84 0.28 2.12
0.18 5.76 302.78 2.01 0.32 2.34
0.20 5.46 302.80 2.15 0.36 2.51
0.22 5.15 302.82 2.25 0.38 2.63
0.23 4.85 302.83 2.33 0.40 2.73
0.25 4.55 302.84 2.40 0.42 2.82
0.27 4.24 302.85 2.45 0.44 2.89
0.28 3.94 302.85 2.49 0.45 2.94
0.30 3.64 302.86 2.52 0.46 2.98
0.32 3.34 302.86 2.54 0.46 3.00
0.33 3.03 302.86 << 2.55 0.46 3.01 <<
0.35 2.73 302.86 2.54 0.46 3.01
0.37 2.43 302.86 2.53 0.46 2.99
0.38 2.12 302.86 2.50 0.45 2.96
0.40 1.82 302.85 2.47 0.44 2.91
0.42 1.52 302.84 2.43 0.43 2.86
0.43 1.21 302.84 2.37 0.42 2.79
0.45 0.91 302.83 2.31 0.40 2.71
0.47 0.61 302.82 2.25 0.38 2.63
0.48 0.30 302.81 2.17 0.36 2.54
0.50 0.00 302.79 2.08 0.34 2.42
0.52 0.00 302.78 1.97 0.31 2.28
0.53 0.00 302.76 1.87 0.28 2.15
0.55 0.00 302.75 1.77 0.26 2.03
0.57 0.00 302.73 1.69 0.24 1.92
0.58 0.00 302.72 1.60 0.22 1.82
0.60 0.00 302.71 1.53 0.20 1.73
0.62 0.00 302.69 1.43 0.17 1.60
Continues on next page ...
2to3 Page 2 Hydrograph Discharge Table Time Inflow Elevation ClvA ClvB ClvC Clv D WrA WrB WrC WrD Outflow (hrs) cfs ft cf s cf s cf s cf s cfs cfs cf s cf s cfs 0.63 0.00 302.67 ----·--------·------1.32 0.15 ----------1.47 0.65 0.00 302.65 ------------------·-1.22 0.13 --------1.35 0.67 0.00 302.64 --------------------1.13 0.11 ----------1.24 0.68 0.00 302.62 --------------------1.05 0.09 ----------1.14 0.70 0.00 302.61 -------------------0.98 0.07 ----------1.06 0.72 0.00 302.59 --------------------0.87 0.05 ----------0.93 0.73 0.00 302.56 ---------·---·-----·--0.73 0.03 --·-------0.76 0.75 0.00 302.53 --------------------0.62 0.01 ----------0.64 0.77 0.00 302.51 -------------------0.54 0.00 ----------0.54 0.78 0.00 302.47 -------------------0.37 ---------------0.37 0.80 0.00 302.40 -------------------0.16 -·-------·-----0.16 ... End
Hydrograph Summary Report Page 1
Hyd. Hydrograph Peak Time Time to Volume Return In ft ow Maximum Maximum Hydrograph
No. type now interval peak period hyd(s) elevation storage description
(origin) (cfs) (min) (min) (cuft) (yrs) (ft) (cuft)
1 Rational 3.63 1 10 3,271 5 ----ECond.
2 Rational 7.37 1 10 6,636 5 ---PCond.
3 Reservoir 3.49 1 21 6,636 5 2 302.91 2,918 2to3
..
Proj. file: Drainage.GPW IDF file: Brazos. !OF Run date: 12-23-2002
Hydrograph Report
Hyd. No. 1
ECond.
Hydrograph type
Storm frequency
Drainage area
Intensity
1-D-F Curve
= Rational
= 5 yrs
= 1.4 ac
= 7.69 in
= Brazos.IDF
Hydrograph Discharge Table
Time --Outflow
(min cfs)
1 0.36
2 0.73
3 1.09
4 1.45
5 1.82
6 2.18
7 2.54
8 2.91
9 3.27
10 3.63 <<
11 3.45
12 3.27
13 3.09
14 2.91
15 2.73
16 2.54
17 2.36
18 2.18
19 2.00
20 1.82
21 1.64
22 1.45
23 1.27
24 1.09
25 0.91
26 0.73
27 0.55
28 0.36
... End
Peak discharge = 3.63 cfs
Time interval = 1 min
Runoff coeff. = 0.35
Time of cone. (Tc)= 10 min
Reced. limb factor = 2
Page 1
English
Total Volume= 3,271 cuft
Hydrograph Report
Hyd. No. 2
PCond.
Hydrograph type
Storm frequency
Drainage area
Intensity
1-D-F Curve
= Rational
= 5 yrs
= 1.4 ac
= 7.69 in
= Brazos.IDF
Hydrograph Discharge Table
Time --Outflow
(min cfs)
1 0.74
2 1.47
3 2.21
4 2.95
5 3.69
6 4.42
7 5.16
8 5.90
9 6.64
10 7.37 <<
11 7.00
12 6.64
13 6.27
14 5.90
15 5.53
16 5.16
17 4.79
18 4.42
19 4.06
20 3.69
21 3.32
22 2.95
23 2.58
24 2.21
25 1.84
26 1.47
27 1.11
28 0.74
29 0.37
... End
Peak discharge = 7.37 cfs
Time interval = 1 min
Runoff coeff. = 0.71
Time of cone. {Tc)= 10 min
Reced. limb factor = 2
Page 1
English
Total Volume= 6,636 cuft
Hydrograph Report Page 1
English
Hyd. No. 3
2 to 3
Hydrograph type = Reservoir Peak discharge = 3.49 cfs
Storm frequency = 5 yrs Time interval = 1 min
Inflow hyd. No. = 2 Reservoir name = Parking Lot
Max. Elevation = 302.91 ft Max. Storage = 2,918 cuft
Storage Indication method used. Total Volume= 6,636 cuft
Hydrograph Discharge Table
Time Inflow Elevation ClvA ClvB ClvC ClvD WrA WrB WrC WrD Outflow
(min) cfs ft cfs cfs cfs cfs cfs cfs cf s cfs cfs
2 1.47 302.51 0.54 0.00 0.54
3 2.21 302.55 0.72 0.03 0.75
4 2.95 302.60 0.97 0.07 1.04
5 3.69 302.63 1.11 0.10 1.21
6 4.42 302.67 1.30 0.14 1.44
7 5.16 302.70 1.52 0.20 1.71
8 5.90 302.73 1.68 0.23 1.91
9 6.64 302.76 1.87 0.28 2.15
10 7.37 << 302.79 2.09 0.34 2.43
11 7.00 302.82 2.26 0.39 2.64
12 6.64 302.84 2.40 0.42 2.83
13 6.27 302.86 2.53 0.46 2.99
14 5.90 302.87 2.64 0.49 3.13
15 5.53 302.89 2.73 0.51 3.25
16 5.16 302.90 2.81 0.54 3.34
17 4.79 302.90 2.86 0.55 3.40
18 4.42 302.91 2.89 0.56 3.45
19 4.06 302.91 2.91 0.56 3.47
20 3.69 302.91 2.92 0.57 3.49
21 3.32 302.91 << 2.92 0.57 3.49 «
22 2.95 302.91 2.91 0.56 3.48
23 2.58 302.91 2.89 0.56 3.45
24 2.21 302.91 2.86 0.55 3.41
25 1.84 302.90 2.83 0.54 3.37
26 1.47 302.89 2.77 0.52 3.29
27 1.11 302.88 2.69 0.50 3.20
28 0.74 302.87 2.61 0.48 3.09
29 0.37 302.86 2.52 0.46 2.98
30 0.00 302.84 2.42 0.43 2.85
31 0.00 302.83 2.32 0.40 2.73
32 0.00 302.82 2.23 0.38 2.61
33 0.00 302.80 2.14 0.35 2.50
34 0.00 302.79 2.04 0.33 2.36
35 0.00 302.77 1.93 0.30 2.23
36 0.00 302.75 1.83 0.27 2.10
37 0.00 302.74 1.74 0.25 1.99
Continues on next page ...
2to3 Page 2 Hydrograph Discharge Table Time Inflow Elevation ClvA ClvB ClvC Clv D WrA WrB WrC WrD Outflow (min) cfs ft cf s cfs cfs cf s cfs cfs cfs cfs cfs 38 0.00 302.73 --------------------1.65 0.23 ----------1.88 39 0.00 302.71 --------------------1.57 0.21 ----- -----1.78 40 0.00 302.70 ------------------1.50 0.19 ---------1.69 41 0.00 302.68 -------------------1.38 0.16 ---------1.55 42 0.00 302.66 -----------·--------1.28 0.14 ---------·-1.42 43 0.00 302.64 -------------·-------1.18 0.12 ----------1.30 44 0.00 302.63 --------------------1.10 0.10 --------·-·-1.20 45 0.00 302.61 --------------------1.02 0.08 ----------1.11 46 0.00 302.60 ---·-------................ --0.96 0.07 ----------1.02 47 0.00 302.57 -----------------0.81 0.04 ----------0.85 48 0.00 302.55 ------------------0.68 0.02 ---------0.70 49 0.00 302.52 -------------------0.58 0.01 ----------0.59 50 0.00 302.50 ------------------0.50 0.00 ---------0.50 51 0.00 302.43 --------------------0.25 ---------------0.25 ... End
Hydrograph Summary Report Page 1
Hyd. Hydrograph Peak Time Time to Volume Return Inflow Maximum Maximum Hydrograph
No. type flow interval peak period hyd(s) elevation storage description
(origin) (cfs) (min) (min) (cuft) (yrs) (ft) (cuft)
1 Rational 4.08 1 10 3,672 10 ---ECond.
2 Rational 8.28 1 10 7,449 10 ---PCond.
3 Reservoir 3.78 1 21 7,449 10 2 302.94 3,404 2to3
..
Proj. file: Drainage. GPW IDF file: Brazos.IDF Run date: 12-23-2002
Hydrograph Report
Hyd. No. 1
ECond.
Hydrograph type
Storm frequency
Drainage area
Intensity
1-D-F Curve
= Rational
= 10 yrs
= 1.4 ac
= 8.63 in
= Brazos. !OF
Hydrograph Discharge Table
Time --Outflow
(hrs cfs)
0.02 0.41
0.03 0.82
0.05 1.22
0.07 1.63
0.08 2.04
0.10 2.45
0.12 2.86
0.13 3.26
0.15 3.67
0.17 4.08 <<
0.18 3.88
0.20 3.67
0.22 3.47
0.23 3.26
0.25 3.06
0.27 2.86
0.28 2.65
0.30 2.45
0.32 2.24
0.33 2.04
0.35 1.84
0.37 1.63
0.38 1.43
0.40 1.22
0.42 1.02
0.43 0.82
0.45 0.61
0.47 0.41
... End
Peak discharge = 4.08 cfs
Time interval = 1 min
Runoff coeff. = 0.35
Time of cone. (Tc) = 1 O min
Reced. limb factor = 2
Page 1
English
Total Volume= 3,672 cult
Hydrograph Report
Hyd. No. 2
PCond.
Hydrograph type
Storm frequency
Drainage area
Intensity
1-D-F Curve
= Rational
= 10 yrs = 1.4 ac
= 8.63 in
= Brazos. !OF
Hydrograph Discharge Table
Time --Outflow
(hrs cfs)
0.02 0.83
0.03 1.66
0.05 2.48
0.07 3.31
0.08 4.14
0.10 4.91
0.12 5.79
0.13 6.62
0.15 7.45
0.17 8.28<<
0.18 7.86
0.20 7.45
0.22 7.03
0.23 6.62
0.25 6.21
0.27 5.79
0.28 5.38
0.30 4.97
0.32 4.55
0.33 4.14
0.35 3.72
0.37 3.31
0.38 2.90
0.40 2.48
0.42 2.07
0.43 1.66
0.45 1.24
0.47 0.83
... End
Peak discharge = 8.28 cfs
Time interval = 1 min
Runoff coeff. = 0. 71
Time of cone. (Tc)= 10 min
Reced. limb factor = 2
Page 1
English
Total Volume= 7,449 cuft
Hydrograph Report Page 1
English
Hyd. No. 3
2 to 3
Hydrograph type = Reservoir Peak discharge = 3.78 cfs
Storm frequency = 10 yrs Time interval = 1 min
Inflow hyd. No. = 2 Reservoir name = Parking Lot
Max. Elevation = 302.94 ft Max. Storage = 3,404 cuft
Storage Indication method used. Total Volume= 7,449 cuft
Hydrograph Discharge Table
Time Inflow Elevation ClvA ClvB ClvC Clv D WrA WrB WrC WrD Outflow
(hrs) cfs ft cf s cfs cfs cfs cfs cf s cfs cfs cfs
0.03 1.66 302.52 0.56 0.00 0.56
0.05 2.48 302.57 0.78 0.04 0.81
0.07 3.31 302.61 1.01 0.08 1.09
0.08 4.14 302.64 1.17 0.12 1.29
0.10 4.97 302.68 1.39 0.17 1.56
0.12 5.79 302.72 1.59 0.21 1.81
0.13 6.62 302.75 1.78 0.26 2.04 0.15 7.45 302.78 2.01 0.32 2.32
0.17 8.28 << 302.81 2.22 0.38 2.60
0.18 7.86 302.84 2.41 0.43 2.84 0.20 7.45 302.87 2.58 0.47 3.05
0.22 7.03 302.89 2.73 0.51 3.25 0.23 6.62 302.90 2.85 0.55 3.40 0.25 6.21 302.92 2.93 0.57 3.50
0.27 5.79 302.92 3.00 0.59 3.59 0.28 5.38 302.93 3.06 0.60 3.66 0.30 4.97 302.94 3.10 0.62 3.71 0.32 4.55 302.94 3.13 0.62 3.75 0.33 4.14 302.94 3.14 0.63 3.77 0.35 3.72 302.94 << 3.15 0.63 3.78 << 0.37 3.31 302.94 3.14 0.63 3.77 0.38 2.90 302.94 3.12 0.62 3.74 0.40 2.48 302.94 3.09 0.61 3.71 0.42 2.07 302.93 3.05 0.60 3.66 0.43 1.66 302.92 3.00 0.59 3.59 0.45 1.24 302.92 2.95 0.57 3.52 0.47 0.83 302.91 2.88 0.55 3.43 0.48 0.41 302.90 2.80 0.53 3.33 0.50 0.00 302.88 2.68 0.50 3.18 0.52 0.00 302.86 2.57 0.47 3.04 0.53 0.00 302.85 2.46 0.44 2.90 0.55 0.00 302.83 2.36 0.41 2.77 0.57 0.00 302.82 2.26 0.39 2.65 0.58 0.00 302.81 2.18 0.36 2.54 0.60 0.00 302.79 2.08 0.34 2.41 0.62 0.00 302.78 1.97 0.31 2.28
Continues on next page ...
2to3 Page 2 Hydrograph Discharge Table Time Inflow Elevation ClvA ClvB ClvC ClvD WrA WrB WrC WrD Outflow (hrs) cfs ft cfs cfs cf s cfs cfs cf s cf s cfs cfs 0.63 0.00 302.76 --·------------------1.87 0.28 ----------2.15 0.65 0.00 302.75 -------------------1.77 0.26 ---------2.03 0.67 0.00 302.73 --------------------1.68 0.24 ----------1.92 0.68 0.00 302.72 -------------------·-1.60 0.22 ---------1.82 0.70 0.00 302.70 -------------------1.52 0.20 ---------1.72 0.72 0.00 302.69 -------------------1.42 0.17 ----------1.60 0.73 0.00 302.67 -------------------1.31 0.15 ----------1.46 0.75 0.00 302.65 -----------------1.22 0.13 ----------1.34 0.77 0.00 302.63 ------------------1.13 0.11 ---------1.24 0.78 0.00 302.62 -------------------1.05 0.09 ----------1.14 0.80 0.00 302.61 --------------- -----0.98 0.07 ----------1.05 0.82 0.00 302.58 -------------------0.87 0.05 ----------0.92 0.83 0.00 302.55 -------------------0.73 0.03 ----------0.76 0.85 0.00 302.53 -------------------0.62 0.01 ----------0.63 0.87 0.00 302.51 -·------------------0.53 0.00 ---------0.53 0.88 0.00 302.47 -------------------0.36 ---------------0.36 ... End
Hydrograph Summary Report Page 1
Hyd. Hydrograph Peak Time Time to Volume Return Inflow Maximum Maximum Hydrograph
No. type How interval peak period hyd(s) elevation storage description
(origin) (cfs) (min) (min) (cuft) (yrs) (ft) (cuft)
1 Rational 4.66 1 10 4,194 25 -·------ECond.
2 Rational 9.45 1 10 8,507 25 ----PCond.
3 Reservoir 4.17 1 21 8,507 25 2 302.98 4,042 2to3
Proj. file: Drainage.GPW IDF file: Brazos.IDF I Run date: 12-23-2002
Hydrograph Report
Hyd. No. 1
ECond.
Hydrograph type
Storm frequency
Drainage area
Intensity
1-D-F Curve
= Rational = 25 yrs
= 1.4 ac
= 9.86 in
= Brazos. IDF
Hydrograph Discharge Table
Time --Outflow
(hrs cfs)
0.02 0.47
0.03 0.93
0.05 1.40
0.07 1.86
0.08 2.33
0.10 2.8Q
0.12 3.26
0.13 3.73
0.15 4.19
0.17 4.66 <<
0.18 4.43
0.20 4.19
0.22 3.96
0.23 3.73
0.25 3.49
0.27 3.26
0.28 3.03
0.30 2.80
0.32 2.56
0.33 2.33
0.35 2.10
0.37 1.86
0.38 1.63
0.40 1.40
0.42 1.16
0.43 0.93
0.45 0.70
0.47 0.47
0.48 0.23
... End
Peak discharge = 4.66 cfs
Time interval = 1 min
Runoff coeff. = 0.35
Time of cone. (Tc)= 10 min
Reced. limb factor = 2
Page 1
English
Total Volume= 4,194 cuft
Hydrograph Report
Hyd. No. 2
PCond.
Hydrograph type
Storm frequency
Drainage area
Intensity
1-0-F Curve
= Rational
= 25 yrs
= 1.4 ac
= 9.86 in
= Brazos.IDF
Hydrograph Discharge Table
Time --Outflow
(hrs cfs)
0.02 0.95
0.03 1.89
0.05 2.84
0.07 3.78
0.08 4.73
0.10 5.67
0.12 6.62
0.13 7.56
0.15 8.51
0.17 9.45 <<
0.18 8.98
0.20 8.51
0.22 8.03
0.23 7.56
0.25 7.09
0.27 6.62
0.28 6.14
0.30 5.67
0.32 5.20
0.33 4.73
0.35 4.25
0.37 3.78
0.38 3.31
0.40 2.84
0.42 2.36
0.43 1.89
0.45 1.42
0.47 0.95
0.48 0.47
... End
Peak discharge = 9.45 cfs
Time interval = 1 min
Runoff coeff. = 0.71
Time of cone. (Tc)= 10 min
Reced. limb factor = 2
Page 1
English
Total Volume = 8,507 cuft
Hydrograph Report Page 1 English Hyd. No. 3 2 to 3 Hydrograph type = Reservoir Peak discharge = 4.17 cfs Storm frequency = 25 yrs Time interval = 1 min Inflow hyd. No. = 2 Reservoir name = Parking Lot Max. Elevation = 302.98 ft Max. Storage = 4,042 cuft Storage Indication method used. Total Volume= 8,507 cuft Hydrograph Discharge Table Time Inflow Elevation ClvA ClvB ClvC Clv D WrA WrB WrC WrD Outflow {hrs) cfs ft cf s cf s cf s cf s cfs cf s cf s cfs cfs 0.03 1.89 302.52 ------------------0.59 0.01 ----------0.60 0.05 2.84 302.58 -------------------0.85 0.05 ---------0.89 0.07 3.78 302.62 -----------------1.06 0.09 ---------1.15 0.08 4.73 302.66 --------------------1.26 0.13 ----- -----1.39 0.10 5.67 302.70 -------------------1.51 0.19 ---------1.70 0.12 6.62 302.73 --------- ----------1.70 0.24 ----------1.94 0.13 7.56 302.77 ------------------1.92 0.30 ----- -----2.22 0.15 8.51 302.81 -·------------------2.17 0.36 -------·--2.53 0.17 9.45 << 302.84 ------------------2.39 0.42 --------2.81 0.18 8.98 302.87 -------------------2.62 0.48 ---------3.10 0.20 8.51 302.90 ------------------2.82 0.54 --------3.36 0.22 8.03 302.92 -------------------2.95 0.58 ----------3.53 0.23 7.56 302.93 ----- -------------3.07 0.61 ---------3.68 0.25 7.09 302.95 ---------·--------3.17 0.64 --------3.81 0.27 6.62 302.96 ................. -------,.. ____ 3.26 0.66 ---------3.92 0.28 6.14 302.97 -----------------3.33 0.68 ---------4.01 0.30 5.67 302.97 --------------------3.38 0.70 ----------4.08 0.32 5.20 302.98 --------------------3.42 0.71 ---------4.13 0.33 4.73 302.98 -------------------3.44 0.71 ---------4.16 0.35 4.25 302.98 << -------------------3.45 0.72 ---------4.17 << 0.37 3.78 302.98 --------------------3.45 0.71 --------4.16 0.38 3.31 302.98 ------------------3.43 0.71 ---------4.14 0.40 2.84 302.98 -----------------3.40 0.70 ----------4.10 0.42 2.36 302.97 -------------------3.36 0.69 ---------4.05 0.43 1.89 302.96 ---·--------------3.30 0.67 ---------3.98 0.45 1.42 302.96 -------------------3.24 0.66 ----------3.89 0.47 0.95 302.95 ------------------3.16 0.63 ---------3.80 0.48 0.47 302.93 ------------------3.08 0.61 -------3.69 0.50 0.00 302.92 -------------------2.98 0.58 ----------3.57 0.52 0.00 302.91 --·-------------·--2.89 0.56 ---------3.44 0.53 0.00 302.89 -------------------2.78 0.53 --------3.31 0.55 0.00 302.88 --·------------------2.66 0.49 ----------3.16 0.57 0.00 302.86 --·--·--------------·-2.55 0.46 ----------3.01 0.58 0.00 302.85 ------------------2.44 0.44 ---------2.88 0.60 0.00 302.83 -------------------2.34 0.41 ----------2.75 0.62 0.00 302.82 --·--------------·-2.25 0.38 -------·---2.63 Continues on next page ...
2to3 Page 2 Hydrograph Discharge Table Time Inflow Elevation ClvA ClvB ClvC ClvD WrA WrB WrC WrD Outflow (hrs) cf s ft cf s cfs cfs cf s cfs cfs cf s cfs cfs 0.63 0.00 302.81 -------------------2.16 0.36 ---------2.52 0.65 0.00 302.79 ---·--------------2.06 0.33 ------·--2.39 0.67 0.00 302.77 --------·------------1.95 0.30 ------·----2.25 0.68 0.00 302.76 ------------------1.85 0.28 ----------2.13 0.70 0.00 302.74 --------------------1.76 0.25 ---------2.01 0.72 0.00 302.73 --------------------1.67 0.23 ----------1.90 0.73 0.00 302.72 -----------------1.59 0.21 ----------1.80 0.75 0.00 302.70 --------------------1.51 0.19 -----___ ..,.. 1.71 0.77 0.00 302.68 ----·---------------1.40 0.17 ----------1.57 0.78 0.00 302.67 --·----------------·--1.30 0.14 -------1.44 0.80 0.00 302.65 -------------------1.20 0.12 ----------1.32 0.82 0.00 302.63 -·------------------1.12 0.10 ---------1.22 0.83 0.00 302.62 --·------- ---------1.04 0.09 ----------1.12 0.85 0.00 302.60 ---·----------------0.97 0.07 ----------1.04 0.87 0.00 302.58 ------------------0.84 0.05 --------0.89 0.88 0.00 302.55 ------------------0.71 0.02 ---------0.73 0.90 0.00 302.53 ----------·-------0.60 0.01 --------0.61 0.92 0.00 302.51 -------------------0.52 0.00 --------0.52 0.93 0.00 302.45 ----------------0.30 --------------0.30 ... End
Hydrograph Summary Report Page 1
Hyd. Hydrograph Peak Time Time to Volume Return Inflow Maximum Maximum Hydrograph
No. type flow interval peak period hyd(s) elevation storage description
(origin) (cfs) (min) (min) (cuft) (yrs) (ft) (cuft)
1 Rational 5.27 1 10 4,741 50 ---ECond.
2 Rational 10.69 1 10 9,617 50 ----PCond.
3 Reservoir 5.26 1 20 9,617 50 2 303.01 4,584 2to3
..
Proj. file: Drainage. GPW IDF file: Brazos. !OF Run date: 12-23-2002
Hydrograph Report
Hyd. No. 1
ECond.
Hydrograph type
Storm frequency
Drainage area
Intensity
1-D-F Curve
= Rational
= 50 yrs
= 1.4 ac
= 11.15 in
= Brazos.IDF
Hydrograph Discharge Table
Time --Outflow
(hrs cfs)
0.02 0.53
0.03 1.05
0.05 1.58
0.07 2.11
0.08 2.63
0.10 3.16
0.12 3.69
0.13 4.21
0.15 4.74
0.17 5.27 <<
0.18 5.00
0.20 4.74
0.22 4.48
0.23 4.21
0.25 3.95
0.27 3.69
0.28 3.42
0.30 3.16
0.32 2.90
0.33 2.63
0.35 2.37
0.37 2.11
0.38 1.84
0.40 1.58
0.42 1.32
0.43 1.05
0.45 0.79
0.47 0.53
0.48 0.26
... End
Peak discharge = 5.27 cfs
Time interval = 1 min
Runoff coeff. = 0.35
Time of cone. (Tc)= 10 min
Reced. limb factor = 2
Page 1
English
Total Volume : 4,741 cuft
Hydrograph Report Hyd. No. 2 PCond. Hydrograph type Storm frequency Drainage area Intensity 1-0-F Curve = Rational = 50 yrs = 1.4 ac = 11.15 in = Brazos.IDF Hydrograph Discharge Table Time --Outflow (hrs cfs) 0.02 1.07 0.03 2.14 0.05 3.21 0.07 4.27 0.08 5.34 0.10 6.41 0.12 7.48 0.13 8.55 0.15 9.62 0.17 10.69<< 0.18 10.15 0.20 9.62 0.22 9.08 0.23 8.55 0.25 8.01 0.27 7.48 0.28 6.95 0.30 6.41 0.32 5.88 0.33 5.34 0.35 4.81 0.37 4.27 0.38 3.74 0.40 3.21 0.42 2.67 0.43 2.14 0.45 1.60 0.47 1.07 0.48 0.53 ... End Page 1 English Peak discharge = 10.69 cfs Time interval = 1 min Runoff coeff. = 0.71 Time of cone. (Tc) = 10 min Reced. limb factor = 2 Total Volume= 9,617 cuft
Hydrograph Report Page 1
English
Hyd. No. 3
2 to 3
Hydrograph type = Reservoir Peak discharge = 5.26 cfs
Storm frequency = 50 yrs Time interval = 1 min
Inflow hyd. No. = 2 Reservoir name = Parking Lot
Max. Elevation = 303.01 ft Max. Storage = 4,584 cuft
Storage Indication method used. Total Volume = 9,617 cuft
Hydrograph Discharge Table
Time Inflow Elevation ClvA ClvB ClvC ClvD WrA WrB WrC WrD Outflow
(hrs) cfs ft cf s cfs cfs cfs cf s cfs cf s cfs cfs
0.03 2.14 302.53 0.62 0.01 0.63
0.05 3.21 302.60 0.92 0.06 0.99
0.07 4.27 302.63 1.11 0.10 1.21
0.08 5.34 302.67 1.35 0.15 1.50
0.10 6.41 302.72 1.59 0.21 1.80
0.1 2 7.48 302.75 1.81 0.27 2.08
0.13 8.55 302.79 2.08 0.34 2.41
0.15 9.62 302.83 2.32 0.40 2.72
0.17 10.69 << 302.87 2.58 0.47 3.05
0.18 10.15 302.90 2.84 0.54 3.38 0.20 9.62 302.93 3.01 0.59 3.61
0.22 9.08 302.95 3.17 0.64 3.81
0.23 8.55 302.97 3.31 0.68 3.99 0.25 8.01 302.98 3.43 0.71 4.15
0.27 7.48 302.99 3.54 0.74 4.28
0.28 6.95 303.00 3.61 0.76 0.21 4.58
0.30 6.41 303.01 3.65 0.77 0.54 4.96
0.32 5.88 303.01 3.67 0.78 0.73 5.18
0.33 5.34 303.01 << 3.68 0.78 0.79 5.26 << 0.35 4.81 303.01 3.68 0.78 0.77 5.22
0.37 4.27 303.01 3.67 0.78 0.66 5.10 0.38 3.74 303.01 3.64 0.77 0.49 4.90 0.40 3.21 303.00 3.62 0.76 0.26 4.64 0.42 2.67 303.00 3.58 0.75 4.33 0.43 2.14 302.99 3.53 0.74 4.26
0.45 1.60 302.98 3.46 0.72 4.18 0.47 1.07 302.97 3.38 0.69 4.07 0.48 0.53 302.96 3.28 0.67 3.95 0.50 0.00 302.95 3.18 0.64 3.82 0.52 0.00 302.93 3.08 0.61 3.68 0.53 0.00 302.92 2.97 0.58 3.56 0.55 0.00 302.91 2.88 0.55 3.43
0.57 0.00 302.89 2.77 0.53 3.30 0.58 0.00 302.88 2.65 0.49 3.15 0.60 0.00 302.86 2.54 0.46 3.00
0.62 0.00 302.85 2.44 0.43 2.87
Continues on next page ...
2to3 Page 2 Hydrograph Discharge Table Time Inflow Elevation ClvA ClvB Clv C Clv D WrA WrB WrC WrD Outflow (hrs) cf s ft cfs cfs cf s cf s cfs cfs cf s cf s cfs 0.63 0.00 302.83 --------------------2.34 0.41 ----------2.74 0.65 0.00 302.82 --------------------2.24 0.38 ---------2.62 0.67 0.00 302.80 --------------------2.15 0.36 ----- -----2.51 0.68 0.00 302.79 -------------·------2.05 0.33 ---------2.38 0.70 0.00 302.77 -------------------1.94 0.30 ----------2.24 0.72 0.00 302.76 -------------------1.84 0.28 ----------2.12 0.73 0.00 302.74 --------------------1.75 0.25 ----------2.00 0.75 0.00 302.73 --------------------1.66 0.23 ----------1.89 0.77 0.00 302.71 ................ --------------1.58 0.21 ---------1.79 0.78 0.00 302.70 --------------------1.51 0.19 ----------1.70 0.80 0.00 302.68 -----------------1.40 0.17 ---------1.56 0.82 0.00 302.66 --------- ----- -----1.29 0.14 ---------1.43 0.83 0.00 302.65 -------------- -----1.19 0.12 --------1.31 0.85 0.00 302.63 -------------------1.11 0.10 ---------1.21 0.87 0.00 302.62 ------------------1.03 0.08 ---------1.12 0.88 0.00 302.60 -·------------------0.96 0.07 ----------1.03 0.90 0.00 302.58 --------------------0.83 0.04 ---------0.87 0.92 0.00 302.55 --------------------0.70 0.02 ----------0.72 0.93 0.00 302.53 ------------------· 0.60 0.01 -------0.60 0.95 0.00 302.51 --------- ----------0.51 0.00 ---------0.51 0.97 0.00 302.44 --·----------------0.28 ---------------0.28 ... End
Hydrograph Summary Report Page 1
Hyd. Hydrograph Peak Time Time to Volume Return Inflow Maximum Maximum Hydrograph
No. type flow interval peak period hyd(s) elevation storage description
(origin) (cfs) (min) (min) (cuft) (yrs) (ft) (cuft)
1 Rational 5.50 1 10 4,950 100 -----ECond.
2 Rational 11 .16 1 10 10,041 100 ---PCond.
3 Reservoir 5.74 1 20 10,041 100 2 303.02 4,729 2to3
..
Proj. file: Drainage. GPW IDF file: Brazos.IDF Run date: 12-23-2002
Hydrograph Report
Hyd. No. 1
ECond.
Hydrograph type
Storm frequency
Drainage area
Intensity
1-D-F Curve
= Rational
= 100 yrs
= 1.4 ac = 11.64 in = Brazos.IDF
Hydrograph Discharge Table
Time --Outflow
(hrs cfs)
0.02 0.55
0.03 1.10
0.05 1.65
0.07 2.20
0.08 2.75
0.10 3.30
0.12 3.85
0.13 4.40
0.15 4.95
0.17 5.50 <<
0.18 5.22
0.20 4.95
0.22 4.67
0.23 4.40
0.25 4.12
0.27 3.85
0.28 3.57
0.30 3.30
0.32 3.02
0.33 2.75
0.35 2.47
0.37 2.20
0.38 1.92
0.40 1.65
0.42 1.37
0.43 1.10
0.45 0.82
0.47 0.55
... End
Peak discharge = 5.50 cfs
Time interval = 1 min
Runoff coeff. = 0.35
Time of cone. (Tc) = 10 min
Reced. limb factor = 2
Page 1
English
Total Volume= 4,950 cuft
Hydrograph Report
Hyd. No. 2
PCond.
Hydrograph type
Storm frequency
Drainage area
Intensity
1-D-F Curve
= Rational = 100 yrs
= 1.4 ac
= 11.64 in
= Brazos.IDF
Hydrograph Discharge Table
Time --Outflow
{hrs cfs)
0.02 1.12
0.03 2.23
0.05 3.35
0.07 4.46
0.08 5.58
0.10 6.69
0.12 7.81
0.13 8.92
0.15 10.04
0.17 11.16 «
0.18 10.60
0.20 10.04
0.22 9.48
0.23 8.92
0.25 8.37
0.27 7.81
0.28 7.25
0.30 6 .69
0.32 6.14
0.33 5.58
0.35 5.02
0.37 4.46
0.38 3.90
0.40 3.35
0.42 2.79
0.43 2.23
0.45 1.67
0.47 1.12
0.48 0.56
... End
Page 1
English
Peak discharge = 11 .16 cfs
Time interval = 1 min
Runoff coeff. = 0.71
Time of cone. (Tc)= 1 O min
Reced. limb factor = 2
Total Volume= 10,041 cuft
Hydrograph Report Page 1
English
Hyd. No. 3
2 to 3
Hydrograph type = Reservoir Peak discharge = 5.74 cfs
Storm frequency = 100 yrs Time interval = 1 min
Inflow hyd. No. = 2 Reservoir name = Parking Lot
Max. Elevation = 303.02 ft Max. Storage = 4,729 cuft
Storage Indication method used. Total Volume= 10,041 cuft
Hydrograph Discharge Table
Time Inflow Elevation ClvA ClvB Clv C Clv D WrA WrB WrC WrD Outflow
(hrs) cfs ft cf s cfs cfs cf s cfs cfs cf s cf s cf s
0.03 2.23 302.53 0.63 0.01 0.64
0.05 3.35 302.60 0.95 0.07 1.02
0.07 4.46 302.63 1.13 0.11 1.24
0.08 5.58 302.68 1.38 0.16 1.54
0.10 6.69 302.72 1.62 0.22 1.84
0.12 7.81 302.76 1.85 0.28 2.13
0.13 8.92 302.80 2.13 0.35 2.49
0.15 10.04 302.84 2.37 0.42 2.79
0.17 11 .16<< 302.88 2.65 0.49 3.1 4
0.18 10.60 302.91 2.90 0.56 3.46
0.20 10.04 302.94 3.09 0.61 3.70
0.22 9.48 302.96 3.26 0.66 3.92
0.23 8.92 302.98 3.41 0.70 4.1 1
0.25 8.37 302.99 3.54 0.74 4.28
0.27 7.81 303.01 3.63 0.77 0.34 4.73
0.28 7.25 303.01 3.68 0.78 0.78 5.24
0.30 6.69 303.02 3.71 0.79 1.05 5.56
0.32 6.14 303.02 3.73 0.80 1.19 5.72
0.33 5.58 303.02 << 3.73 0.80 1.21 5.74 <<
0.35 5.02 303.02 3.73 0.79 1.14 5.66
0.37 4.46 303.02 3.71 0.79 1.00 5.49
0.38 3.90 303.01 3.68 0.78 0.79 5.25
0.40 3.35 303.01 3.65 0.77 0.53 4.96
0.42 2.79 303.00 3.61 0.76 0.24 4.61
0.43 2.23 303.00 3.57 0.75 4.31
0.45 1.67 302.99 3.50 0.73 4.23
0.47 1.12 302.98 3.42 0.71 4.12
0.48 0.56 302.97 3.32 0.68 4.00
0.50 0.00 302.95 3.22 0.65 3.87
0.52 0.00 302.94 3.11 0.62 3.73
0.53 0.00 302.93 3.01 0.59 3.60
0.55 0.00 302.91 2.91 0.56 3.47
0.57 0.00 302.90 2.82 0.54 3.35
0.58 0.00 302.88 2.69 0.50 3.20
0.60 0.00 302.87 2.58 0.47 3.05
0.62 0.00 302.85 2.47 0.44 2.91
Continues on next page ...
2to 3 Page 2 Hydrograph Discharge Table Time Inflow Elevation ClvA ClvB ClvC Clv D WrA WrB WrC WrD Outflow (hrs) Cfs ft cfs Cfs Cfs Cfs cfs cfs cfs Cfs cfs 0.63 0.00 302.84 ------------------2.37 0.42 ----------2.78 0.65 0.00 302.82 -------------------2.27 0.39 ----------2.66 0.67 0.00 302.81 ------------------2.18 0.37 ----------2.55 0.68 0.00 302.79 -------------------2.09 0.34 ----------2.43 0.70 0.00 302.78 -------------------1.98 0.31 ----------2.29 0.72 0.00 302.76 --------------------1.87 0.28 ----------2.16 0.73 0.00 302.75 ---------------1.78 0.26 ---·-----2.04 0.75 0.00 302.73 -----------------1.69 0.24 ----------1.93 0.77 0.00 302.72 ------------------1.61 0.22 ---·-----1.83 0.78 0.00 302.71 ---·--------·-------1.53 0.20 ----------1.73 0.80 0.00 302.69 --·---------------1.44 0.18 -------1.61 0.82 0.00 302.67 ------------------1.32 0.15 ----------1.47 0.83 0.00 302.65 ------------------1.23 0.13 ---------1.35 0.85 0.00 302.64 --·----------------1.14 0.11 ---------1.25 0.87 0.00 302.62 --·----------------1.06 0.09 ---------1.15 0.88 0.00 302.61 -----------------0.99 0.08 ----------1.06 0.90 0.00 302.59 ------------------0.88 0.05 --------0.94 0.92 0.00 302.56 ----------------0.74 0.03 ----------0.77 0.93 0.00 302.53 -------------------0.63 0.01 ----------0.64 0.95 0.00 302.51 ------------------0.54 0.00 -----0.54 0.97 0.00 302.47 -------------------0.39 ---------------0.39 ... End