Loading...
HomeMy WebLinkAboutFolderCf W DEVELOPMENT PERMIT PERMIT NO. 02-28 Project: St. Mary's Church Parking Lot COLLEGE STATION FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Lot 2-R The Ramparts Subdivision DATE OF ISSUE: 10/9/02 OWNER: c/o St. Mary's Catholic Church 103 Nagle College Station , TX 77840 TYPE OF DEVELOPMENT: SPECIAL CONDITIONS: SITE ADDRESS: 300 Nagle Street DRAINAGE BASIN: Burton Creek VALID FOR 12 MONTHS CONTRACTOR: Full Development Permit All construction must be in compliance with the approved construction plans All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter. Landscaping plans must be reviewed and approved, and resulting systems verified to be installed per plans prior to project completion. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite, it is the contractors responsibility to implement measures that will meet City, State and Federal requirements. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area inside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. ;o/9/oZ. Date / 1 /;---It! -o L---, Date STAFF REVIEW COMMENTS NO. 1 Project: DP-ST MARY'S PARKING LOT -DEVELOPMENT PERMIT (0-500044) ENGINEERING 1. I do not see where this project has requested a Development Permit. 2. The Drainage Report, being a requirement of the Development Permit, seems to be in order this project. 3. Everything looks good and meets requirements. However, your project calls for a junction box in Church Street to tie-in to the public stormwater system and replacing the disturbed pavement. There are no inlet boxes on this section of Church Street to take stormwater off the street surface and route it underground. Rather than install a junction box, please consider a curb inlet. The curb inlet will pick up water in the street as well as water from your drive. It is my opinion that a curb inlet installed at this location will enhance the area during rainfall events. Thank you for your consideration of this matter. Reviewed by: Spencer Thompson Date: May 24, 2002 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 2 of2 / f SUPPLEMENT AL DEVELOPMENT PERMIT INFORMATION \... .\ Application is hereby made for the taiowing velopment specific site/waterway alterations: O:>-;;__,<:( 7I171 OZ- Parking lot Construction in the Wolf Pen Creek Drainage Ba.sin. :>~' z.. "/\-\ ACKNOWLEDGMENTS: I, ----------------·~/owner, hereby acknowledge or affirm that: The information and conclusions contained in the above plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design Standards. As a condition of approval of this permit application, I agree to construct the improvements proposed in this application according to th e documents and the requirements of Chapter 13 of the College S ~City Code. CERTIFICATIONS: (for proposed alterations within designated flood hazard areas.) A.I, certify that any nonresidential structure on or proposed to be on this site as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100 year storm. Engineer Date B. I, certify that the finished floor elevation of the lowest floor, including any basement, of any residential structure, proposed as part of this application is at or above the base flood elevation established in the latest Federal Insurance Administration Flood Hazard Study and maps, as amended. Engineer Date c. 1, '.1i chael R. McClure, P.E. , certify that the alterations or development covered by this permit shall not diminish the flood-carrying capacity of the waterway adjoining or crossing this permitted site and that such alterations or development are consistent with requirements of the City of College Station City Code, Chapter 13 concerning encroachments of floodways and of floodway fringes. Engineer Date D. I, , do certify that the proposed alterations do not raise the level of the 100 year flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study. Engineer Date Conditions or comments as part of approval: -------------------------- In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. ~ All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply I ' \ • SUPPLEMENTAL DEVELOPMENT PERMIT INFORMATION Application is hereby made for the following development specific site/waterway alterations: Construction of a parking lot facility for St. Marys catholic Center which is located in the Wolf Pen Creek Drainage Facility ACKNOWLEDGMENTS: I, -----------------• design engineer/owner, hereby acknowledge or affirm that: The information and conclusions contained in the above plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design Standards. As a condition of approval of this permit application, I agree to construct the improvements proposed in this application according to these documents and the requirements of Chapter 13 of the College Station City Code. Property Owner(s) Contractor CERTIFICATIONS: (for proposed alterations within designated flood hazard areas.) A. I, certify that any nonresidential structure on or proposed to be on this site as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100 year storm. Engineer Date B. I, certify that the finished floor elevation of the lowest floor, including any basement, of any residential structure, proposed as part of this application is at or above the base flood elevation established in the latest Federal Insurance Administration Flood Hazard Study and maps, as amended. Engineer Date C. I, Michael R. McClure, P.E. , certify that the alterations or development cove ~l~~it shall not diminish the flood-carrying capacity of the waterway adjoining or crossing this permitted sit~&t.ttla ~~ll':~ ations or development are consistent with requirements of the City of College Station City Code, Ch 't~-1 3 rn•Aif ll encroachments of fl ways and of floodway fringes. &! .. ! ..................... ::1~ ~ l~~l.9.~.~.~.~.R . .¥.~91~~~.J Date ~ o\~ <;>./4f, ··~;f.9tSTE~~··0· ~ *" \J. •••••• •• "" D. I, , do certify that the proposed alterations do not · Jw..Le~ the 100 year flood above elevation established in the latest Federal Insurance Administration Flood Hazard !t:> Engineer Date Conditions or comments as part of approval:--------------------------- In accordance wfth Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilfties . . ,11 development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply FOR OFACE USE ONLY P&Z CASE NO.: ----- DATE SUBMITTED: SITE PLAN APPLICATION MINIMUM SUBMITTAL REQUIREMENTS _x_ Site plan application completed in full. _x_ $200.00 Application Fee. . . -$200.00 Development Permit Application Fee. (~velq:::>m~nt Pernut & Fee to be sul:mitted == $600.00 Public Infrastructure Inspection Fee if appn~bPe1:a(-fWi~1e~e~Pc}1able if construction of a public waterline, sewer!ine, sidewalk, street or drainage facilities is involved.) _X_ Ten (10) folded copies of site plan. _X_ A copy of the attached site plan checklist with all items checked off or a brief explanation as to why they are not checked off. n/a Parkland Dedication requirement approved by th e Parks & Recreation Board, please provide proof of approval (if applicable). NAME OF PROJECT 3. 185 Acre Parking Area -St. Mary's Catholic Church ADDRESS Nagle Street LEGAL DESCRIPTION Lot 2-R THE RAMPARTS APPLICANT/PROJECT MANAGER'S INFORMATION (Primary Contact for the Project): Name Mr. Greg Gonnan, St. Mary's Catholic Church Street Address 1 03 Nagle Street City College Station State TX Zip Code 77840 E-Mail Address ------------- Phone Number 846-5717 Fax Number -------------- PROPER TY OWNER'S INFORMATION: Name The Most Reverend Gregory M. Aymond,Rishop, Diocese of Austin & His Sucessors in o f ice Street Address __ sarne ___ a_s_illxw __ e ___________ _ City ---------- State _____ Zip Code _____ _ E-Mail Address ------------- Phone Number ------------Fax Number _____________ _ ARCHITECT OR ENGINEER'S INFORMATION: Name Michael R. Mc'Clure, P .E., R.P .L.S. -McCLURE ENGINEERING, INC. Street Address 1008 Woodcreek Drive City College Station State TX Zip Code __ 7_7_84_5 __ _ E-Mail Address mikem@tca.net Fax Number 693-2554 ---------------Phone Number _6_9_3_-_3_8_38 _______ _ OTHER CONTACTS (Please specify type of contact, i.e. project manager, potential buyer, local contact, etc.) Name ------------------------------------ Street Address ------------------- St ate _____ Zip Code _____ _ E-Mail Address ____________ _ Phone Number ___________ _ Fax Number ______________ _ Site Plan Aoolication 1/8/2002 1 of 3 JUN O o 100! l,UGE S1' A TIO D ra Jn age Re po r L!E!!MG~lH!!!E:?:E:!.!:R':.:.;.NG.---rT FOR St. Mary's Parking Lot . Site Plan NTS APRIL, 2002 Prepared By: McClure Engineering. Inc. 1008 WOODCREEK DRIVE SUITE 103 COLLEGE STATION, TEXAS 77845 (979) 693-3838 CERTIFICATION I, Kent M. Laza, Registered Professional Engineer No. 65923, State of Texas, certify that this report for the drainage design for the ST. MARY'S PARKING LOT project, was prepared by me in accordance with the provisions of the City of College Station Drainage Policy and Design Standards for the owners thereof ~t:_L a 'lj_u /oz ~ent M. Laz.a, ~-65923 ' DRAINAGE REPORT DRAINAGE REPORT INTRODUCTION LOCATION DESCRIPTION ST. MARY'S PARKING LOT SITE TABLE OF CONTENTS DRAINAGE DESIGN CRITERIA STORM DRAIN FACILITY DESIGN DETENTION FACILITY DESIGN AND ANALYSIS CONCLUSION TABLE OF EXHIBITS EXCERPT FROM FLOOD INSURANCE RATE MAP DRAINAGE AREA MAP -EXISTING CONDITIONS DRAINAGE AREA MAP -PROPOSED CONDITIONS RATIONAL FORMULA DRAINAGE AREA CALCULATIONS PIPE SIZE CALCULATIONS PROPOSED DETENTION POND ROUTING ROUTING HYDROGRAPH STAGE STORAGE AND STAGE DISCHARGE TABLE DRAINAGE REPORT A&M CHURCH OF CHRIST 2 2 A B-1 B-2 C-1 C-2 D-1 D-2 D-3 INTRODUCTION: DRAINAGE ANALYSIS FOR THE St. Mary's Church Parking Lot Site The purpose of this report is to describe drainage effects associated with the development of the new parking lot site adjacent to St. Mary's Catholic Church in College Station. This drainage analysis is provided to demonstrate that the final design for the site complies with the City of College Station Drainage Policy and Design Standards (DPDS) by controlling runoff from this site. LOCATION: The site is located at the north corner of the intersection of Nagle Street. and Church Street. The northwest property line adjoins Tract "D-1" of The Ramparts apartment complex. Bordering the site on the northeast is Lot 1-R of the The Ramparts Rep lat. The southeast side is bordered by Church Street. The southwest is bordered by Nagle Street. DESCRIPTION: The site encompasses an area of 3 .185 acres. The site is currently used as a dirt covered parking lot. It is generally open with the exception of some small clusters of trees. Natural drainage is toward the northeast comer of the site where it flows into a city owned storm drain system. Eventually the runoff from this site empties into Wolf Pen Creek and ultimately the Navasota River. Exhibit B-1 shows the pre-development drainage areas. This site is not located in a 100-Y ear Flood Haz.ard Area according to the FEMA Flood Insurance .Rate Maps for Brazos County, Texas (Map Nos. 48041C0144C effective July 2, 1992) An excerpt of this map is shown in Exhibit A. DRAINAGE DESIGN CRITERIA: The proposed drairiage system is designed in accordance with the City of College Station's DPDS. The design storm for the underground system is a 10-year event and flow calculations are based on the Rational Method. Pipe sizes were determined using Manning's Equation with an "n" of 0.014. The storage routing for the detention pond is based on a triangular hydrograph. STORM DRAIN FACILITY DESIGN: The proposed design allows most of the runoff from the site to be captured in the driveways and parking areas where it is directed into inlets or flumes that lead to the detention facility. Exhibit B-2 is the drainage area DRAINAGE ANALYSIS St. Mary's Parking Lot Site map that shows the post-development drainage areas. Runoff calculations for each drainage area are shown in Exhibit C-1. Exhibit C-2 shows the pipe sire computations derived from these runoff calculations. DETENTION FACILITY DESIGN AND ANALYSIS: The storage routing for the detention pond is based on a triangular hydrograph routing of the peak flows based on the rational method and a time base of 3* Tc, with the peak flow at the time of concentration. The storage routing is performed in Microsoft Excel using the storage indication curve method. The storage volume is computed using the trapezoidal approximation of volume. The pond is analyzed for the 5, 10, 25, 50, and 100 year storm events. The outfall structure for the detention pond is a 22" x 22" grate inlet (Vulcan V-5622) and the top of berm elevation is 337. 75'. The study point of the routing analysis (Study Point A) is located at the proposed junction box on the existing 30" RCP in Church Ave. The following summary table gives the pre-development and post- development flows at the study point to demonstrate that the post-development flow will be equal to or less than the pre-development flow. These figures are taken from Exhibit D-1. Proposed Existing Pond W.S. Elev. Qs 7.9 cfs 9.8 cfs 337.08 Q10 8.4 cfs 11.0 cfs 337.24 Qis 9.0 cfs 12.6 cfs 337.46 Qso 9.5 cfs 14.2 cfs 337.57 Q100 10.9 cfs 16.0 cfs 337.82 Top of Berm= 337.75 CONCLUSION: As indicated in the table shown above, the proposed drainage system and detention pond provide adequate capacity to prevent post-development runoff rates from exceeding pre-development runoff rates for any of the design storms. Therefore, we conclude that it meets the requirements of the city's drainage policy for this development. DRAINAGE ANALYSIS St. Mary's Parking Lot Site 2 I .. .. ·;"' .# '•'!I• ~·-.; :.·.·: \i . ~ -I ·· , EXHIBIT A Flood Insurance Rote Map Excerpt Brazos County. Texas and Incorporated Areas Mop Numbers: 48041 C0144C Effective Date: July 2, 1992 ~ ::: 0 0 ct UJ ..J ..J ct ~ a. ct LL UJ 0 j:: I-0 (!) ct -' z ct z ct ct UJ z UJ (.) 5 i= -' (ij ct UJ :E -' z 0 ~ ct UJ ct ct (!) I-0 UJ en > I-UJ z 0 z ct UJ ct ~ 0 > UJ 0 I-::::> ct ct I-0 -' a. NO. AC. 0.4 0.55 0.9 ft. 1 1.29 0.17 0.00 1.12 1.08 1.0 2 0.63 0.02 0.00 0.61 0.56 2.0 3 0.61 0.11 0.00 0.50 0.49 3.0 Pond 0.19 0.19 0.00 0.00 0.08 4.0 Bypass 0.47 0.24 0.00 0.23 0.30 30.0 Ex 3.19 3.19 0.00 0.00 1.27 314.0 EXHIBIT C-1 Rational Formula Drainage Area Calculations St. Mary's Parking Lot ::: 0 ::: ::: ..J LL 0 0 0 -' -' z LL LL ~ 5 ct ::c ct u UJ I-UJ u I-u I-ct -' ~ (!) ~ -' 0 0 UJ -' ::::> z ::::> -' -' UJ > ct UJ Ci en N I() 0 LL (!) ~ (!) ~ > (.) ::::> ~ 0 !!? 0 ft. ft. ft. ft/s min min In/Hr cfs In/Hr cfs 1.0 330.0 4.0 2.2 2.5 10.0 6.33 6.8 7.7 8.3 2.0 315.0 7.0 3.0 1.8 10.0 6.33 3.5 7.7 4.3 3.0 316.0 8.0 3.2 1.7 10.0 6.33 3.1 7.7 3.8 4.0 317.0 9.0 3.4 1.6 10.0 6.33 0.5 7.7 0.6 0.5 400.0 6.0 2.2 3.3 10.0 6.33 1.9 7.7 2.3 6.0 1.0 1.0 1.0 5.4 10.0 6.33 8.1 7.7 9.8 0 I() 0 .... I() N .... 0 ~ 0 - In/Hr cfs In/Hr cfs 8.6 9.3 9.9 10.6 8.6 4.8 9.9 5.5 8.6 4.3 9.9 4.9 8.6 0.7 9.9 0.7 8.6 2.6 9.9 3.0 8.6 11 .0 9.9 12.6 0 !!? In/Hr 11 .1 11 .1 11 .1 11 .1 11 .1 11 .1 0 0 0 0 I() 0 .... 0 !: 0 cfs In/Hr cfs 12.0 12.5 13.5 6.2 12.5 7.0 5.5 12.5 6.2 0.8 12.5 1.0 3.4 12.5 3.8 14.2 12.5 16.0 4/23/02 011 5-dra.xls Exhibit C-1 W N -~~ ~ .., VI 0\ t:J~ VI N 0 00 ~ 00 0 ~ ?' -N VI N 0 NN N 00 00 00 0 0 !'-> :,,.. °' -'*-'*-'*- w N - VI ?' -N VI N 0 en en en .... ..... .... p.. p.. p.. t""' t""' t""' ~ ~ ~ "O "O "O 0 0 0 s· s· s· .... ..... .... ~ ~ ~ [ [ [ ---.., °' °' °' ~ \0 \0 \0 w w -.l (""} iv °' 0 ~ = VI -.l \0 ., O" ..... -= VI VI 0 = ;-" - 0 0 0 = .., C) ~ ., IO -~ " ..... = = ;-" -~ I = DRAINAGE AREA NO. Overflow Drainage Area Drainage area Q Q Carry Over Total Q at Inlet Street Width Required Street Slope(%) Inlet No. Total Q at Inlet ~ tr1 00 ('") ~ "'O ~ ,.... 0 z CAP. Per L.F. L. Reqd. L. Provided Q Carry Over Ponded Depth CAP. Per S.F . Area Required Area Provided -en z ~ I 3: m S» -t m ~ 0 >< -0 :I: fl) 3: - ""CJ ""CJ~ ~ c -I "-I 0 -· )> I :::J -IN cc - I 0 0 z -en I l D.A.# D.A. # D.A.# "" ~ 0 c. w ftl ... z Cl iii 0 ... ::!: ,, ..... N >. 0 0 0 :I: (/) (/) 0 Qp 16.1 5.1 Tc 5.7 5.3 inc 1.0 2.0 Time cfs cfs 0.0 0.0 0.0 0.0 1.0 2.8 1.0 3.8 2.0 5.6 1.9 7.6 3.0 8.5 2.9 11.4 4.0 11.3 3.8 15.1 5.0 14.1 4.8 18.9 6.0 15.7 4.8 20.4 7.0 14.3 4.3 18.5 8.0 12.9 3.8 16.7 9.0 11.4 3.3 14.8 10.0 10.0 2.8 12.9 11.0 8.6 2.4 . 11.0 12.0 7.2 1.9 9.1 13.0 5.8 1.4 7.2 14.0 4.4 0.9 5.3 15.0 3.0 0.4 3.4 16.0 1.6 0.0 1.6 17.0 0.1 0.0 0.1 18.0 0.0 0.0 0.0 19.0 0.0 0.0 0.0 20.0 0.0 0.0 0.0 21.0 0.0 0.0 0.0 22.0 0.0 0.0 0.0 23.0 0.0 0.0 0.0 24.0 0.0 0.0 0.0 25.0 0.0 0.0 0.0 26.0 0.0 0.0 0.0 27.0 0.0 0.0 0.0 28.0 0.0 0.0 0.0 29.0 0.0 0.0 0.0 30.0 0.0 0.0 0.0 PEAK FLOWS 15.7 4.8 20.4 0.00 indicates inital condition EXHIBIT "D-1" PROPOSED DETENTION POND ROUTING Sl Mary's Parking Lot Pond Routing EVENT= 5 D.A.# c CJ z. c c 32 0 ..... q Cll + ..... :;::; Cll c 32 + ..... ,, ~ ftl + c + c 41 ~ (/) (/) c 0-c N N CJ fl. w m 3.0 5.0 cfs cfs cfs cfs ft cfs 3.79 0.00 0.00 0.00 335.2 0.0 11.36 0.66 3.79 1.56 335.4 0.6 18.93 7.51 12.02 2.26 335.5 1.2 26.51 19.51 26.44 3.47 335.8 1.8 34.08 37.45 46.01 4.28 336.1 2.4 39.37 62.11 71.53 4.71 336.3 3.0 38.99 91.05 101.48 5.21 336.5 2.7 35.20 119.06 130.04 5.49 336.7 2.4 31.41 142.80 154.25 5.73 336.8 2.1 27.63 162.36 174.21 5.92 336.9 1.8 23.84 177.83 189.98 6.08 337.0 1.5 20.05 189.32 201.67 6.17 337.0 1.2 16.26 196.92 209.37 6.23 337.1 0.9 12.48 200.68 213.19 6.25 337.1 0.6 8.69 200.66 213.16 6.25 337.1 0.3 4.95 196.90 209.35 6.23 337.1 0.0 1.69 189.50 201.85 6.17 337.0 0.0 0.14 179.02 191.20 6.09 337.0 0.0 0.00 167.21 179.16 5.97 336.9 0.0 0.00 155.50 167.21 5.86 336.9 0.0 0.00 144.02 155.50 5.74 336.8 0.0 0.00 132.76 144.02 5.63 336.7 0.0 0.00 121.72 132.76 5.52 336.7 0.0 0.00 110.90 121.72 5.41 336.6 0.0 0.00 100.29 110.90 5.31 336.6 0.0 0.00 89.89 100.29 5.20 336.5 0.0 0.00 -79.84 89.89 5.03 336.4 0.0 0.00 70.13 79.84 4.85 336.3 0.0 0.00 60.75 70.13 4.69 336.3 0.0 0.00 51.69 60.75 4.53 336.2 0.0 0.00 42.93 51.69 4.38 336.1 0.0 6.3 337.08 3.0 0 w (/) ..J 0 <fl. I-0 e g: cfs 0.00 2.16 3.45 .. ·5.26 6.67 7.70 7.90 7.88 7.82 7.72 7.57 7.37 7.12 6.85 6.55 6.23 6.17 6.09 5.97 5.86 5.74 5.63 5.52 5.41 5.31 5.20 5.03 4.85 4.69 4.53 4.38 7.9 D.A.# >< w 9.8 10.0 cfs 9.8 0115-dra.xls Exhibit D-1 0.0 1.0 2.0 2.9 3.9 4.9 5.9 6.9 7.8 8.8 9.8 9.3 8.8 8.3 7.8 7.4 6.9 6.4 5.9 5.4 4.9 4.4 3.9 3.4 2.9 2.5 2.0 1.5 1.0 0.5 0.0 ~ D.A.# D.A. # D.A. # 'II: ~ 0 c. w !'!! z OJ iii 0 .. ::i! 'C .... N >-0' 0 0 x: (/) (/) 0 Qp 18.1 5.7 Tc 5.7 5.3 inc 1.0 2.0 Time cfs cfs 0.0 0.0 0.0 0.0 1.0 3.2 1.1 4.3 2.0 6.4 2.2 8.5 3.0 9.5 3.2 12.8 4.0 12.7 4.3 17.0 5.0 15.9 5.4 21.3 6.0 17.6 5.3 22.9 7.0 16.0 4.8 20.8 8.0 14.4 4.2 18.7 9.0 12.9 3.7 16.6 10.0 11.3 3.2 14.4 11.0 9.7 2.6 12.3 12.0 8.1 2.1 10.2 13.0 6.5 1.6 8.1 14.0 4.9 1.0 5.9 15.0 3.3 0.5 3.8 16.0 1.7 0.0 1.7 17.0 0.2 0.0 0.2 18.0 0.0 0.0 0.0 19.0 0.0 0.0 0.0 20.0 0.0 0.0 0.0 21.0 0.0 0.0 0.0 22.0 0.0 0.0 0.0 23.0 0.0 0.0 0.0 24.0 0.0 0.0 0.0 25.0 0.0 0.0 0.0 26.0 0.0 0.0 0.0 27.0 0.0 0.0 0.0 28.0 0.0 0.0 0.0 29.0 0.0 0.0 0.0 30.0 0.0 0.0 0.0 PEAK FLOWS I 17.6 5.4 22.9 0.00 indicates inital condition EXHIBIT "D-1" PROPOSED DETENTION POND ROUTING St. Mary's Parking Lot Pond Routina EVENT= 10 D.A.# c: a .;t c: c: .... a :e .2 "' + ,.!.. .... .... 'C n; "' c: + "' + :e c: + c: > g; (/) (/) c: 0 .!! c: N N a c.. w m 3.3 5.0 cfs cfs cfs cfs ft cfs 4.25 0.00 0.00 0.00 335.2 0.0 12.75 1.04 4.25 1.60 335.4 0.7 21.25 8.99 13.80 2.41 335.6 1.3 29.76 22.67 30.24 3.79 335.9 2.0 38.26 43.65 52.42 4.39 336.1 2.7 44.20 72.12 81.90 4.89 336.4 3.3 43.77 105.61 116.33 5.36 336.6 3.0 39.52 138.02 149.38 5.68 336.8 2.7 35.27 165.62 177.53 5.96 336.9 2.3 31.02 188.55 200.89 6.17 337.0 2.0 26.77 206.98 219.57 6.30 337.1 1.7 22.51 220.95 233.74 6.39 337.2 1.3 18.26 230.54 243.47 6.46 337.2 1.0 14.01 235.81 248.81 6.50 337.2 0.7 9.76 236.81 249.82 6.51 337.2 0.3 5.56 233.60 246.57 6.48 337.2 0.0 1.91 226.30 239.17 6.43 337.2 0.0 0.16 215.50 228.21 6.36 337.1 0.0 0.00 203.12 215.65 6.27 337.1 0.0 0.00 190.75 203.12 6.18 337.0 0.0 0.00 178.58 190.75 6.09 337.0 0.0 0.00 166.65 178.58 5.97 336.9 0.0 0.00 154.95 166.65 5.85 336.9 0.0 0.00 143.47 154.95 5.74 336.8 0.0 0.00 132.23 143.47 5.62 336.7 0.0 0.00 121.20 132.23 5.51 336.7 0.0 0.00 110.39 121.20 5.41 336.6 0.0 0.00 99.79 110.39 5.30 336.6 0.0 0.00 89.40 99.79 5.19 336.5 0.0 0.00 79.37 89.40 5.02 336.4 0.0 0.00 69.67 79.37 4.85 336.3 0.0 6.5 337.24 3.3 0 w (/) _. 0 c( c.. I-0 e it cfs 0.00 2.27 3.74 5.78 7.05 8.22 8.35 8.34 8.29 8.16 7.96 7.73 7.46 7.16 6.84 6.48 6.43 6.36 6.27 6.18 6.09 5.97 5.85 5.74 5.62 5.51 5.41 5.30 5.19 5.02 4.85· 8.4 D.A.# >< w 11.0 10.0 cfs 0.0 1.1 2.2 3.3 4.4 5.5 6.6 7.7 8.8 9.9 11.0 10.5 9.9 9.4 8.8 8.3 7.7 7.2 6.6 6.1 5.5 5.0 4.4 3.9 3.3 2.8 2.2 1.7 1.1 0.6 0.0 11.0 0115-dra.xls Exhibit D-1 ! D.A.# D.A. # D.A.# 'II: .s:: c a. w ta ... 2 Cl iii 0 ... :F! "C .... N >. c c 0 :::c: (/) (/) 0 Qp 20.8 6.5 Tc 5.7 5.3 inc 1.0 2.0 Time cfs cfs 0.0 0.0 0.0 0.0 1.0 3.6 1.2 4.9 2.0 7.3 2.5 9.8 3.0 10.9 3.7 14.6 4.0 14.6 4.9 19.5 5.0 18.2 6.1 24.4 6.0 20.3 6.1 26.3 7.0 18.4 5.5 23.9 8.0 16.6 4.8 21.4 9.0 14.8 4.2 19.0 10.0 13.0 3.6 16.6 11.0 11.1 3.0 14.1 12.0 9.3 2.4 11.7 13.0 7.5 1.8 9.3 14.0 5.7 1.2 6.8 15.0 3.8 0.6 4.4 16.0 2.0 0.0 2.0 17.0 0.2 0.0 0.2 18.0 0.0 0.0 0.0 19.0 0.0 0.0 0.0 20.0 0.0 0.0 0.0 21.0 0.0 0.0 0.0 22.0 0.0 0.0 0.0 23.0 0.0 0.0 0.0 24.0 0.0 0.0 0.0 25.0 0.0 0.0 0.0 26.0 0.0 0.0 0.0 27.0 0.0 0.0 0.0 28.0 0.0 0.0 0.0 29.0 0.0 0.0 0.0 30.0 0.0 0.0 0.0 PEAK FLOWS 20.3 6.1 26.3 0.00 indicates inital condition EXHIBIT "D-1" PROPOSED DETENTION POND ROUTING St Mary's Parking Lot Pond Routina EVENT= 25 D.A.# c: a t. c: c: .... ~ !2 .2 Cll + .... "C '1ii Cll c: + .... ta + !2 c: + c: > a. (/) (/) c: o~ >. -= N N a a.. w al 3.8 5.0 cfs cfs cfs cfs ft cfs 4.88 0.00 0.00 0.00 335.2 0.0 14.63 1.56 4.88 1.66 335.4 0.8 24.38 10.98 16.19 2.61 335.6 1.5 34.13 27.16 35.36 4.10 336.0 2.3 43.88 52.21 61.29 4.54 336.2 3.0 50.70 85.82 96.09 5.13 336.5 3.8 50.21 125.41 136.52 5.56 336.7 3.4 45.33 163.75 175.62 5.94 336.9 3.0 40.46 196.63 209.08 6.22 337.1 2.7 35.58 224.25 237.09 6.42 337.2 2.3 30.71 246.69 259.84 6.58 337.3 1.9 25.83 264.00 277.39 6.70 337.4 1.5 20.96 276.26 289.83 6.78 337.4 1.1 16.08 283.54 297.21 6.84 337.4 0.8 11.20 285.92 299.62 6.85 337.5 0.4 6.39 283.45 297.12 6.84 337.4 0.0 2.19 276.27 289.84 6.78 337.4 0.0 0.18 265.05 278.46 6.71 337.4 0.0 0.00 252.01 265.23 6.61 337.3 0.0 0.00 238.96 252.01 6.52 337.3 0.0 0.00 226.10 238.96 6.43 337.2 0.0 0.00 213.42 226.10 6.34 337.1 0.0 0.00 200.91 213.42 6.25 337.1 0.0 0.00 188.58 200.91 6.17 337.0 0.0 0.00 176.45 188.58 6.06 337.0 0.0 0.00 164.56 176.45 5.95 336.9 0.0 0.00 152.90 164.56 5.83 336.8 0.0 0.00 141.46 152.90 5.72 336.8 0.0 0.00 130.26 141.46 5.60 336.7 0.0 0.00 119.27 130.26 5.49 336.7 0.0 0.00 108.49 119.27 5.39 336.6 0.0 6.9 337.46 3.8 c w (/) ...I 0 ~a.. ... 0 0 a: Fm a.. cfs 0.00 2.41 4.12 ·6.37 7.57 8.92 8.97 8.97 8.88 8.69 8.47 8.21 7.92 7.59 7.23 6.84 6.78 6.71 6.61 6.52 6.43 6.34 6.25 6.17 6.06 5.95 5.83 5.72 5.60 5.49 5.39 9.0 D.A.# )( w 12.6 10.0 cfs 0.0 1.3 2.5 3.8 5.0 6.3 7.5 8.8 10.1 11.3 12.6 11.9 11.3 10.7 10.1 9.4 8.8 8.2 7.5 6.9 6.3 5.7 5.0 4.4 3.8 3.1 2.5 1.9 1.3 0.6 0.0 12.6 0115-dra.xfs Exhibit D-1 ~ EXHIBIT "D-1" PROPOSED DETENTION POND ROUTING St. Mary's Parking Lot D.A. # D.A.# D.A.# Pond Routing EVENT= 50 D.A.# D.A.# :ii: c: J::. c CJ c Q. "' w z c: w .. z c: 32 0 en Cl iii ..... CJ Ill ...J 0 0 + ..... ;: Ill .. ~ c: .:. + ..... ,, "' "' ct 0.. ,, ..... N + 32 c: + c: > g; r-0 >. c c 0 en en c: 0 .!! 0 0:: >< :I: en en 0 c: N N CJ 0.. w IX) ... 0.. w Qp 22.4 6.9 4.3 14.2 Tc 5.7 5.3 5.0 10.0 inc 1.0 2.0 Time cfs cfs cfs cfs cfs cfs ft cfs cfs cfs i 0.0 0.0 0.0 0.0 5.23 0.00 0.00 0.00 335.2 0.0 0.00 0.0 1.0 3.9 1.3 5.2 15.70 1.86 5.23 1.69 335.4 0.9 2.54 1.4 2.0 7.9 2.6 10.5 26.16 12.11 17.55 2.72 335.7 1.7 4.43 2.8 3.0 11.8 3.9 15.7 36.62 29.97 38.27 4.15 336.0 2.6 6.71 4.3 4.0 15.7 5.2 20.9 47.09 57.34 66.60 4.63 336.2 3.4 8.05 5.7 5.0 19.6 6.5 26.2 54.41 93.94 104.42 5.24 336.5 4.3 9.51 7.1 6.0 21.8 6.4 28.3 53.89 137.01 148.35 5.67 336.8 3.8 9.52 8.5 7.0 19.8 5.8 25.6 48.66 178.73 190.90 6.09 337.0 3.4 9.50 9.9 8.0 17.9 5.1 23.0 43.43 214.69 227.39 6.35 337.1 3.0 9.34 11.4 9.0 15.9 4.5 20.4 38.20 244.99 258.12 6.56 337.3 2.6 9.13 12.8 10.0 14.0 3.8 17.8 32.97 269.71 283.19 6.74 337.4 2.1 8.87 14.2 11.0 12.0 3.2 15.2 27.74 288.93 302.68 6.87 337.5 1.7 8.58 13.5 12.0 10.0 2.5 12.6 22.50 302.33 316.67 7.17 337.5 1.3 8.45 12.8 13.0 8.1 1.9 9.9 17.27 309.96 324.84 7.44 337.6 0.9 8.29 12.1 14.0 6.1 1.2 7.3 12.04 312.19 327.23 7.52 337.6 0.4 7.95 11.4 15.0 4.1 0.6 4.7 6.87 309.39 324.23 7.42 337.6 0.0 7.42 10.7 16.0 2.2 0.0 2.2 2.36 301 .95 316.26 7.15 337.5 0.0 7.15 9.9 9.2 17.0 0.2 0.0 02 0.20 290.54 304.31 6.89 337.5 0.0 6.89 0.0 6.79 8.5 18.0 0.0 0.0 0.0 0.00 2n.16 290.74 6.79 337.4 7.8 337.4 0.0 6.70 19.0 0.0 0.0 0.0 0.00 263.76 277.16 6.70 7.1 0.00 250.56 263.76 6.60 337.3 0.0 6.60 20.0 0.0 0.0 0.0 6.51 6.4 0.0 0.00 237.53 250.56 6.51 337.2 0.0 5.7 21.0 0.0 0.0 6.42 0.0 0.00 224.69 237.53 6.42 337.2 0.0 5.0 22.0 0.0 0.0 337.1 0.0 6.33 0.0 0.0 0.00 212.03 224.69 6.33 4.3 23.0 0.0 6.24 337.1 0.0 6.24 0.0 0.0 0.0 0.00 199.54 212.03 6.16 3.6 24.0 187.23 199.54 6.16 337.0 0.0 2.8 15.0 0.0 0.0 0.0 0.00 0.0 6.05 175.12 187.23 6.05 337.0 2.1 26.0 0.0 0.0 0.0 0.00 5.93 336.9 0.0 5.93 I 0.00 163.26 175.12 5.82 1.4 0.0 0.0 0.0 27.0 0.0 163.26 5.82 336.8 0.7 0.0 0.0 0.0 0.00 151 .62 336.8 0.0 5.70 28.0 151 .62 5.70 0.0 0.0 0.00 140.22 0.0 5.59 29.0 0.0 0.0 0.00 129.03 140.22 5.59 336.7 30.0 0.0 0.0 0.0 9.5 14.2 EAKFLOWS 7.5 337.57 4.3 I 21 .6 I 6.5 28.3 D. D.A.# D.A. # 'II: ~ c.. "' ... t7I 0 0 w z iii ... 'g. ~ N 0 0 :I: en 0 Qp 1.6 8.2 Tc .7 5.3 inc .0 2.0 Time cfs 0.0 .0 0.0 0.0 1.0 7 1.5 6.2 2.0 3 3.1 12.4 3.0 0 4.6 18.6 4.0 7 6.2 24.9 5.0 3 7.7 31.1 6.0 9 7.7 33.6 7.0 ) 6.9 30.5 8.0 ! 6.1 27.3 9.0 l 5.3 24.2 10.0 ; 4.6 21.1 11.0 ~ 3.8 18.0 12.0 I 3.0 14.9 13.0 2.2 11.8 14.0 1.5 8.7 15.0 0.7 5.6 16.0 0.0 2.6 17.0 0.0 0.2 18.0 0.0 0.0 19.0 0.0 0.0 20.0 0.0 0.0 21.0 0.0 0.0 22.0 I 0.0 0.0 23.0 0.0 0.0 24.0 0.0 0.0 25.0 I 0.0 0.0 26.0 I 0.0 0.0 27.0 0.0 0.0 28.0 i 0.0 0.0 29.0 I 0.0 0.0 30.0 0.0 0.0 PEAK FLOWS 2! 7.7 33.6 0.00 indicates inital condition EXHIBIT "D-1" PROPOSED DETENTION POND ROUTING St. Mary's Parking Lot Pond Routing EVENT= 100 D.A.# c: a .;!:. c: c: ..... ~ :e .E Cll + ..... "C 1ii Cll c: + ..... "' + :e c: + c: > c.. en en c: 0 .!! >-c: N N a a. w m 4.8 5.0 cfs cfs cfs cfs ft cfs 6.21 0.00 0.00 0.00 335.2 0.0 18.64 2.68 6.21 1.77 335.4 1.0 31.07 15.24 21.32 3.04 335.7 1.9 43.50 37.74 46.31 4.29 336.1 2.9 55.92 71.48 81.24 4.88 336.4 3.8 64.63 116.47 127.41 5.47 336.6 4.8 64.01 169.12 181.10 5.99 336.9 4.3 57.80 220.35 233.13 6.39 337.2 3.8 51.58 264.74 278.14 6.70 337.4 3.3 45.37 302.01 316.32 7.15 337.5 2.9 39.15 330.98 347.38 8.20 337.6 2.4 32.94 352.21 370.14 8.96 337.7 1.9 26.73 366.22 385.15 9.47 337.8 1.4 20.51 373.49 392.95 9.73 337.8 1.0 14.30 374.48 394.01 9.76 337.8 0.5 8.16 369.60 388.78 9.59 337.8 0.0 2.80 359.33 377.76 9.22 337.8 0.0 0.23 344.74 362.13 8.69 337.7 0.0 0.00 328.74 344.97 8.12 337.6 0.0 0.00 313.60 328.74 7.57 337.6 0.0 0.00 299.47 313.60 7.06 337.5 0.0 0.00 285.77 299.47 6.85 337.5 0.0 0.00 272.26 285.77 6.76 337.4 0.0 0.00 258.93 272.26 6.66 337.3 0.0 0.00 245.79 258.93 6.57 337.3 0.0 0.00 232.83 245.79 6.48 337.2 0.0 0.00 220.06 232.83 6.39 337.2 0.0 0.00 207.46 220.06 6.30 337.1 0.0 0.00 195.03 207.46 6.21 337.1 0.0 0.00 182.78 195.03 6.13 337.0 0.0 0.00 170.77 182.78 6.01 336.9 0.0 9.8 337.82 4.8 0 w en ...J 0 ex: a. .... 0 0 0:: .... a. cfs 0.00 2.72 4.95 ·7.15 8.70 10.25 10.30 10.22 10.05 10.02 10.59 10.87 10.90 10.68 10.24 9.59 9.22 8.69 8.12 7.57 7.06 6.85 6.76 6.66 6.57 6.48 6.39 6.30 6.21 6.13 6.01 10.9 D.A.# )( w 16.0 10.0 cfs 0.0 1.6 3.2 4.8 6.4 8.0 9.6 11.2 12.8 14.4 16.0 15.2 14.4 13.6 12.8 12.0 11.2 10.4 9.6 8.8 8.0 7.2 6.4 5.6 4.8 4.0 3.2 2.4 1.6 0.8 0.0 16.0 0115-<lra.x!s Exhibit D-1 f~ ~ St. Mary's Parking Lot 5 Year Event Hydrograph 12.00 ~--------------------------------~ 10.00 8.00 I I I I ~ 6.00 -I a I I I I I 4.00 I I I I I I 2.00 I I I I I I ' 0.00 --------------1---------+-----------......... -----------1 0.00 5.00 10.00 15.00 20.00 Time(min.) 25.00 30.00 35.00 40.00 --TOTAL PROPOSED - - -TOTAL EXISTING 4/26/2002 Exhibit D-2 St. Mary's Parking Lot 10 Year Event Hydrograph 12.00 -r--------------------------------------., 10.00 8.00 ~ 6.00 -a 4.00 2.00 I I I I I I I I I I I I I I I I I I I I I I I I I I I I \ \. '\ '\ '\ '\ '\ '\ '\ '\ '\ \ \ \ '\ \ \ \ \ '\ \ \ \ '\ \ \ \ '\ \ '\ \ '\ \ \ \ '\ \ \ 0.00+-----+-----+-----+-----+------lf------>t-----+-------l 0.00 5.00 10.00 15.00 20.00 Time(min.) 25.00 30.00 35.00 40.00 --TOTAL PROPOSED ---TOTAL EXISTING 4/26/2002 Exhibit 0-2 St. Mary's Parking Lot 25 Year Event Hydrograph 14.00 -.----------------------------------------. 12.00 10.00 8.00 6.00 - I I I 4.00 I I I I I I 2.00 I I I I I I I I I I I I I I I I I I I \ '\ '\ \ \ '\ '\ '\ '\ \ \ '\ '\ \ \ '\ '\ \ '\ '\ '\ '\ \ \ '\ '\ \ \ '\ '\ \ \ '\ '\ \ \ ' ' o.oo~----+-----+------;------+-----t-------------------.. 0.00 5.00 10.00 15.00 20.00 Time(min.) 25.00 30.00 35.00 40.00 ~--TOTAL PROPOSED - - -TOTAL EXISTING 4/26/2002 Exhibit D-2 ~ ~ a -- St. Mary's Parking Lot 50 Year Event Hydrograph 16.00 -...-----------------------------------------. 14.00 12.00 - 10.00 8.00 6.00 I I I I I 4.00 -I I I I 2.00 I I I 'I I I I I I I I I I I I I I I I ' '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ ', '\ '\ '\ '\ '\ '\ '\ ', '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ \ ' 0.00 +------l-----+-----+-----+------+-----"l------+------1 0.00 5.00 10.00 15.00 20.00 Time(mln.) 25.00 30.00 35.00 40.00 ~--TOTAL PROPOSED - - -TOTAL EXISTING 4/26/2002 Exhibit D-2 - St. Mary's Parking Lot 100 Year Event Hydrograph 18.00 -....-----------------------------------------. 16.00 14.00 12.00 10.00 8.00 - I I 6.00 I I I I 4.00 I I I I I 2.00 I '/ I I I I I I I I I I I I I I I \ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ '\ \ ' 0.00 -----------;----------+------------"'!------------1 0.00 5.00 10.00 15.00 20.00 Time (min.) 25.00 30.00 35.00 40.00 ---TOTAL PROPOSED - - -TOT AL EXISTING 4/26/2002 Exhibit D-2 0.400 0.350 0.300 ~ 0.250 c:i .!!. QI Cl ~ 0 (;; 0.200 0.150 0.100 0.050 - St. Mary's Parking Lot Stage-Storage Curve 0.000+-~_._.._..=--+-~~~~~-+-~~~~~-+~~~~~~+--~~~~~-+-~~~~~-+-~~~~~-+~~~~~--l 335 335.5 336 336.5 337 Elevation (msl) 337.5 338 338.5 339 Exhibit 0-3 ~ GI ~ 25.000 .c ~ c - St. Mary's Parking Lot Stage-Discharge Curve 0.000-t-~-.'---~~-t-~~~~~-t-~~~~~-+~~~~~--;~~~~~~+-~~~~~-t-~~~~~-t-~~~~~~ 335.0 335.5 336.0 . 336.5 337.0 Elevation (msl) 337.5 338.0 338.5 339.0 Exhibit 0-3