MEMORANDUM
August 24, 2012
TO: Veronica Morgan, P.E., via e-mail: v(cDmitchellandmorgan.com
FROM: Jason Schubert, AICP
Principal Planner
SUBJECT: LAKERIDGE TOWNHOMES (FP-REPLAT)
I reviewed the above -mentioned FINAL PLAT application and determined it to be incomplete.
The following is the preliminary list of items needed to complete the submittal so that staff may
conduct a thorough review. Please submit the following information by 10 a.m. on any Monday
for review that week:
As part of the proposed plat is a tract and a subdivision of land occurs, submit
a Preliminary Plan application for the subject properties. Please note that this
final plat application can be forwarded for review after the Preliminary Plan,
without waivers, is scheduled for Planning & Zoning Commission consideration;
Provide the $600 application fee for the Development Permit (DP); and
Provide two sets of civil construction documents with supporting documents for
the proposed public infrastructure.
Please be aware that if this application is not completed before Monday, October 22, 2012, i
will expire and a new application and fees will be necessary to continue the platting process.
If you have any questions or need additional information, please call me at 979.764.3570.
cc: Case file No. 12-00500184
Jim Stewart, via e-mail: limbstewart(cDgmial.com
(*1`
CITY OF COLLEGE STATION
Home ofT"x AeW Univmiry'
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
December 10, 2012
TO: Veronica Morgan, Mitchell & Morgan, LLC; via email: v@mitchellandmorgan.com
FROM: Morgan Hester, Staff Planner
SUBJECT: LAKERIDGE TOWNHOMES (FP - Replat)
Staff reviewed the above -mentioned Final Plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Once all comments have been
addressed and the following information submitted by 10:00 a.m. on any Monday, your project
will be placed on the next available Planning and Zoning Commission meeting:
One (1) 24"x36" copy of the revised final plat;
Thirteen (13) 11 "x17" copies of the revised final plat;
One (1) copy of the digital file of the final plat on diskette or e-mail to
pdsdigitalsubmittal(cDcstx.gov.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. If all comments have not been
addressed your project will not be scheduled for a Planning & Zoning Commission meeting.
Your project may be placed on a future agenda once all the revisions have been made. Once
your item has been scheduled for the P&Z meeting, the agenda and staff report can be
accessed at the following web site on Monday the week of the P&Z meeting.
http://www.csb(.gov/pz
Please note that a Mylar original of the revised final plat will be required after P&Z approval and
prior to processing subsequent final plats. If you have any questions or need additional
information, please call me at 979.764.3570.
Attachments: Staff Review Comments
cc: Jim Stewart, Lakeridge Living, LP; via email: jimstewart@gmail.com
Case file #12-00500184
STAFF REVIEW COMMENTS NO. 2
Project: LAKERIDGE TOWNHOMES (FP) — (12-00500184)
ENGINEERING
1. Final Plat — Please provide a 7.5-ft PUE along the northern property line near Holleman Dr.
rather than the 5-ft PUE labeled.
2. Final Plat — It is apparent that access will be shared with Lot 2 along Hollemen Dr. Please
show a cross -access easement to this lot.
3. (Repeat) Please provide a cost estimate for the waterline, letter of acknowledgement, NOI,
and water/fire flow report. FYI ... The NOI may be submitted by the contractor when the
DP is signed.
4. (Repeat) TxDOT permits will be required for the sidewalk within the TxDOT right-of-way.
Please submit 5 copies of the plans and application. FYI ... The plans will be approved
conditionally. No work may commence in TxDOT right-of-way until TxDOT permits
are issued.
5. (Repeat) Add a note at the water/sanitary sewer crossing noting TCEQ requirements.
Please add a note to center a joint of waterline at the sanitary sewer crossing.
6. (Repeat) Sh.01 — Please provide plans for the water looping between the existing waterlines
within the Lakeridge development to the existing waterline along the east side of Holleman
Dr. We need to avoid having dead-end lines without means of flushing the lines.
Please end the lines with blow -offs or end them at the tee/fire hydrant.
7. (Repeat) C1 — Please extend the sidewalk to the edge of the property line and to the signal
at FM 2818. Please extend the sidewalk to the north a little farther to the edge of the
northern property line (or rather the projection of the property line into the ROW).
8. (Repeat) FYI... Additional Development Permit Fee in the amount of 1 % of the total public
infrastructure cost will be required. Based on the current cost estimate, the DP fee
balance is $357.43. If the plans and cost estimate change in any way, this fee balance
will need to be adjusted as well.
9. (Repeat) FYI ... All public infrastructure required for the plat will need to be built or surety
provided for it prior to the plat being scheduled for P&Z. We currently have surety for part
of the sidewalk from the previous final plat ($35,040). Based on the current cost
estimate of $95,743.85, the balance of the surety that needs to be provided for the plat
is $60,703.85. This surety needs to be provided no later than Friday, December 14 in
order to remain on the December 20' P&Z meeting agenda.
10. (Repeat) FYI... The signed & sealed construction plans will be required for stamping.
Reviewed by: Erika Bridges Date: December 7, 2012
(*1`
CITY OF COLLEGE STATION
Home ofT"x AeW Univmiry'
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
November 12, 2012
TO: Veronica Morgan, Mitchell & Morgan, LLC; via email: v@mitchellandmorgan.com
FROM: Morgan Hester, Staff Planner
SUBJECT: LAKERIDGE TOWNHOMES (FP - Replat)
Staff reviewed the above -mentioned Final Plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Once all comments have been
addressed and the following information submitted by 10:00 a.m. on any Monday, your project
will be placed on the next available Planning and Zoning Commission meeting:
One (1) 24"x36" copy of the revised final plat;
Thirteen (13) 11 "x17" copies of the revised final plat;
One (1) copy of the digital file of the final plat on diskette or e-mail to
pdsdigitalsubmittal(cDcstx.gov.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. If all comments have not been
addressed your project will not be scheduled for a Planning & Zoning Commission meeting.
Your project may be placed on a future agenda once all the revisions have been made. Once
your item has been scheduled for the P&Z meeting, the agenda and staff report can be
accessed at the following web site on Monday the week of the P&Z meeting.
http://www.csb(.gov/pz
Please note that a Mylar original of the revised final plat will be required after P&Z approval and
prior to processing subsequent final plats. If you have any questions or need additional
information, please call me at 979.764.3570.
Attachments: Staff Review Comments
cc: Jim Stewart, Lakeridge Living, LP; via email: jimstewart@gmail.com
Case file #12-00500184
STAFF REVIEW COMMENTS NO. 1
Project: LAKERIDGE TOWNHOMES (FP) — (12-00500184)
PLANNING
Please remove/revise the 'person(s)', 'name(s)', 'is/are', 'he/they' from the Certificates of
Ownership and Dedication.
The Approval of Planning and Zoning Commission should read "Certificate of Planning and
Zoning Commission". Please revise.
Please provide the ownership information for the Abandoned RR ROW.
Note: Any changes made to the plans which have not been requested by the City of College
Station, much be explained in your next transmittal letter and "bubbled" on your plans. Any
additional changes on these plans that have not been pointed out to the City will constitute a
completely new review.
Reviewed by: Morgan Hester
ENGINEERING COMMENTS NO. 1
Date: October 29, 2012
Please provide a cost estimate for the waterline, letter of acknowledgement, NOI, and
water/fire flow report.
TxDOT permits will be required for the sidewalk within the TxDOT right-of-way. Please
submit 5 copies of the plans and application.
Add a note at the water/sanitary sewer crossing noting TCEQ requirements.
The development permit for the sidewalks along FM 2818 has expired, so plans need to be
resubmitted for review.
5. Please include all applicable City standard details in the plans.
6. Sh.01 — Please provide plans for the water looping between the existing waterlines within
the Lakeridge development to the existing waterline along the east side of Holleman Dr.
7. Sh.01 — It looks like some of the lines denoting PUEs are missing.
8. Sh.01 — Provide a PUE for the proposed fire hydrant.
9. C1 — Please extend the sidewalk to the edge of the property line and to the signal at FM
2818.
10. C1 — The maximum commercial driveway width is 36-ft. Please revise.
11. FYI... Additional Development Permit Fee in the amount of 1% of the total public
infrastructure cost will be required.
12. FYI ... All public infrastructure required for the plat will need to be built or surety provided for it
prior to the plat being scheduled for P&Z.
13. FYI... The signed & sealed construction plans will be required for stamping.
Reviewed by: Erika Bridges Date: November 5, 2012
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version
of plat and / or site plan as soon as it is available. Email to: sweido(cDcstx.gov.
LOAD DATA: The developer will provide load data to CSU as soon as it is available. This
information is critical for CSU to accurately determine the size and number of transformers,
and other equipment, required to provide service to the project. Failure to provide load data
will result in construction delays and, due to clearance requirements, could affect the final
building footprint. Delivery time for transformers and other equipment not in stock is
approximate 26 weeks.
3. EASEMENTS: Developer provides temporary blanket easement for construction purposes
and upon completion of project must provide descriptive easements for electric infrastructure
as designed by CSU.
4. EASEMENTS: Developer provides descriptive easements for electric infrastructure as
designed by CSU, as shown on plat or site plan.
5. If easements are existing, the developer will be responsible for locating easements on site to
insure that electrical infrastructure is installed within easement boundaries.
6. The following easements will be required:
7.5' PUE along both sides of NE & SE property lines of Lot 2 Block 1.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
2. CSU will provide drawings for electrical installation.
3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser.
4. Developer will intercept existing conduit at designated transformers or other existing devices
and extend as required.
5. If conduit does not exist at designated transformer or other existing devices, developer will
furnish and install conduit as shown on CSU electrical layout.
6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other
device, per CSU specs and design.
7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull
boxes and secondary pedestals provided by CSU.
8. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing
as designed by CSU.
9. To discuss any of the above electrical comments please contact Sam Weido at
979.764.6314.
Reviewed by: Sam Weido Date: October 24, 2012
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: October 26, 2012
MITCHELL
MORGAN December 3, 2012
Morgan Hester
City of College Station
Planning and Development Services
P.O. Box 9960
College Station, TX 77842
Re: LAKERIDGE - Final Plat
Dear Morgan,
Attached, please find the following:
• One (1) 24 "x36" copy of the revised final plat;
• Thirteen (13) 11 "x17" copies of the revised final plat;
• One (1) copy of the digital file of the final plat on diskette or e-mail to
pdsdigitalsubmittal(a�cstx.gov.
• Waterline Cost estimate
• Letter of Acknowlegement for WL and FM 2818 Sidewalk
• Fire Flow report
• 5 copies FM 2818 sidewalk plans and TxDOT permit
• 5 copies Holleman sidewalk plans and TxDOT permit
• Holleman sidewalk cost estimate
• FM 2818 sidewalk cost estimate
• Letter of Acknowledgement for Holleman sidewalk
• 1 set of complete construction documents
STAFF REVIEW COMMENTS NO. 1
Project: LAKERIDGE TOWNHOMES (FP) — (12- 00500184)
PLANNING
1. Please remove /revise the 'person(s)', `name(s), `is /are, `he /they' from the Certificates of
Ownership and Dedication.
Response: This has been revised
2. The Approval of Planning and Zoning Commission should read "Certificate of Planning and
Zoning Commission ". Please revise.
Response: This has been revised
3. Please provide the ownership information for the Abandoned RR ROW.
Response: The ownership has now been added to the plat.
511 UNIVERSITY DRIVE EAST, SUITE 204 • COLLEGE STATION, TX 77840 • T 979.260.6963 • F 979.260.3564
CIVIL ENGINEERING • HYDRAULICS • HYDROLOGY • UTILITIES • STREETS • SITE PLANS SUBDIVISIONS
I nfo@mitchellandmorgan.com • www.mitchellandmorgan.com
4. Note: Any changes made to the plans which have not been requested by the City of College
Station, much be explained in your next transmittal letter and "bubbled" on your plans. Any
additional changes on these plans that have not been pointed out to the City will constitute a
completely new review.
Response: Understood
ENGINEERING COMMENTS NO. 1
1. Please provide a cost estimate for the waterline, letter of acknowledgement, NOI, and
water /fire flow report.
Response: The cost estimate for the waterline, letters of acknowledgement for FM 2818, the
waterline, Holleman sidewalk, and the fire flow report are attached. The NOl will be submitted by
the contractor.
2. TxDOT permits will be required for the sidewalk within the TxDOT right -of -way. Please
submit 5 copies of the plans and application.
Response: Both the Holleman and 2818 sidewalk plans and permits are attached.
3. Add a note at the water /sanitary sewer crossing noting TCEQ requirements.
Response: The sewer crossing and note have been added.
4. The development permit for the sidewalks along FM 2818 has expired, so plans need to be
resubmitted for review.
Response: Plans are attached.
5. Please include all applicable City standard details in the plans.
Response: All standard details are now included.
6. Sh.01 — Please provide plans for the water looping between the existing waterlines within
the Lakeridge development to the existing waterline along the east side of Holleman Dr.
Response: As discussed, the waterline looping will be submitted with the next phase of the
Lakeridge Development.
7. Sh.01 — It looks like some of the lines denoting PUEs are missing.
Response: This has been fixed.
8. Sh.01 — Provide a PUE for the proposed fire hydrant.
Response: A PUE has been added for the fire hydrant.
9. C1 — Please extend the sidewalk to the edge of the property line and to the signal at FM
2818.
Response: The sidewalk has been extended to the signal.
10. C1 — The maximum commercial driveway width is 36 - ft. Please revise.
Response: This has been revised.
11. FYI...Additional Development Permit Fee in the amount of 1% of the total public
infrastructure cost will be required.
Response: Understood.
12. FYI...All public infrastructure required for the plat will need to be built or surety provided for it
prior to the plat being scheduled for P &Z.
Response: Understood.
13. FYI...The signed & sealed construction plans will be required for stamping.
Response: All plans are now signed and sealed.
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. SITE PLAN /PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version
of plat and / or site plan as soon as it is available. Email to: sweido @cstx.gov.
Response: The revised plat has been emailed to Sam Weido.
2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This
information is critical for CSU to accurately determine the size and number of transformers,
and other equipment, required to provide service to the project. Failure to provide Toad data
will result in construction delays and, due to clearance requirements, could affect the final
building footprint. Delivery time for transformers and other equipment not in stock is
approximate 26 weeks.
Response: Understood.
3. EASEMENTS: Developer provides temporary blanket easement for construction purposes
and upon completion of project must provide descriptive easements for electric infrastructure
as designed by CSU.
Response: Understood.
4. EASEMENTS: Developer provides descriptive easements for electric infrastructure as
designed by CSU, as shown on plat or site plan.
Response: Understood.
5. If easements are existing, the developer will be responsible for locating easements on site to
insure that electrical infrastructure is installed within easement boundaries.
Response: Understood.
6. The following easements will be required:
• 7.5" PUE along both sides of NE & SE property lines of Lot 2 Block 1.
Response: These easements are now shown.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design
Response: Understood
2. CSU will provide drawings for electrical installation.
Response: Understood.
3. Developer provides 30" of rigid or IMC conduit for each riser conduit. CSU installs riser.
Response: Understood.
4. Developer will intercept existing conduit at designated transformers or other existing devices
and extend as required.
Response: Understood.
5. If conduit does not exist at designated transformer or other existing devices, developer will
furnish and install conduit as shown on CSU electrical layout.
Response: Understood.
6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other
device, per CSU specs and design.
Response: Understood.
7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull
boxes and secondary pedestals provided by CSU.
Response: Understood.
8. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing
as designed by CSU.
Response: Understood.
9. To discuss any of the above electrical comments please contact Sam Weido at
979.764.6314.
Response: Thanks.
SANITATION
1. Sanitation is ok with this project.
Response: Thanks.
If • u have any questions or comments, please feel free to call our office at 979 - 260 -6963.
Si •erely,
I' Iiit
Veronica J.B. ■ i •rga Pi ., C.F.M.
Managing Partner
Cc: File