Loading...
HomeMy WebLinkAboutFire Flow Test ReportFIRE FLOW TEST REPORT Date / (-7l y Location Flow Hydrant Desc. Nozzle size 2.5 Pilot Reading y O GPM �t� U13 Static Hydrant Desc. Static PSI (n 5 Residual PSI 4J2 COMMENTS: Title / — sf�5c N, P 3A ch Signature, Title Date RME CONSULTING ENGINEERS POST OFFICE BOX 9253 COLLEGE STATION, TEXAS 77842 OFF/FAX: (979) 690-0329 E-MAIL: CIVIL@RMENGINEER.COM Creek Meadows Subdivision— Section 4, Phase 3A & 4 Water & Sanitary Sewer Report RME Consulting Engineers September 5, 2012 TABLE #1 FLOW TEST DATA Flow Pilot Static Fire Static Residual Hydrant Reading Flow Hydrant Pressure Pressure No. Location(psi) m No.(psi) (si FH "A" Greens Prairie Trail 67 1360 Res. 74 70 Note: The reported flow is from the 2.5- nozzle otthe identified flow hydrant; LS Existing Sanitary Sewer Collection System: The proposed subdivision will be served by the existing sanitary sewer collection lines of the Castlegate Subdivision, Section 6. The proposed sanitary sewer collection system, for Section 4, Phase 3A & 4, will discharge into a collection system and Regional Lift Station, constructed in Section 1B. From the Regional Lift Station sanitary sewer is then pumped, via a 6" PVC force main, to the existing collection system of the Castlegate Subdivision. The Section IB sanitary sewer collection system, Regional Lift Station, and associated improvements, have been approved by the CoCS-Planning and Development Services and at the time of this report have been constructed, inspected and accepted by CoCS. 2.0 WATER SYSTEM IMPROVEMENTS 2.1 Proposed Water System Configuration: A existing 8" water line was installed and terminated with a blow -off valve at the existing north end of Lowry Meadow Lane (Section 4, Phase 213). This terminus was intended for the future extension of water distribution into the subject development. A proposed 8" water line, within the subject development, will be extended and connect to the existing 8" water line. The general requirements of the UTSDG for water line design layout are briefly listed as follows: • 4" water lines will be installed where the service length is less than or equal to five hundred (500') feet; 6" water lines may be allowed up to a maximum of 1,500 feet in length and must connect at each end to an 8 inch or larger main and shall have no more than 2 fire hydrants or flushing points. Where it is not possible to meet this requirement, a 6- inch main may be extended to a maximum of 800 feet in length and shall terminate with a fire hydrant or blow -off assembly; Fire hydrants will be installed so that no residence is greater than five hundred (500') from a hydrant. Each fire hydrant will be analyzed to provide a fire flow of 1,000 gpm. As mentioned earlier the water distribution system will provide fire protection and domestic water service. The Water System Map is included in the "Attachment" portion of this report and more fully details the proposed water system improvements. 260-0471 Water -Sewer Report-S4P3A-4 Page - 3 Creek Meadows Subdivision — Section 4, Phase 3A & 4 Water & Sanitary Sewer Report RME Consulting Engineers September 5, 2012 The proposed water lines, and appurtenances, will be constructed and installed in accordance with the UTSDG. Unless specifically identified on the Construction Drawings, the proposed water lines will be of type PVC AWWA C909 DR14 water line pipe. Public utility lines will be installed in existing public utility easements or placed in proposed public utility easements which will be dedicated by plat or by separate instruments. 2.2 Domestic Water Supply Requirements: An average daily water consumption of 1.5 gpm per connection or dwelling unit will be utilized for analysis of the proposed water distribution system at normal conditions. During static conditions a minimum 35 psi pressure rating will be maintained. 2.3 Fire Flow Requirements: The fire flow demand, for the proposed development, will require that each residence be protected by a minimum 1,000 gpm. During fire flow conditions the minimum static pressure shall not be less than 20 psi. 2.4 Hydraulic Modeling Methodology: As allowed in the UTSDG a water distribution computer model was used to determine pressure and flow results for the proposed water system. The hydraulic analysis and corresponding results were determined by using the KYPIPE hydraulic program, for water systems. Using the calculated domestic water demand and fire flow requirements, the proposed water system was analyzed, with KYPIPE, to determine if it met the minimum design criteria set forth in the UTSDG. These minimum criteria are summarized as follows. Since the irrigation is relatively small in comparison to other flows, and infrequent in use, it was not considered in the analysis. 1. Under normal flow conditions the residual pressures in the area, serviced by the proposed system, must meet TCEQ requirements at all times thus providing a minimum static pressure of 35 psi; 2. During fire flow conditions, the proposed system and adjacent infrastructure must provide the required fire flow with a minimum residual pressure of 20 psi; 3. At all analyzed conditions, no water line shall have a velocity greater than 12 fps in both existing and proposed mains; 2.5 Modeling Results & Conclusions: Utilizing the original KYPIPE model and expanding it to include Section 4, Phase 3A & 4 water demands, and fire flow requirements, for the proposed water system improvements, and adjacent infrastructure, it was determined to adequately meet or positively exceed the minimum design standards. KYPIPE Hydraulic Analysis Data, resulting from both domestic water demands and all fire flow conditions are contained in this report in the "Attachment" portion. Resulting summary information for both conditions are illustrated below in Table #2 — Water System Summary and identify the "worse -case" location in the proposed distribution system (lowest pressure node or 260-0471 Water -Sewer Report-S4P3A-4 Page-4 Creek Meadows Subdivision — Section 4, Phase 3A & 4 Water & Sanitary Sewer Report 3.3 3.4 RME Consulting Engineers September 5, 2012 TABLE #3 - SANITARY SEWER FLOWS Average Average our Daily Flow Dwelling Daily Flow Peak Flow Peak Flow Section/Phase (gpd/cap) Units (gpd) (gph) (cfs) Sec. 1A, Ph. 1 & 2 100 96 25,632 4,272 0.16 Sec.1B, Phase 1-4 100 112 29,904 4,984 0.19 Sec. 2, Ph 1A,1B, & 3 100 89 23,763 3,961 0.15 Sec. 4, Ph 3A &.4 100 39 10,413 1,736 0.06 Sec. 5, Ph 1 100 32 8,544 1,424 0.05 Sec. 4, Ph 1, 2A, 2C 100 73 19,491 3,249 0.12 TOTAL EXPECTED FLOWS = 117,747 19,625 0.73 Flow Determination Notes: 1) Residential density is at 2.67 capita/Dwelling Unit; 2) Commercial uses were estimated at 30 capita/acre; 3) Average Daily flows, for each use, were assigned per Table III -"Average Wastewater Generations" per the UTSDS; 4) Peaking factor of 4.0 was applied to the Average Daily Flows to determine the Peak Flow which is used for line sizing; Hydraulic Modeling & Methodology: As allowed in the UTSDG, a hydraulic computer model was used to determined flow results for the proposed sanitary sewer collection lines. The hydraulic analysis and corresponding results were determined by using the WINSTORM hydraulic program, for stormwater modeling. Though this TxDOT program's typical use is for modeling gravity stormwater systems it can easily be applied for hydraulic modeling of gravity sewer systems. Peak sewer flows were directly inputted at manholes in lieu of flows being generated by hydrological equations at logical locations along the proposed sewer lines. Modeling Results & Conclusions: Using the original WINSTORM model and expanding it to include Creek Meadows — Section 4, Phase 3A & 4, sanitary sewer flows were input into the proposed sewer system and it was determined that the proposed expanded system has adequate capacity. WINSTORM Hydraulic Analysis Data, as resulting from sanitary sewer analysis, is contained in this report in the "Attachment" portion. Resulting summary information is illustrated below in Table #4 — Sanitary Sewer Summary. As report above in Table #3 there are 371 dwelling units either platted or permitted for platting (which includes Section 4, Phase 3A & 4). These dwelling units will be the equivalent of 0.73 cfs (327 gpm) at Peak Flow. The subdivision Lift Station has a firm pumping capacity of 315 gpm (and receiving system of Castle Gate) which is slightly less than the anticipated total Peak Flow of current development of the master planned subdivision. If a peaking factor of 3.85 is considered then this flow will be acceptable for the current pumping system. 260-0471 Water -Sewer Report-S4P3A-4 Page - 6 3800 S.H. No. 6 South, Ste.108G <77845> P.O. Box 9253, College Station, TX 77842 Off/Fax: (979) 764-0704 email: civil@rmengineer.com January 17, 2014 Ericka Bridges, E.I.T. Graduate Civil Engineer City of College Station Planning & Development Services 1101 Texas Avenue South College, Station, 77840 RE: Creek Meadows, Section 4, Phase 3A & 4 — College Station, TX Fire Flow Letter RME No. 260-0471 Ericka Bridges: A fire flow test was performed in accordance with National Fire Prevention Association (NFPA) Standard 291, Chapter 4, for the above referenced project, on January 17, 2014. The results of this test are shown on the attached Fire Flow Test Report, and are sufficient to meet the City of College Station minimum design standards for fire flow requirements. Please call should you have any questions or require assistance. Sincerely, i88583 .....,•Q. Rabon A. Metcalf, P.E. No. 88583 Texas Firm Registration No. F-4695 rabon@rmengineer.com CD1-260-0471-L10.doex Page 1 of I