MEMORANDUM
February 29, 2012
TO: RME Consulting Engineering, via email: rabon(cDrmengineer.com
FROM: Matt Robinson, AICP, Senior Planner
SUBJECT: Systek Computing Parking Expansion (Sp) - Site Plan
Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information by any Monday at 10:00 a.m. for further staff review:
City of College Station Transmittal Letter;
Memo providing written responses to all of staff's comments (identify the specific
page that each comment was addressed on or the reason for not addressing the
comment);
One (1) 11x17 grading and erosion control plan;
Four (4) revised site and one (1) landscaping plan;
Please note that this application will expire in 90 days from the date of this memo, if the
applicant has not provided written response comments and revised documents to the
Administrator that seek to address the staff review comments contained herein. If there are
comments that you are not addressing with the revised site plan, please attach a letter
explaining the details. If you have any questions or need additional information, please contact
Matt Robinson at 979.764.3570.
Attachments: Staff review comments
PC: Craig & Carol Investments, Ltd.; via email: craig(cDsystekmail.com
Case file #12-00500019
STAFF REVIEW COMMENTS NO. 1
Project: Systek Computing Parking Expansion (Sp) — 12-00500019
PLANNING
1. FYI, since the majority of this project was recently constructed a revised site plan would be
the easiest way to handle the addition. Landscaping points for the whole site can be used to
meet for the additional land included (if the landscaping points exceeded the original
required amount) in lieu of providing an additional 800 points (minimum required) for the
new phase.
2. Provide square footage of all new end islands.
3. Provide a detail for the proposed dumpster screening wall.
4. Provide volume and page number for the private cross access easement.
5. Illustrate the new electrical easement being provided with the Replat (covers the transformer
pad).
6. Illustrate the public access easement over the sidewalk along Park Place. This is being
added with the Replat.
7. FYI, site plan approval cannot be granted until the Replat has been approved and filed.
8. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not be made of aware of will
constitute a completely new review.
Reviewed by: Matt Robinson Date: 2/24/12
LANDSCAPING/STREETSCAPING/BUFFER
1. See Planning Comment #1. If separating into phases, a minimum of 800 landscaping points
are required for each phase (this will need to be revised on the landscape plan if proceeding
with phasing). Additionally, phase boundaries need to include the limits of construction (not
just the new portion of the lot that is being added with the replat).
2. If utilizing the whole site for landscaping points, please submit a revised landscape plan as
the original landscape plan was changed prior to CO.
3. Provide tree protection detail for those trees remaining on site that are adjacent to proposed
construction/disturbance areas.
4. As discussed previously with John Rhodes during CO of the site, provide shrubs all along
the northeast wall of the detention facility adjacent to the new drive aisle. These shrubs can
count towards landscaping point requirements.
Reviewed by: Matt Robinson Date: 2/24/12
ENGINEERING COMMENTS NO. 1 —Site Plan
1. Please add "floodway" to Note #1.
2. Please distinguish between the existing and proposed parking and detention pond on
the site plan.
3. Show and label the proposed Public Drainage Easement which will cover the
flood plain/floodway on -site.
4. Please identify the location of the floodplain/floodway in accordance with the LOMR and
topography of the land.
5. It appears that a portion of the parking lot and dumpster enclosure are encroaching into
the floodplain & floodway are and will need to be removed.
6. Show & label the proposed PUE for the existing electrical transformer. Please submit a
PUE dedication application prior to site plan approval.
7. Please add a note indicating that encroachment into the Floodway is not permitted. The
parking lot and retaining wall bordering the floodway should be constructed entirely from
the parking lot side of the wall to avoid encroachment into the floodway area.
8. FYI... Engineering construction plans and documents are still under review and may
affect the site plan.
Reviewed by: Erika Bridges
SANITATION
Date: 2/27/12
1. The dumpster pad needs to be turned 10 degrees clockwise in order for Sanitation
trucks to have a clear maneuvering path and clear access.
Reviewed by: Wally Urrutia
FIRE
Date: 2/24/12
1. Please contact Raymond Olsen in the Fire Marshall's office for any comments.
CITY OF COLLEGE STATION
Planning d Dem*pmem Seevien
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
March 5, 2012
TO: RME Consulting Engineers, Rabon Metcalf, via email: rabon(cDrmengineer.com
FROM: Erika Bridges
SUBJECT: Engineering Document Comments for Systek Computing
Staff reviewed the above -mentioned engineering documents as requested. The following page
is a list of staff review comments detailing items that need to be addressed. Please address the
comments and submit the following information by any Monday at 10:00 a.m. for further staff
review and approval of the plans:
One (1) set of revised construction documents.
Please note that the Development Permit Balance (Public Infrastructure Review and Inspection
Fee), will be calculated and requested once the construction documents and engineer's
estimates have been reviewed and approved.
If you have any questions or need additional information, please call Erika Bridges at
979.764.3570.
Attachments: Staff review comments
PC: Craig & Carol Investments, via email: craig(cDsystekmail.com
Case File No. 12-500019
ENGINEERING COMMENTS NO. 2 —Construction Documents
1. Please provide a copy of sheet C1.0A — Demo and Erosion Control Plan.
2. Grading Plan — Please show the original versus the proposed pond.
3. Grading Plan — Revise to show current floodplain, floodway, and BFE on property.
4. Drainage Report — On Page 2, the FEMA information should include that fact that there is
floodway on the property.
5. Drainage Report — Please provide verification of the maximum allowable ponding in the
parking lot.
Reviewed by: Erika Bridges Date: 3/5/12