Loading...
HomeMy WebLinkAboutCorrespondenceAlan Gibbs From: Alan Gibbs Sent: Tuesday, September 04, 2012 4:05 PM To: 'Brandon Boatcallie' Cc: Teresa Rogers Subject: RE: Meeting Minutes Brandon, I meant to add that a future 10' sidewalk and signal along Rock Prairie should be taken into account with the design of ramps, crossing, etc. Alan From: Alan Gibbs Sent: Tuesday, September 04, 2012 4:00 PM To: 'Brandon Boatcallie' Cc: Teresa Rogers Subject: RE: Meeting Minutes Brandon, In general your summary looks good. A few comments below, and Teresa may want to add comments as well: 5. The hydrants will need to be flowed, and I submitted a request to Water Services. 6. "BCS" left turn... 7. Streetlight poles should be located adjacent to sidewalk in the greenspace leaving approximately a 2+ ft clearance to curb. 9. The preliminary plan should be submitted asap and will go to a separate meeting ahead of Final Plat. The construction documents can be submitted with or just following the preliminary plan. Prior to the Final Plat being scheduled for P&Z, the construction documents must be approved (Development Permit), associated the surety provided, and the associated required separate instrument easements (PUE, access, slope, etc - if not on Final Plat) must be applied for and prepared by CS Legal and ready for execution and filing. 13. Fyi, CSU will still need to review the design - but we will coordinate from Planning. Let me know if you have further questions. Alan Gibbs, P.E., CFM City Engineer Planning & Development Services Office: (979) 764-3570 City of College Station Home of Texas A&M University From: Brandon Boatcallie[mailto:bmb(a)binkleybarfield.com] Sent: Friday, August 31, 2012 12:48 PM To: Alan Gibbs Subject: Meeting Minutes Alan, Thank you for taking the time to meet with me yesterday. I know you are busy and I truly appreciate your time. 1 I have attempted to summarize our metwng yesterday in the attached minutes. Pleaad review them and let me know if you have any comments. Thanks, Brandon Brandon M. Boatcallie, P.E. Office Manager Blinkley &Barfield Inc. consulting engineers iGrn i+ep�skn^i: r ft, iUGt F-75"r 426 Tarrow Street, Suite 106 College Station, Texas 77840 979.703.1809 Tel 979.574.6056 Cell bmb(o)bin klevbarfield. com www.binklevbarfield.com SERVING TEXAS COMMUNITIES FOR 40 YEARS. HOUSTON HQ - Gulf Coast Region I RICHARDSON - DFW Region I AUSTIN - Central Texas Region I COLLEGE STATION - Brazos Valley Region This e-mail (to include any enclosures or attachments thereto) contains confidential and proprietary information that is protected under the Electronic Communications Privacy Act, 18 USC Sections 2510-2521. If you are not the intended recipient, any further retention, dissemination, or duplication of this message is strictly prohibited by law. Please notify the author if you received this transmission in error, and delete the message to include all associated attachments and enclosures immediately. Binkley Barfield, Inc consulting engineers Texas Registralon Number F-257 CON F E RENCE MEMORANDUM Project: Texas Hotel Management Corp 17 acre tract Client: Texas Hotel Management Corp Location: Alan Gibb's Office Subject: Prelim Project Planning and Criteria Discussion Memo Revised 9/4/I2 per Alan Gibb's comments Attendees Name Organization Alan Gibbs COCS Brandon Boatcallie BBI Date/Time: BBI Job No.: Phone 979.764.3570 979.703.1809 8/30/12, 3:00 PM 154300 The following is our understanding of the subject matter covered in this meeting. The intent of this conference memorandum is to address only a summary of the pertinent items discussed and not necessarily all discussions. Please notify BBI within 24 hours if any changes are requested. Discussion: 1. Setbacks should not be shown on prelim plan or final plat. 2. The preliminary utility easement widths were discussed. The following will be proposed on the preliminary plan: a. 10' utility easement along northern property boundary, southern property boundary (Arnold Road ROW), and western property boundary. b. 20' utility easement along eastern property boundary. c. Utility easements will only be proposed along property boundary, not between lots. 3. The BCS United street, water, and sewer criteria will be used in design. Design to be in accordance with public infrastructure criteria. 4. Drainage and water reports will be submitted in accordance with guidelines outlined in BCS United guidelines. A sewer report will not be provided since the existing sewer line to the north of the site is already in place. 5. BBI can request existing fire hydrant flow data from the City to use in developing the water report. Alan will request that water services perform the flow tests and provide the data to BBI. 6. The BCS left turn lane geometric criteria can be used for right turn lanes as well. (80' taper, 100' decel for minor collector.) Page 1 of 2 7. Street lights will be required along Arnold Road and Normand Drive. Alan will provide BBI with the current street light standards for installations of poles between the back of curb and sidewalk. Streetlight poles should be located adjacent to the sidewalk in the greenspace leaving approximately a 2+ feet clearance to curb. 8. Brandon requested the Med drainage report that was used to design the existing detention pond. The City has tried to locate the report but has been unable to do so. 9. The preliminary plan should be submitted asap and will go to a separate meeting ahead of Final Plat. The construction documents can be submitted with or just following the preliminary plan. Prior to the Final Plat being scheduled for P&Z, the construction documents must be approved (Development Permit), associated the surety provided, and the associated required separate instrument easements (PUE, access, slope, etc — if not on Final Plat) must be applied for and prepared by CS Legal and ready for execution and filing. 10. In locations where the sidewalk meanders outside the ROW, a public access easement may be requested. 11. BBI will be asked to separate the costs between the developer and the City. Generally speaking, the infrastructure outside the private property will be paid for by the City, including pond improvements, parking lot modifications, and decel lanes. 12. BBI will design the Arnold Road/Normand Drive intersection to allow for the future expansion of Normand Drive. 13. The proposed storm sewer outfall along the CSU property will be designed to meet public standards. CSU will need to review the proposed outfall design. Planning will coordinate the plan review with CSU. 14. The 100 yr storm drainage path must be analyzed by the engineer to understand the proposed flow path. A shallow swale may be required above the proposed outfall pipe or perhaps the pipe will need to be sized to convey the 100 year storm. 15. Waterline crossings at intersections must be encased and offset to allow for maintenance. 16. The existing pond modifications will likely be the biggest project challenge. Retaining walls may be proposed but care must be taken to ensure pedestrian safety. Concept plans for pond modifications should be discussed with the City early in the design process. The reduction of pond volume may be added to the proposed private pond at a 1:1 ratio. 17. If the site plan and plat are submitted concurrently, the City may review the 2 submittals jointly. 18. Parking lot improvements (including trees, irrigation, driveways etc.) should be submitted with the construction documents. 19. A future 10' sidewalk and signal along Rock Prairie should be taken into account with the design of ramps, crossings, etc. along Normand Drive. Brandon Boatcallie, P.E. BBI College Station Office Manager END OF DOCUMENT Page 2 of 2 Alan Gibbs From: Sent: To: Subject: One more comment. Alan Gibbs Monday, September 17, 2012 10:19 AM Erika Bridges; Jason Schubert RE: CS Med & Sr Living PP12-194 Fyi, the majority of the public sanitary sewer lines adjacent to this site are vitrified clay constructed in the 1980's. These line are susceptible to damage from adjacent construction due to material and age. It is suggested to consider replacing the lines with this development. Otherwise, the City will perform a pre -construction TV inspection of the lines, to compare against a post -construction TV inspection. At a minimum damaged lines will of course need to be replaced by the development. Post -construction TV inspection will also be the responsibility of each applicable development. From: Alan Gibbs Sent: Monday, September 17, 2012 9:51 AM To: Erika Bridges; Jason Schubert Subject: FW: CS Med & Sr Living PP12-194 Erika - Below are my comments. Thanks for entering this for me. Jason - Let me know if you still need my suggestions to your comments 10, 18, 23-26. Alan Fyi, the construction documents can now be submitted. Prior to the Final Plat being scheduled for P&Z, the construction documents must be approved (Development Permit), associated the surety provided, and the associated required separate instrument easements (PUE, access, slope, etc - if not on Final Plat) must be applied for and prepared by CS Legal and ready for execution and filing. Provide existing width, as well as volume and page of Right of Way dedication through the The Med property. Also identify additional approximated required Right of Way, access, slope easements, etc. Fyi, as you are aware, discussions are well underway regarding a possible agreement for participation for portions of Normand Drive. Similarly, there are funds from the Med that likely will be included in this agreement which involves modifications to the Med parking and detention pond. The current FEMA map panel 48041C0310E revised May 16, 2012 should be used and referenced. Fyi, proposed public water lines should be designed to be no closer than 5.5 ft from the edge of PUE. Provide contour elevations and a applicable discharge flowline elevations. Fyi, the southern proposed drainage course across the CS does not appear very defined. Further discussion with the design is needed with the construction plans. CSU will still need to review the design - but we will coordinate from Planning. t Much of the plat is hard to read. The outer boundary and calls (inc�ading POB, etc) should be more bold and prominent. One particular boundary distance of 211.97 does not appear to match the metes and bounds distance of 180.26. Proposed curves in Arnold Road are not clearly labeled - provide curve table. Fyi, the minimum centerline curve radius for a 2 lane minor collector is 430 ft. Depict the power poles for the two lines crossing this acreage - with emphasis in ROW and proposed easements. Fyi, the construction plans will need detailed information in this regard (guy wires, proposed contours, etc) and may require line/pole adjustment. Fyi, depiction of proposed detention ponds on preliminary plan does not at this stage of review imply approval. Fyi, coordination with the three residences which take access to Arnold is needed to ensure the design and construction will maintain access and utilities throughout construction, and that the future driveways, meters, etc are accommodated. 2