HomeMy WebLinkAboutCost EstimateCMCK'S SITE PLAN - PUBLIC INFRASTRUCTURE ESTIMATE
1/2012012
MBESI NO. 1000-0208
Item
Description
Estimated Quantity
Estimated
Estimated Total
No
Unit Cost
Cost
1.00
WATER LINE IMPROVEMENTS
L01
8" AW WA C900, DR 14 (includes installation, testing and clean-
95
LF
525.00
$2,375.00
up)
L02
12" AW WA C900, DR 14 (includes installation, testing, and clean-
276
LF
$35.00
$9,660.00
up)
1.03
12"x8" Tee
1.00
EA
$450.00
$450.00
1.04
12"xl2" Tee
1.00
EA
$500.00
$500.00
1.05
IV'NU. Gate Valve
3.00
EA
51,500.00
$4,500.00
1.06
8"M.I. Gate Valve
1.00
EA
$1,150.00
$1,150.00
1.07
12" Plug
1.00
EA
$500.00
$500.00
1.08
Fire Hydrant Assembly
1.00
EA
53,500.00
$3,500.00
Subtotal Item 1.00:
$22,635.00
TOTAL CONSTRUCTION COST:
522.635.00
The above construction estimate is based on the engineer's opinion of probable construction costs. This estimate constitutes our best
judgment at this time. Please note that the engineer does not have any control over contractor or supplier workloads and the degree
to which inflation may affect proje osts between now and the bid date. During design and construction, additional features may
become apparent a vork progre which will result in an increase or decrease in cost.
Prepared by:
Se L1. R bertson, P.E.
bClare Brggti4e Engineering/Surveying, Inc.
CHICK'S SITE PLAN —PUBLIC INFRASTRUCTURE ESTIMATE
2/27/2012
MBESI NO. 1000-0208
Estimated
Estimated Total
Item
Description Estimated
Quantity
Q Ty
Unit Cost
Cost
No.
1.00
WATER LINE IMPROVEMENTS
95
LF
$25.00
$2,375.00
1.01
8" AW WA C900, DR 14 (includes installation, testing, and clean-
ups
1.00
EA
$450.00
$450.00
1.02
12"x8" Tee
1.00
EA
$1,500.00
$1,500.00
1.03
12" M.J. Gate Valve
1.00
EA
$1,150.00
$1,150.00
1.04
8" M.J. Gate Valve
1.00
EA
$3,500.00
$3,500.00
1.05
Fire Hydrant Assembl
Subtotal Item 1.00:
$5,975.00
2.00 SIDEWALK CONSTRUCTION 4,266 SF $4:00 - $17,064.00
2.01 4" Concrete Sidewalk
2.02 Sidewalk Ramp 4.00 EA $600.00 $2,400.00
Subtotal Item 1.00: $19,464.00
TOTAL CONSTRUCTION COST: $28.439.00
The above construction estimate is based on the engineer's opinion of probable construction costs. This estimate constitutes our best
judgment at this time. Please note that the engineer does not have any control over contractor or supplier workloads and the degree
to which inflation may affect pro'ect costs between now and the bid date. During design and construction, additional features may
become apparent as the work p sses, which will result i an increase or decrease in cost.
Prepared by: .ry _.i......-
JdAei}tT,..Ro e.s n, P.E.
&Clor, gc Btowne Engineering/Surveying, Inc. Al�'.••"
.......................
�'"��ccFFlY L. ROBERTSOi�, s
lm�AMO