Loading...
HomeMy WebLinkAboutCost EstimateCMCK'S SITE PLAN - PUBLIC INFRASTRUCTURE ESTIMATE 1/2012012 MBESI NO. 1000-0208 Item Description Estimated Quantity Estimated Estimated Total No Unit Cost Cost 1.00 WATER LINE IMPROVEMENTS L01 8" AW WA C900, DR 14 (includes installation, testing and clean- 95 LF 525.00 $2,375.00 up) L02 12" AW WA C900, DR 14 (includes installation, testing, and clean- 276 LF $35.00 $9,660.00 up) 1.03 12"x8" Tee 1.00 EA $450.00 $450.00 1.04 12"xl2" Tee 1.00 EA $500.00 $500.00 1.05 IV'NU. Gate Valve 3.00 EA 51,500.00 $4,500.00 1.06 8"M.I. Gate Valve 1.00 EA $1,150.00 $1,150.00 1.07 12" Plug 1.00 EA $500.00 $500.00 1.08 Fire Hydrant Assembly 1.00 EA 53,500.00 $3,500.00 Subtotal Item 1.00: $22,635.00 TOTAL CONSTRUCTION COST: 522.635.00 The above construction estimate is based on the engineer's opinion of probable construction costs. This estimate constitutes our best judgment at this time. Please note that the engineer does not have any control over contractor or supplier workloads and the degree to which inflation may affect proje osts between now and the bid date. During design and construction, additional features may become apparent a vork progre which will result in an increase or decrease in cost. Prepared by: Se L1. R bertson, P.E. bClare Brggti4e Engineering/Surveying, Inc. CHICK'S SITE PLAN —PUBLIC INFRASTRUCTURE ESTIMATE 2/27/2012 MBESI NO. 1000-0208 Estimated Estimated Total Item Description Estimated Quantity Q Ty Unit Cost Cost No. 1.00 WATER LINE IMPROVEMENTS 95 LF $25.00 $2,375.00 1.01 8" AW WA C900, DR 14 (includes installation, testing, and clean- ups 1.00 EA $450.00 $450.00 1.02 12"x8" Tee 1.00 EA $1,500.00 $1,500.00 1.03 12" M.J. Gate Valve 1.00 EA $1,150.00 $1,150.00 1.04 8" M.J. Gate Valve 1.00 EA $3,500.00 $3,500.00 1.05 Fire Hydrant Assembl Subtotal Item 1.00: $5,975.00 2.00 SIDEWALK CONSTRUCTION 4,266 SF $4:00 - $17,064.00 2.01 4" Concrete Sidewalk 2.02 Sidewalk Ramp 4.00 EA $600.00 $2,400.00 Subtotal Item 1.00: $19,464.00 TOTAL CONSTRUCTION COST: $28.439.00 The above construction estimate is based on the engineer's opinion of probable construction costs. This estimate constitutes our best judgment at this time. Please note that the engineer does not have any control over contractor or supplier workloads and the degree to which inflation may affect pro'ect costs between now and the bid date. During design and construction, additional features may become apparent as the work p sses, which will result i an increase or decrease in cost. Prepared by: .ry _.i......- JdAei}tT,..Ro e.s n, P.E. &Clor, gc Btowne Engineering/Surveying, Inc. Al�'.••" ....................... �'"��ccFFlY L. ROBERTSOi�, s lm�AMO