Loading...
HomeMy WebLinkAboutStaff Comments(*�" CITY OF COLLEGE STATION H ofTamAWUW.iry• 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM February 6, 2012 TO: Carlin White Associates (Cliff Carlin), via email ccarlin@carlinwhite.com FROM: Jason Schubert, AICP Principal Planner SUBJECT: CHICKS (DVPL) Thank you for the submittal of the requested documents for your DEVELOPMENT PLAT application. This project will be distributed to staff this week for their review. Please note that this application will not be scheduled for Planning & Zoning Commission consideration until after the application has been reviewed by staff and any requested or outstanding items have been completed. cc: Discount Fuels L.L.C, via email jacksonfulham@me.com McClure & Browne Engineering/Surveying, via email jeffr@mcclurebrowne.com Case file no. 12-00500018 (*/1 CTTY OF, COTJ J.GE STATION Home ofTffzA&M University' February 14, 2012 Planning & Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM TO: Carlin White Associates (Cliff Carlin); via email ccarlin@carlinwhite.com FROM: Lauren A. Hovde. Staff Planner SUBJECT: CHICKS — Development Plat Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, February 27, 2012, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, March 15, 2012, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Thirteen (13) 1 Vx17" copies of the revised final plat; One (1) Mylar original of the revised final plat (required after P&Z approval); and One (1) copy of the digital file of the final plat on diskette or e-mail to: P&DS—Digital_Submiftal@cstx.gov. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.csb(.gov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments cc: Discount Fuels LLC; via email jacksonfulham@me.com McClure & Browne Engineering; via email jeffr@mcclurebrowne.com Case file #12-00500018 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 1 of 3 STAFF REVIEW COMMENTS NO. 1 Project: CHICKS (DVPL) - 12-00500018 PLANNING 1. To verify that no encroachments are being created by this Final Plat, please submit a survey of the property showing the existing structures. If encroachments are being created, the encroachment must be removed prior to recording the Final Plat at the County Court House. 2. Section 8.2.J of the Unified Development Ordinance (UDO) requires that an Access Way be provided on blockfaces over 900' linear feet. In addition, Access Ways over 300 feet in length are required to have an additional access point. Staff believes that this property is not conducive to accommodate this type of facility, and will be in support if a waiver request is submitted. To apply for a waiver request, please submit a revised application that addresses the waiver criteria and the applicable $233 waiver fee. 3. Please revise page 3 of the application to include the linear feet of public sidewalk being provided. 4. Public sidewalks must extend the full length of the property. Please revise the sidewalk shown along the Wellborn Road right-of-way to comply with this standard. Please revise the Certificate of Surveyor and the Certificate of Ownership and Dedication to reflect the language required by Section 8.8 of the LIDO. Also, the Attest needs to be removed from the Planning and Zoning Commission Certificate. 5. Please add a note that the current zoning of the subject tract is PDD Planned Development District. 6. Please label each abutting property with the owner's name. 7. General Surveyor Note #3 should be removed. 8. Please revise the title block to include the total property acreage and the property owner's and applicant's name and address. 9. Please tie this plat to a College Station control monument and show lot corner markers. 10. Please note that you will be required to submit an original paid tax certificates. 11. The construction documents and reports are still under review and may affect the plat. Reviewed by: Lauren A. Hovde, Staff Planner Date: February 14, 2012 TxDOT Comments 1. Any planned/future access drive will be required to meet TxDOT's current "Regulations for Access Driveways to State Highways". Location must consider the posted speed and the distance between existing, proposed and adjacent access points. Shared access with adjacent parcels may be required to meet guidelines. 2. Appropriate data, including drainage, must be submitted and approved prior to any future work/permits in State ROW. Reviewed by: Chad Bohne Date: February 10, 2012 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 3 ENGINEERING COMMENTS NO. 1 Please note that all public infrastructure required for platting (i.e. sidewalk and waterline) will need to be built or surety provided prior to scheduling the plat for a P&Z Meeting. Please label the volume and page number for the adjacent existing easements. A 10-ft rear lot PUE is required along the southern property line. Show and label the existing widths and limits of the adjacent public rights -of -way. The abutting right -of -width should be labeled at a point on either end of the property since the right-of-way varies. FYI... Engineering construction drawings are still under review and may affect the plat. Reviewed by: Erika Bridges SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: February 13, 2012 Date: February 8, 2012 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 3 of 3 CITY OF COLLEGE STATION Planning d Dem*pmem Seevien 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM February 22, 2012 TO: Carlin White Associates, Cliff Carlin, via email: ccarlin(cDcarlinwhite.com FROM: Erika Bridges, Graduate Civil Engineer SUBJECT: Engineering Document Comments for Chick's (DVPL) Staff reviewed the above -mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information any Monday at 10:00 a.m. for further staff review and approval of the plans: One (1) set of revised construction documents. Please note that the Development Permit Balance (Public Infrastructure Review and Inspection Fee), will be calculated and requested once the construction documents and engineer's estimates have been reviewed and approved. If you have any questions or need additional information, please call Erika Bridges at 979.764.3570. Attachments: Staff review comments PC: Discount Fuels LLC, via email: lacksonfulham(cDme.com McClure and Browne Engineering/Surveying, Inc., via email: leffr(cDmcclurebrowne.com Case File No. 12-500018 ENGINEERING COMMENTS NO. 2 — Plat Infrastructure 1. Please submit a $600 Development Permit Fee. 2. Please submit a Fire Flow Report. Unless otherwise determined, the minimum required fire flow is 2500 gpm from 2 fire hydrants. 3. As a reminder, the infrastructure plans will need to be approved prior to the plat being scheduled for a P&Z meeting. The Site, Grading, and Demolition Plans should be removed from this set of plans and submitted with the site plan application. These sheets are not being reviewed at this time. 4. Erosion Control Plan — Please add a Stabilized Construction Entrance and Silt Fence along the southwestern corner of the property along FM 2154. 5. "Water & Sewer Lines" Sheet — The City's Water Master Plan currently shows a 24-inch waterline along the northeastern property line. In lieu of building the master waterline at this time, we would prefer a 20-ft PUE be dedicated along the northern and northeastern property lines to accommodate the future construction of this line. 6. "Water & Sewer Lines" Sheet — There is currently an existing public sanitary sewer on site, so all private sanitary sewer lines shown need to be removed. 7. "Water & Sewer Lines" Sheet — Please show and label the proposed PUE's. 8. "Water & Sewer Lines" Sheet — Please remove the 12-inch waterline being extended along the rear of the lot since it is no longer on the Water Master Plan. 9. Please submit a revised cost estimate. 10. "Water & Sewer Lines" Sheet — Verify that the waterline and fire hydrant are at least 5.5-ft from the edge of the PUE. 11. Please submit a sidewalk plan sheet. 12. The sidewalk will need to be constructed along the entire side of the property bordering Wellborn Rd. between W.D. Fitch Pkwy. and the southwestern property corner. 13. Please submit a TxDOT permit for the sidewalk and construction entrance within the Tx DOT right-of-way. Reviewed by: Erika Bridges Date: 2/21/12 (_ 400r` CTTY OF C0T],P;GE STATION H... fTex A&M Uuivllioy® March 5, 2012 Planning & Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM TO: Carlin White Associates (Cliff Carlin); via email ccarlin@carlinwhite.com FROM: Lauren A. Hovde. Staff Planner SUBJECT: CHICKS — Development Plat Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. When all comments are addressed and the following information is submitted by any Monday at 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting. One (1) 24"x36" copy of the revised final plat; Thirteen (13) 1 Vx17" copies of the revised final plat; One (1) Mylar original of the revised final plat (required after P&Z approval); and One (1) copy of the digital file of the final plat on diskette or e-mail to: P&DS—Digital_Submiftal@cstx.gov. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.csb(.gov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments cc: Discount Fuels LLC; via email jacksonfulham@me.com McClure & Browne Engineering; via email jeffr@mcclurebrowne.com Case file #12-00500018 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 1 of 3 STAFF REVIEW COMMENTS NO. 1 Project: CHICKS (DVPL) - 12-00500018 PLANNING 1. Repeat: To ensure that no encroachment are being created by this Final Plat, please submit a survey showing the existing structures or add a note to the plat that existing structures are to be removed. Reviewed by: Lauren A. Hovde, Staff Planner Date: March 2, 2012 ENGINEERING COMMENTS— Plat Infrastructure 1. Please submit a $600 Development Permit Fee. 2. Please submit a Fire Flow Report. Unless otherwise determined, the minimum required fire flow is 2500 gpm from 2 fire hydrants. 3. As a reminder, the infrastructure plans will need to be approved prior to the plat being scheduled for a P&Z meeting. The Site, Grading, and Demolition Plans should be removed from this set of plans and submitted with the site plan application. These sheets are not being reviewed at this time. 4. Erosion Control Plan — Please add a Stabilized Construction Entrance and Silt Fence along the southwestern corner of the property along FM 2154. 5. "Water & Sewer Lines" Sheet — The City's Water Master Plan currently shows a 24-inch waterline along the northeastern property line. In lieu of building the master waterline at this time, we would prefer a 20-ft PUE be dedicated along the northern and northeastern property lines to accommodate the future construction of this line. 6. "Water & Sewer Lines" Sheet — There is currently an existing public sanitary sewer on site, so all private sanitary sewer lines shown need to be removed. 7. "Water & Sewer Lines" Sheet — Please show and label the proposed PUE's. 8. "Water & Sewer Lines" Sheet — Please remove the 12-inch waterline being extended along the rear of the lot since it is no longer on the Water Master Plan. 9. Please submit a revised cost estimate. 10. "Water & Sewer Lines" Sheet — Verify that the waterline and fire hydrant are at least 5.5-ft from the edge of the PUE. 11. Please submit a sidewalk plan sheet. 12. The sidewalk will need to be constructed along the entire side of the property bordering Wellborn Rd. between W.D. Fitch Pkwy. and the southwestern property corner. 13. Please submit a TxDOT permit for the sidewalk and construction entrance within the Tx DOT right-of-way. Reviewed by: Erika Bridges ENGINEERING COMMENTS — Plat Date: February 21, 2012 (Repeat) Please note that all public infrastructure required for platting (i.e. sidewalk and waterline) will need to be built or surety provided prior to scheduling the plat for a P&Z Meeting. Construction plans need to be resubmitted, as well as the development permit fee paid. (Repeat) Show and label the existing widths and limits of the adjacent public rights -of -way. Please at label Wellborn Road with Variable Width ROW at a minimum. Reviewed by: Erika Bridges Date: March 2, 2012 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 3 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION The developer needs to provide a temporary blanket easement for construction purposes or provides descriptive easements for electric infrastructure as designed by CSU for electric lines . Please provide a 20-foot wide public utility easement around the property. Reviewed by: Eric Horton Date: February 22, 2012 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 3 of 3 CITY OF COLLEGE STATION Planning dDew*pm Srrvisa 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM March 19, 2012 TO: Carlin White Associates, Cliff Carlin, via email: ccarlin(cDcarlinwhite.com FROM: Erika Bridges SUBJECT: Engineering Document Comments for Chicks Staff reviewed the above -mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information on any Monday by 10:00 a.m. for further staff review and approval of the plans: One (1) set of revised construction documents. Please note that the Development Permit Balance (Public Infrastructure Review and Inspection Fee), will be calculated and requested once the construction documents and engineer's estimates have been reviewed and approved. If you have any questions or need additional information, please call Erika Bridges at 979.764.3570. Attachments: Staff review comments PC: Discount Fuels, LLC., via email: lacksonfulham(cDme.com McClure and Browne Engineering/Surveying, via email: leffr(cDmcclurebrowne.com Case File No. 12-500018 ENGINEERING COMMENTS NO. 4 — Plat Infrastructure (Repeat) Please submit a Fire Flow Report. Unless otherwise determined, the minimum required fire flow is 2500 gpm from 2 fire hydrants. The fire flow should be in accordance with the International Fire Code. Please provide justification for the 1500 gpm & 1 fire hydrant fire flow referenced in the "Water System Analysis" based on the IFC. (Repeat) Erosion Control Plan — Please add a Stabilized Construction Entrance and Silt Fence along the southwestern corner of the property along FM 2154. - The stabilized construction entrance should be perpendicular to FM 2154 and adjacent to the roadway. - If an existing driveway will be utilized for the site construction access, please label as such on the plans. If a driveway will have to be constructed off of FM 2154, please provide a detail. (Repeat) "Water & Sewer Lines" Sheet — The City's Water Master Plan currently shows a 24-inch waterline along the northeastern property line. In lieu of building the master waterline at this time, we would prefer a 20-ft PUE be dedicated along the northern and northeastern property lines to accommodate the future construction of this line. - Please continue the 20-ft PUE along the property line tying in perpendicular to FM 2154. - The waterline should probably be shifted to the east as soon as possible so that the 30-ft PUE can be reduced. FYI... With the site plan, we will look at the location of site lighting and verify that private light poles are not within PUEs. - After further consideration, it appears that the 10-ft PUE adjacent to Southern Trace is not needed and may be removed from the plat. FYI... Additional easements may need to be dedicated at the time of site planning as needed. (Repeat) "Water & Sewer Lines" Sheet — There is currently an existing public sanitary sewer on site, so all private sanitary sewer lines shown need to be removed. - Please remove the private sewer and water service lines from these plans. - FYI ... All private service lines will need to be constructed outside of PUEs. (Repeat) The sidewalk will need to be constructed along the entire side of the property bordering Wellborn Rd. between W.D. Fitch Pkwy. and the southwestern property corner. The sidewalk looks like it's clipping a northern property corner and should be shifted into the ROW. Reviewed by: Erika Bridges Date: 3/19/12