Loading...
HomeMy WebLinkAboutFinal Drainage ReportFl F R -vi W~b~FOR i COMF'LIA . JUN 1 8 200 CO. STATION -..f,j !NEERING l!!J!!f!Jg - EBANK ~~~2s_s_1T_e_xa_s _Av_e_.s_o_ur_h,_St_e._A_,c_o_11e_g_e _sr_ar_ion_,_T,_X_77_8_40~~~~~~~~~ ~~~~ Ofc: 979 .693.5359 Fax: 979.693.4243 Email: mdgcs@mdgcs.com Web: www.mdgcs.com \)~()~~ ~~() <\)~ \.) TABLE OF CONTENTS 1.0 PROJECT SCOPE ..................................................................................................... 4 1.1 SITE LOCATION ........................................................................................................ 4 1.2 GENERAL DESCRIPTION ......................................................................................... 4 2.0 DRAINAGE BASINS & SUB-BASINS ................................................................... .4 2.1 MAJOR DRAINAGE BASIN DESCRIPTIONS ........................................................ .4 2.2 SUB-DRAINAGE BASIN DESCRIPTIONS .............................................................. 5 3.0 DRAINAGE DESIGN CRITERIA & CONSTRAINTS ......................................... 5 3.1 OPEN CHANNELS ...................................................................................................... 5 3.2 DETENTION FACILITIES ......................................................................................... 6 4.0 DRAINAGE SYSTEM MODELING ....................................................................... 6 4.1 OPEN CHANNELS ...................................................................................................... 7 4.2 DETENTION FACILITIES ......................................................................................... 7 5.0 CONCLUDED DRAINAGE IMPROVEMENTS ................................................... 7 5.1 OPEN CHANNELS ...................................................................................................... 7 5.2 DETENTION FACILITIES ......................................................................................... 8 APPENDIX A -HYDRAULIC COMPUTATIONS APPENDIX B -MAPPING LIST OF TABLES DESCRIPTION PAGE NO. TABLE #1: PILOT CHANNEL FLOW RESULTS ........................................................... 8 TABLE #2: DETENTION POND VOLUME RESULTS ................................................... 8 TABLE#3: WEIRFLOWRESULTS ................................................................................. 9 TABLE #4: STAGE/STORAGE RESULTS ...................................................................... 9 Planters & Merchants State Bank Site, Grading, Drainage & Utility Improvements Municipal Development Group 1.0 PROJECT SCOPE This report outlines the pavmg and drainage improvements for the proposed Planters & Merchants State Bank development at the Dartmouth Addition Subdivision (Block One, Lot 1 ). This drainage report will consist of the requirements necessary for the improvements of this site in accordance with the provisions of the City of College Station Drainage Policy and Design Standards. Previous drainage studies have been performed on the adjacent properties and this property's watershed, but none have considered post-development conditions on the subject property. 1.1 SITE LOCATION The project is located on the south side of Southwest Parkway approximately 2,000 linear feet east from the intersection with Texas Avenue. The site is adjacent to Ashford Square to the west and the Heritage Apartments to the south. The east adjacent property is vacant and unimproved, but an Exxon convenience store is planned. 1.2 GENERAL DESCRJPTION The subject property is currently vacant. This land generally slopes to an unnamed tributary of Bee Creek at a grade of approximately 2.00%. This site is currently unimproved with native grasses, and weeds. Runoff drains south over land to the unnamed tributary thence to Bee Creek being a secondary drainage system. Bee Creek drains to the Carter's Creek drainage basin. 2.0 DRAINAGE BASINS & SUB-BASINS 2.1 MAJOR DRAINAGE BASIN DESCRJPTIONS The paving and drainage improvements project site is contained within the Bee VII Sub-basin contained within the drainage-watershed of the Bee Creek Drainage System, part of the Carter's Creek Drainage Basin. This drainage basin is illustrated on Exhibit #1 -"Carter's Creek Drainage 000761-3357 Drainage Report Final Drainage Report -4 Planters & Merchants State Bank Site, Grading, Drainage & Utility Improvements Municipal Development Group Basin" located in Appendix B -Mapping. The borders of this drainage basin roughly consist of Rock Prairie Road on the south and west, State Hwy No 30 to the east, and State Hwy No. 21 to the north. 2.2 SUB-DRAINAGE BASIN DESCRIPTIONS This projects sub-drainage basin consists solely of the 2.02 acre tract. A graphical representation of the sub-drainage basin is illustrated on Exhibit #2 -"Sub-Drainage Basin" located in Appendix B -Mapping. No portion of this project is located within the 100-year floodplain as graphically depicted by F.E.M.A FIRM Community Panel No 48041C0144 C (as revised by LOMR dated July 10, 2000) and Panel No. 48041C0163 C), having an effective date of July 2, 1992. An excerpt of the FIRM map with the location of the project site is illustrated on Exhibit #3 -"FIRM Map" located in Appendix B -Mapping 3.0 DRAINAGE DESIGN CRITERIA & CONSTRAINTS For all development within the City of College Station, there are criteria on the use of which design storms and development conditions for type of drainage improvements. Below, in each type of improvement, the required design constraints are more fully detailed. All drainage improvements shall also be analyzed during the 100-year rainfall event to insure that no adverse conditions will exist. 3.1 OPEN CHANNELS Open channel improvements shall be designed in accordance to the City of College Station's Drainage Policy and Design Standards. Unless otherwise stated, the following constraints shall dictate the design of all open channels: •!• Minimum grade shall be 0.4% for earth or vegetative lined channels. 000761-3357 Drainage Report Final Drainage Report - 5 Planters & Merchants State Bank Site. Grading, Drainage & Utility Improvements Municipal Development Group •:• Channel capacities shall be dictated by the design storm of the 25-year rainfall event. •:• Low-flow pilot channels shall be required for grass-lined channels with a carrying capacity of 1/3 of the peak discharge of the 5-year rainfall event. •:• Minimum permissible velocity of 2.5 ft/sec during the 25-year rainfall event. •:• Maximum channel velocities shall be as dictated below: > Exposed earth at 3.0 ft/sec. > Seeded grass at 4.5 ft/sec. > Sodded grass at 6.0 ft/sec. > Impermeable surface at 10 ft/sec. •:• Maximum side slope for grass-lined earth channel is 3: 1. •:• Channels with trapezoidal cross-section shall have a minimum bottom width of 4 feet. •:• Channel shall have a minimum freeboard of 0.5 feet. •!• The 100-year rainfall event shall be contained within the channel drainage easement. •:• Minimum drainage easement width shall be the channel's top width plus 20 feet. 3.2 DETENTION FACILITIES Detention shall be designed in accordance to the City of College Station's Drainage Policy and Design Standards. Unless otherwise stated, the following constraints shall dictate the design of detention basins: •!• Detention facilities shall have the capacity to contain the 100-year rainfall event. •!• Maximum detention basin's side slope shall be 4:1 with vegetative cover and 2: 1 for non-vegetative cover. •:• Bottom slopes of the detention basin with vegetative cover shall be at a grade of 20: 1 with low-flow pilot channels. •!• Minimum of 0.5 feet of free board during the 100-year rainfall event. •!• Detention facilities other than parking lots and rooftops shall have an increased capacity of 10% to allow for sedimentation. 4.0 DRAINAGE SYSTEM MODELING For all drainage system modeling, the volume of runoff will be calculated. The drainage area calculations are summarized accordingly using the Rational Method: (Q=CIA) where "Q" is the runoff in cubic feet/second, "C" is the runoff 000761 -3357 Drainage Report Final Drainage Report -6 Planters & Merchants State Bank Site, Grading, Drainage & Utility Improvements Municipal Development Group coefficient, "I" is the storm intensity in inches/hour for each selected frequency, and "A" is the drainage area in acres. A minimum 10-minute time of concentration for all calculations will be assumed. The selected frequencies will be 2, 5, 10, 25 , 50, 100-year rainfall events. 4.1 OPEN CHANNELS Open channel hydraulic calculations are aided by the program FlowMaster v. 5.7 by Haestad Methods. Within this program, basic geometry and characteristics of a proposed or existing channel can be defined. From this information, Manning 's formula is then used to calculate desired parameters of the open channel. 4.2 DETENTION FACILITIES Detention requirements are determined by graphical means. Tabulations of the pre-development and the post-development hydrographs of the drainage areas are provided. The hydrographs are based on the standard SCS unit hydrograph with time to peak discharge set to equal the time of concentration and the total base time set at 3.00 times the time of concentration. 5.0 CONCLUDED DRAINAGE IMPROVEMENTS The proposed development receives runoff from the primary sub-drainage basin (see Exhibit #2). Using these calculated runoff values, the drainage structures and detention facilities were design and checked for compliance with the drainage policy. 5.1 OPEN CHANNELS Within the detention facility is a pilot channel that will accommodate for low-flow between the proposed parking lot and the discharge weir. Additionally, there is a pilot channel on the downstream end of the discharge weir that will carry flow to the existing drainage channel. The pilot channel upstream on the weir was designed for post-development 000761-3357 Drainage Report Final Drainage Report -7 Planters & Merchants State Bank Site, Grading, Drainage & Utility Improvements Municipal Development Group conditions. The open-channel and concrete pilot channel downstream of the weir was designed at pre-development conditions since the weir will restrict the flow to that discharge amount. Actual designed hydraulic values are illustrated below in Table # 1. TABLE #1 PILOT CHANNEL FLOW RESULTS 1/3 5-YEAR CHANNEL .. .CONDITION Q SLOPE WIDTH VELOCITY (cfs) (%) (ft) (fps) PRE 3.98 2.50 3.23 6.1 POST 1.98 10.00 1.92 8.61 The downstream pilot channel exceeds normal constraints for open- channel design. In order to prevent erosion and scouring of the channel, it will be lined with riprap (see Exhibit #2). 5.2 DETENTION The detention facility size was based from the comparisons of the existing runoff conditions and the proposed runoff conditions. Based from the pre- development and post-development hydrographs the required detention volumes is as follows: TABLE#2 DETENTION POND VOLUME RESULTS FREQUENCY PRE~Q POST-Q VOCOME- (yr) (cfs) (cfs) (ft3) 2 4.90 9.82 4429 5 5.95 11 .94 5385 10 6.68 13.40 6045 25 7.63 15.30 6903 50 8.63 17.30 7804 100 9.01 18.06 8148 000761-3357 Drainage Report Final Drainage Report - 8 Planters & Merchants State Bank Site, Grading, Drainage & Utility Improvements Municipal Development Group The weir structure for the outlet of the detention pond was designed so that the design discharge will be equal to or less than the pre-development flow rates. The comparison of allowable and actual discharge rates are as follows: TABLE#3 WIER FLOW RESULTS ALLOWABLE FREQUENCY DISCHARGE (yr) (cfs) 2 5 10 25 50 100 4.90 5.95 6.68 7.63 8.63 9.01 .ACTUAL DISCHARGE (cfs) 3.29 4.54 5.54 6.83 8.38 9.01 For clarity, Table #4 illustrates the staging of the detention pond. Each event represented is a peak conditions. TABLE #4 ST AGE/STORAGE RESULTS VOLUME IN FREQUENCY POND DEPTH (yr) (ft3) (ft) 2 4429 0.64 5 5385 0.78 10 6045 0.88 25 6903 1.00 50 7804 1.13 100 8148 1.18 000761-3357 Drainage Report Final Drainage Report -9 000761-3357 Drainage Report.doc APPENDIX A HYDRAULIC COMPUTATION DESCRIPTION APPENDIX A TABLE OF CONTENTS PAGE NO. Drainage Calculations ................................................................................................. A-1 Open Channel Calculations ......................................................................................... A-2 Weir Calculations ........................................................................................................ A-3 000761-3357 Drainage Report.doc PRE-DEVELOPMENT GENERAL INFORMATION Description: Drainage area of site before development. Drainage Area (APRE) = 2.020 acres TIME OF CONCENTRATION CTc) GIVEN Maximum Travel Distance (DPRE) Velocity of Runoff (VPRE) = 440 ft ft 0.75 fsec Coefficient of Runoff (CPRE) = 0.38 **NOTE: Minimum Tc allowed = 10 min. 2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q) Coefficient (e) = Coefficient (b) = Coefficient (d) = 0.806 65 8 5 YEAR FREQUENCY. RATE OF DISCHARGE (Q) Coefficient (e) = 0.785 Coefficient (b) = 76 Coefficient (d) = 8.5 10 YEAR FREQUENCY. RATE OF DISCHARGE (Q) Coefficient (e) = Coefficient (b) = Coefficient (d) = 0.763 80 8.5 25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q) Coefficient (e) = 0.754 Coefficient (b) = Coefficient (d) = 89 8.5 50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q) Coefficient (e) = 0.745 Coefficient (b) = Coefficient (d) = 98 8.5 100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q) Coefficient (e) = 0.73 Coefficient (b) = 96 Coefficient (d) = 8 000761-3357 Drainage Calculations.xis RESULT TqPRE) = 9.8 min. Rainfall Intensity (15) = 7.693 in/hr ········.·.·.·.·.·•·.·.·.·.·.·.·.··· ·········-·.·.·.·.·.·.·.·.·.·.·.·.·.·. ·············.·.·.·.·.·.·,·.·.·,····· @~!.! : nm :rn 1;11tif.~ n Rainfall Intensity (110) = 8.635 i%r @jM\K : n =:::::::::::::: ·1~i1~~t!':::::m Rainfall Intensity (125) = 9.861 i%r l @~~a ] . i :: m : : : ZiilllV.$f Rainfall Intensity (150) = 11 .148 in/hr g~ij !l .··· : :J::::J: :: ' : l~ill:::Rt!::: i> Rainfall Intensity (1100) 11 .639 i%r :1~00.:a :: :::rr r: : r=:: t4l.9.'=if.$ n POST-DEVELOPMENT GENERAL INFORMATION Description: Drainage area of site after development Drainage Area (A1) = 1.400 acres (impervious area) Drainage Area (A2) = 0.620 acres (landscaped area) TIME OF CONCENTRATION CTcl GIVEN Maximum Travel Distance (D1) = Velocity of Runoff (V1) = Coefficient of Runoff (C1) = Maximum Travel Distance (D2) = Velocity of Runoff (V2) = Coefficient of Runoff (C2) = 440 ft ft 2.75 lsec 0.90 440 ft 1.00 ft/sec 0.45 **NOTE: Minimum Tc allowed = 10 min. 2 YEAR FREQUENCY. RATE OF DISCHARGE (Q) Coefficient (e) = Coefficient (b) = Coefficient (d) = 0.806 65 8 5 YEAR FREQUENCY. RATE OF DISCHARGE (Q) Coefficient (e) = Coefficient (b) = Coefficient (d) = 0.785 76 8.5 10 YEAR FREQUENCY. RATE OF DISCHARGE (Q) Coefficient (e) = Coefficient (b) = Coefficient (d) = 0.763 80 8.5 RESULT Tc1 = T C(POST) = Rainfall Intensity (12) = Q AREA 1 = 2.7 min. 7.3 min. 10.0 min. in/ 6.327 hr 8.038 cfs QAREA 2 = 1 . 780 cfs liffi :::::: ::]] J:t: ::: ]i~11:~l::£§:: Rainfall Intensity (15) = Q AREA 1 = in/ 7.693 hr 9.774 cfs Q AREA 2 = 2.164 cfs ·ma .·: ::i it 11 ~11 ,m i Rainfall Intensity (1 10) = 8.635 in/hr Q AREA 1= 10.970cfs Q AREA 2 = 2.429 cfs ,gj~.$ i::,: :::,::::i ,, i,, ... ii ,,,:i-::::::::: · 11*1!!i,I!: .. ::.:.:: 25 YEAR FREQUENCY. RATE OF DISCHARGE (Q) Rainfall Intensity (125) = 9.861 in/hr Coefficient (e) = Coefficient (b) = Coefficient (d) = 0.754 89 8.5 50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q) Coefficient (e) = Coefficient (b) = Coefficient (d) = 0.745 98 8.5 100 YEAR FREQUENCY. RATE OF DISCHARGE (Q) Coefficient (e) = Coefficient (b) = Coefficient (d) = 000761-3357 Drainage Calculations.xis 0.73 96 8 QAREA 1 = 12.529 cfs Q AREA2 = 2.774 cfs :·ii':e:.:.]r :::::: :_::_:_::_:::::::,:_:::11~~'~ ~::-< Rainfall Intensity (150) = Q AREA 1 = 11.148 in/hr 14.163 cfs QAREA 2 = 3.136 cfs ma:]:::· :i::::i:i 1 :: :: ::=:::1z~gnH~r':::: Rainfall Intensity (1100) 11 .639 in/hr QAREA 1 = 14.788 cfs QAREA 2 = 3.27 4 cfs :1m~1 ::::: ::::: ::11~1@:,f:i HYDROGRAPHS Chart 4 2-YEAR HYDROGRAPH 4---- 2-- 0 0 10 I EJ Post-Development 8 Pre-Development I HYDROGRAPHS Chart 4 = 4,429 ft3 TIME (min) 20 30 HYDROGRAPHS Chart 5 5-YEAR HYDROGRAPH 0 10 20 8 Post-Development Iii Pre-Development TIME (min) HYDROGRAPHS Chart 5 30 HYDROGRAPHS Chart 6 10-YEAR HYDROGRAPH 0 10 20 l!I Post-Development El Pre-Development TIME (min) HYDROGRAPHS Chart 6 30 HYDROGRAPHS Chart 7 25-YEAR HYDROGRAPH 10------- 8----- s---- 4--- 2 0 0 10 20 ID Post-Development 8 Pre-Development TIME (min) HYDROGRAPHS Chart 7 30 HYDROGRAPHS Chart 8 50-YEAR HYDROGRAPH Volume Conveyed 12------- a----- 6---- 4 -- 2 0 0 10 E Post-Development El Pre-Development HYDROGRAPHS Chart 8 TIME (min) 20 30 HYDROGRAPHS Chart 9 100-YEAR HYDROGRAPH Volume Conveyed 8, 148 ft3 10---- 5 0 0 10 [J Pre-Development mJ Post-Development HYDROGRAPHS Chart 9 TIME (min) 20 30 Project Description Project File Worksheet Flow Element Method Solve For Input Data Mannings Coefficient Channel Slope Left Side Slope Right Side Slope Discharge Results Depth Flow Area Wetted Perimeter Top Width Critical Depth Critical Slope Velocity Velocity Head Specific Energy Froude Number Flow is supercritical. Notes: APPENDIX A Worksheet for Triangular Channel i :\projects\ 700\3357 -p&m bank\drainage report\335 7t1 ra. fm2 (POST) Pilot Channel (1 /3 -5 YR) Triangular Channel Manning's Formula Channel Depth 0.013 2.50 % 4 H :V 4 H :V 3.979 cfs 0.40 ft 0.65 ft2 3.33 ft 3.23 ft 0.57 ft 0.003891 ft/ft 6.10 ft/s 0.58 ft 0.98 ft 2.39 Post-Development Conditions 05/04101 11:29:58 AM Municipal Development Group Haestad Methods, Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1666 FlowMaster v5.07 Page 1 of 1 Project Description Project File Worksheet Flow Element Method Solve For Input Data Mannings Coefficient Channel Slope Left Side Slope Right Side Slope Discharge Results Depth Flow Area Wetted Perimeter Top Width Critical Depth Critical Slope Velocity Velocity Head Specific Energy Froude Number Flow is supercritical. Notes: APPENDIX A Worksheet for Triangular Channel i:\projects\700\3357-p&m bank\drainage report\3357t1 ra .fm2 (PRE) Pilot Channel (1 /3 -5 YR) Triangular Channel Manning's Formula Channel Depth 0.013 10.00 % 4 H :V 4 H :V 1.980 cfs 0.24 ft 0.23 ft2 1.98 ft 1.92 ft 0.43 ft 0.004270 ft/ft 8.61 ft/s 1.15 ft 1.39 ft 4.39 Pre-Development Conditions 05/04101 11 :43:16 AM Municipal Development Group Haestad Methods, Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1 666 FlowMaster v5.07 Page 1 of 1 SHARP CRESTED IRREGULAR WEIR TABLE I -WEffi PARAMETERS STAGE ONE STAGE TWO ~::;ht ···1·············•••••:··········~~~~··: ~::;ht I ii .11~~1•: Slopes 1: tt: Q(Ql!ftlft Slopes 1: : :@ !~Mf?,Qft/ft TABLE II-WEm FLOW CALCULATIONS Rainfall Event (yr) 2 5 10 25 50 100 Head h (ft) 0.00 0.10 0.20 0.30 0.40 0.50 0.60 Corrected Average Length L = LAvG-0.lh L (ft) 1.75 1.79 1.82 1.86 1.89 1.93 1.96 1.97 2.02 2.06 2.10 2.15 2.16 Calculated Allowable Weir Discharge Discharge Coefficent Rate Rate Q = CwLh312 C)I) Q Qw.ow (cfs) (cfs) 3.32 0.00 3.32 0.19 3.32 0.54 3.30 1.01 3.28 1.57 3.27 2.23 3.26 2.97 3.26 3.29 3.26 4.54 3.26 5.54 3.25 6.83 3.25 8.38 3.25 9.01 Weir Average Contraction Length Correction LAVG O.lh (ft) 1.75 0.00 1.80 0.01 1.84 0.02 1.89 0.03 1.93 0.04 1.98 0.05 2.02 2.04 2.10 2.15 2.20 2.26 2.28 0.06 0.06 0.08 0.09 0.10 0.11 0.12 Notes: (1) Weir coefficents are from Table 10.3 (pg 325) of McGraw-Hill series in Water Resources and Environmental Engineering, 4th edition. I ]{{ : I Shading indicates given values. (2) 000761-3357 Sharp Crested Irregular-Shaped Weir.xis 000761-3357 Drainage Report.doc APPENDIXB MAPPING DESCRIPTION APPENDIXB TABLE OF CONTENTS PAGE NO. Exhibit # 1 -Carter's Creek Drainage Basin ................................................................ B-1 Exhibit #2 -Sub-Drainage Basin ................................................................................. B-2 Exhibit #3 -FIRM Map .............................................................................................. B-3 000761-3357 Drainage Report.doc