Loading...
HomeMy WebLinkAboutDrainage ReportDrainage Report for Universal Computer Services Phase 2 -Parking Lot Expansion The Business Center at College Station College Station, Texas October 2001 Developer: Universal Computer Services 200 Quality Circle College Station, Texas 77845 Prepared By: TEXCON General Contractors 1707 Graham Rd. College Station, TX 77845 979/690-7711 FILE oc 1\z~ COLLEGE STA ENGINEERING CERTIFICATION I, Joseph P. Schultz, Licensed Professional Engineer No. 65889, State of Texas, certify that this report for the drainage design for the Universal Computer Services, Phase 2 -Parking Lot Expansion, was prepared by me in accordance with the provisions of the City of College Station Drainage Policy and Design Standards for the owners hereof and that the storm water runoff will be reduced to pre-development runoff values by routing the runoff through the existing detention facility. ---~'~, ... --"\S OF l"'\\\ ;'\1>-•••••••• <::"1.-,,, , 0 ••• *'•, 1 -<; •l , .• •. \j) Vii , * .. •. ,, "*: . '•*I. ~......................... • * ~ l JOSEPH .......... ~ :.& ••••••••••••••• ~~ SCHULTZ ~ l~ \ 6sa8·9· .. ···.:-s-; ~,o-<' ·~(:'G x,O.·" t;; ~ fa~" "•.JSTE\':/ ~,,,, .. , us/ ••••••• '>A0 ,,,, , \\.PNAL 'C..---·~~~ll:I.- /()-t-01 INTRODUCTION DRAINAGE REPORT UNIVERSAL COMPUTER SERVICES The purpose of this repoii is to provide the hydrological effects of the construction of the Universal Computer Services, Phase 2 -Parking Lot Expansion project. The proj ect consists of the 200-space expansion of the existing parking Jot at the existing facility. GENERAL LOCATION AND DESCRIPTION The project is located on a 31.85 acre tract located east of Lakeway Drive. The property is designated as Lots 1 & 2, Block 2 of the Business Center at College Station, Phase I. The ·site of the proposed parking lot expansion is wooded with the vegetation primarily consisting of oak trees and yaupons. The existing ground elevations range from elevation 272 to elevation 260. FLOOD HAZARD INFORMATION: The project site is located in the Lick Creek Drainage Basin. The site is located in a Zone X Area according to the Flood Insurance Rate Map prepared by the Federal Emergency Management Agency for Brazos County, Texas and incorporated areas dated July 2, 1992, panel number 48041 C0205C. A Zone X Area is in an area determined to be outside of the 500-yr floodplain. DEVELOPMENT DRAINAGE PATTERNS: The storm water runoff from the site currently drains into the existing detention pond or to Lakeway Drive or Quality Circle. The design of the storm sewer system and detention pond was performed by Kling Engineering & Surveying, 4103 Texas Avenue, Suite 212, Bryan, Texas, 77802. Their design reports were reviewed to evaluate the effect, if any, this proposed development would have on the existing facilities. Their reports are: Drainage Report -Dated April 13, 1998 Addendum to Drainage Report Dated April 13, 1998 -Dated June 23, 1998. The review of the reports indicates that the proposed future development of the Universal Computer Services facility was considered in the design of the detention pond. Ari analysis of the Phase I development and Phase II or future development were each considered in the design of the detention pond. The proposed parking lot expansion is located within Drainage Area 4C, shown on the drainage area map in Appendix 2 of the Addendum to the Drainage Report. The Phase II hydro logic calculations show Drainage Area 4C to be 1.851 acres of Landscaped Area and 5.553 acres of Impervious Area with no undeveloped area noted. Approximately 3.414 acres will be landscaped, 2.290 acres will be impervious, and 1.700 acres will remain undeveloped after the parking lot expansion construction. A field survey of the detention pond indicates that the detention pond was constructed slightly larger than what was shown in the design plans. In order to construct the 2 southwestern comer of the proposed parking lot, it is proposed to fill some of the area of the existing detention pond and construct it to the original design contours. This is shown on the grading plan for the parking lot. DRAINAGE DESIGN CRITERIA The design parameters fo r the storm sewer are as follows: •.· The Rational Method is utilized to determine peak storm water runoff rates for the onsite storm sewer design. • Design Storm Frequency-Storm Sewer system-10 yr. and 100 yr. storm event. · • Runoff Coefficients -Undeveloped Area -Impervious Area -Pavement and Building Roofs -Landscaped Area c = 0.20 c = 0.90 c = 0.50 • Rainfall Intensity values are from the Intensity-Duration-Frequency Curves for the City of College Station (Figure ill-I -Drainage Policy and Design Standards) for a Time of Concentration, Tc, of 10 minutes. Storm Event 10 yr. Rainfall Intensity (in/hr) 8.635 100 yr. 11 .639 • Time of Concentration -The calculated time of concentration for the onsite storm sewer system drainage area is less than 10 minutes for the post-development condition. A minimum time of concentration of 10 minutes was used for the post-development runoff calculations for the storm sewer system. STORM WATER RUNOFF DETERMINATION The drainage area for the proposed parking lot is shown on the drainage area map. The post-development peak runoff for the proposed parking lot drainage area was determined in accordance with the criteria presented in the previous section for the 10 and 100 year storm events. The results for the post-development areas are presented below. Pavement -Impervious Landscaped Area Undisturbed Area Total Drainage Area For C = 0.90, A = 1.86 acres For C = 0.50, A = 0.43 acres Total Area = 2.29 acres 11 0 = 8.635 in/hr 11 00 = 11.639 in/hr 81 ,000 sf 18,544 sf 0 sf 99,544 sf c = 0.90 c = 0.50 c = 0.20 Composite C = 0.82 Q10 = 2.29(0.82)(8.635) = 16.2 1 cfs Q100 = 2.29(0.82)(11.639) = 21.86 cfs 3 1111111111 1 1 n II DRAINAGE AREA MAP Universal Computer Services Parking Lot Expansion College Stotion Business Center College Station, Texas TEX CON General Contractors 1707 Orahom lood l:::r.:O~·, Toot nus HEAOWAU. CONCRETE FUME I ./ I I I I ______ _...,.. I I I I I I ./ EXISTING DETENTION PONO --------- -- 11 I 111 --- ~~~~~ 30 0 E SCALE IN FEET STORM SEWER DESIGN The proposed parking lot will be constructed adjacent to the existing parking lot. The storm water runoff in the existing parking lot is captured by grate inlets and enters the stonn sewer system, which discharges into the existing channel. This channel is a part of the detention pond. The proposed parking lot will have its own storm sewer system. The runoff will flow to the southeast end of the parking lot near the detention pond where it will be captured by a grate inlet. A 27" RCP will take the runoff to the detention pond and discharge from a concrete headwall into a proposed concrete flume, which will connect to the existing flume in the detention pond. The storm sewer inlet is designed to collect the runoff for the 10 year storm event for each drainage area without the depth of water in the parking lot exceeding six inches. Table 1 presents a summary of the storm sewer inlet design. The storm sewer piping for this project has been selected to be RCP meeting the requirements of ASTM C-76, Class ill, pipe. The grate inlet box and headwall will be cast-in-place or pre-cast concrete. The 27" RCP will pass the 10-year storm without any headwater and with 3.1' of headwater for the 100-year storm. The tail water for the storm sewer design was taken from the detention pond design water surface. The design calculations for the pipes are in Appendix A. The concrete flume is designed to contain the 100-year storm runoff. The design calculations for the flume are also in Appendix A. TABLE 1 -Storm Sewer Inlet Calculations -----------:::-->'-.!1.l!o--=-=1'-"6=.2::....:1,_c=f:=s _____ ~0100 = 27 .33 cfs Grate Inlet Open Area Reg'd Cft2) 5.95 6.21 Area Provided Cft:2) 6.53 6.53 Type of Inlet: 2 -Grate Inlets 32"x32", Model No. V-5732 Notes: 1. Grate inlet capacity determined from Figure V-2, City of College Station Drainage and Design Standards and reduced by 25% for clogging. 2. Maximum inlet depth= 6" for Q10 3. Maximum inlet depth= 10" for Q100 CONCLUSIONS The construction of this project will increase the storm water runoff from this site. No flood damage to downstream landowners is expected as a result of this development since the runoff will enter the existing detention pond, which was previously designed to include this development. 4 APPENDIX A Storm Sewer Pipe Design Calculations Concrete Flume Design Calculations 5 Storm Sewer Pi pe -10 yr St orm Culvert Ca l culator Entered Data : Shape .......................... . Number of Barrels .............. . Solving for .................... . Chart Number ................... . Scal e Nu mber ................... . Chart Descript ion LED RING ENTRANC E Scale De c sription WALL Flowr ate ....................... . .Manning's n .................... . Roadway Elevation .............. . Inlet Elevation ................ . Outlet Elevation ............... . Diameter ....................... . Length ......................... . Entrance Loss .................. . Tailwater ...................... . Computed Results: He a dwater ...................... . Slope .......................... . Velocity ....................... . Circular 1 Headwat er 1 1 CONCRETE PI PE COL VERT ; NO BEVE SQUARE EDGE ENT RAN CE WI TH HEAD 1 6 .2 100 cfs 0 .0140 2 64.5000 ft 260.5000 ft 2 60.02 00 ft 27.0000 in 48.0000 ft 0.0000 2 .2 000 ft 262 .6554 ft From Inlet 0.0100 ft/ft 7.4525 fps Storm Sewe r Pipe -100 yr St orm Culvert Cal c ula t o r Ente r ed Data : Sh ape .......................... . Number of Barrels .............. . So l ving for .................... . Ch a r t Numbe r ................... . Sc ale Numbe r ................... . Chart Description .............. . LED RING EN TRAN CE Scale Decsription WALL Flowrate ....................... . .Manning' s n .................... . Roadway Elevation .............. . Inlet Elevation ................ . Outle t Elevation ............... . Diameter ....................... . Length ......................... . Entrance Loss .................. . Tailwater ...................... . Computed Results : Headwater ...................... . Slope .......................... . Velocity ....................... . Ci rcular 1 He adwater 1 1 CONCRETE PIPE CULVE RT ; NO BEVE SQUARE EDGE ENTRANCE WIT H HEAD 21. 8600 c fs 0.0140 264 .5000 ft 260 .5000 ft 260 .0200 ft 27 .0000 in 48.0000 ft 0.0000 3.3000 ft 263 .5857 ft From Outlet 0.0100 ft/ft 5.4979 fps Concrete Flume -100 yr storm Channel Calculator Given Input Data : Shape .......................... . Solving for .................... . Flowrate ....................... . Slope .......................... . Manning 's n .................... . Height ......................... . Bottom width ................... . Left slope ..................... . .Right slope .................... . Computed Results : Depth .......................... . Velocity ....................... . Flow area ...................... . Flow perimeter ................. . Hydraulic radius ............... . Top width ...................... . Area ........................... . Perimeter ...................... . Percent full ................... . Critical Information Trapezoidal Depth of Flow 21. 8600 cfs 0.0200 ft /ft 0 .0120 16.0000 in 24 .0000 in 1. 0000 ft /ft 1. 0000 ft/ft 8 .7962 in 10.9117 fps 2 .0033 ft2 48 .8794 in 5.9019 in 41.5924 in 4 .4444 ft2 69 .2548 in 54 .9763 % Critical depth .................. 14.9868 in Critical slope .................. 0 .0029 ft /ft Critical velocity ............... 5 .3875 fps Critical area ................... 4 .0576 ft2 Critical perimeter .............. 66 .3892 in Critical hydraulic radius ....... 8.80 1 0 in Critical top width .............. 53 .9737 in Specific energy . . . . . . . . . . . . . . . . . 2 .5834 ft Minimum e nergy . . . . . . . . . . . . . . . . . . 1 .8734 ft Froude number ................... 2 .5 303 Flow condition . . . . . . . . . . . . . . . . . . Supercritical