Loading...
HomeMy WebLinkAboutDP Information,t 'SUPPLEMENTAL DEVELOPMENT PERMIT INFORMATif>N~~~ Application is hereby made for the following development specific site/waterway alterations: Construction o + s treet and u t i l i ty infrast ruct ur e f o r a 55 lot s ingle f am i l y subd i vision. ACKNOWLEDGMENTS: L ___ D_e_a_n __ S_c_h_i_e_f_:i:_e_r _____ _, design engineer/owner, hereby acknowledge or affirm that: The · ·on and conclusions contained in the above plans and supportinn~ents comply with the current requirements of· the Ci . o College Station, Texas City Code, Chapter 13 and its associated f/rai ge Policy and Design Standards. As a ndi . on ofe roval of this permit application, I agree to construct ~ imp vements proposed in this application according to these ents the requirements of Chapter l3 of the College Station G~ty / e. l l., .--_....,.( __,,"...__._X _c _r ___ _ Property Owner(s) eo'ii"ffii'ctor CERTIFICATIONS: (for proposed alterations within designated flood hazard areas.) A. L certify that any nonresidential structure on or proposed to be on this site as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100 year storm. Engineer Date B. I, Debb j e Yea t ing , certify that the finished floor elevation of the lowest floor, including any basement, of any residential structure, proposed as part of this application is at or above the base flood elevation established in the .atest Federal Insurance Administration Flood Hazard Study and maps, as amended. ~d ~ Engineer ~ 5 . ~. ~ / Date C. L certify that the alterations or development covered by this permit shall not diminish the fiood~g capacity of the waterway adjoining or crossing this permitted site and that such alterations or development a:re consistent with requirements of the City of College Station City Code, Chapter l3 concerning encroaclunents of floodways and of floodway fringes. Engineer Date D. L do certify that the proposed alterations do not raise the level of the 100 year flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study. Engineer Date Conditions or comments as part of approval: ----------------------------- In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris .rom construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. FINAL PLAT APPLICATION FNLPAPP.DOC 3!25199 3 of3