HomeMy WebLinkAboutDP & City Infrastructure Inspection NoticeDEVELOPMENT PERMIT
PERMIT NO. 12-184
FOR AREAS THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION: SITE ADDRESS:
Lakeridge Subdivision 1198 Jones-Butler Rd.
All Lots DRAINAGE BASIN:
DATE OF ISSUE: 12/20/12 VALID FOR 24 MONTHS
OWNER: CONTRACTOR:
Lakeridge Living LP (c/o Jim Stewart)
P.O. Box 10028
College Station, TX 77842
TYPE OF DEVELOPMENT:
CONDITIONS:
No work beyond limits covered in permit is authorized.
The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-issued.
Development shall not be used or occupied until Certificate of Occupancy is issued.
The permit will expire if no significant work is progressing within 24 months of issuance.
If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-pour) and post construction.
Other permits may have been required to fulfill local, state and federal requirements. Construction will be in compliance with all necessary State and Federal Permits.
Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation
shall not be deposited in city streets, or existing drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan (SWP3) will
be kept and maintained on-site during construction as per TPDES permitting requirements. If it is determined that the prescribed erosion control measures are ineffective to retain all
sediment on-site, it is the Contractor’s responsibility to implement measures that will meet City, State, and Federal requirements.
All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy.
All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development
Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain
is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within
the drip line of any tree required to remain is also prohibited.
All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station,
as well as State and Federal Regulations that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be
allowed.
Special Conditions: ***NO WORK IN TxDOT ROW PRIOR TO PERMIT APPROVAL *** TCEQ PH.II RULES IN EFFECT ***
I, , the Contractor, hereby agree to comply with all conditions herein.
Contractor Date
I hereby grant this permit for development. Contact , the Public Works Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections.
City Engineer/Representative Date
CITY INFRASTRUCTURE
INSPECTION NOTICE
Date: 12/20/12
To: Alan Gibbs
From: Mandi Alford
RE: LAKERIDGE SUBDIVISION
(DP 12-184)
Location: 1198 JONES-BUTLER RD.
Public Water Lines/Fire Hydrants
Public Sanitary Sewer
Public Storm Sewer
Public Streets Engineer’s Estimates Attached
Public Detention Facility Construction Plans Attached
Driveway Connection to Public Street Site Plan Attached
Private Construction within easement SIDEWALKS
No Inspection Required
Comments:
*** NO WORK IN TxDOT ROW PRIOR TO PERMIT APPROVAL. ***
CITY INFRASTRUCTURE
INSPECTION NOTICE
Date: 12/20/12
To: Diane Broadhurst
From: Mandi Alford
RE: LAKERIDGE SUBDIVISION
(DP 12-184)
Location: 1198 JONES-BUTLER RD.
Public Water Lines/Fire Hydrants
Public Sanitary Sewer
Public Storm Sewer
Public Streets Engineer’s Estimates Attached
Public Detention Facility Construction Plans Attached
Driveway Connection to Public Street Site Plan Attached
Private Construction within easement SIDEWALKS
No Inspection Required
Comments: