HomeMy WebLinkAboutEmailsErika Bridges
From: Alan Gibbs
Sent: Wednesday, June 04, 2014 10:26 AM
To:
Cc:
'Travis Nance'; 'rabon@rmengineer.com'; Erika Bridges
Chris Rhodes
Subject:
Attachments:
RE: RE: Complete Memo Greens Prairie Trail Bar Ditch (DP)# 14-1 41
2544_001 .pdf
I'm not looking for a full design, but rather a rough concept to see if drainage can be
accommodated like the attachment -i.e. in a RCP as opposed to costly flat RCBC, etc.
Alan
From: Travis Nance [mailto:travis.nance@oldhamgoodwin.com]
Sent: Wednesday, June 04, 2014 9:11 AM
To: Alan Gibbs; 'rabon@rmengineer.com'; Erika Bridges
Cc: Chris Rhodes
Subject: RE: RE: Complete Memo Greens Prairie Trail Bar Ditch (DP) # 14-141
It doesn't look like I will be able to be there for the meeting due to another committment, but I don't understand how
we are to design to accommodate a future road expansion that has not yet been designed . I've asked the same of 2
other local civil engineers and they are also shrugged their shoulders. Is it possible I am misunderstanding your request
on this item? Won't the City curb, gutter and install storm drainage system and carry the water to the creek at that
time?
Looking forward to getting this started, we have a decent chance of rain next week and I have contractors on standby!
Thanks,
Travis Nance I Senior Vice President
Multifamily Management & Development Services
Oldham Goodwin Group, LLC
Bryan/College Station I Houston
2800 South Texas Avenue, Suite 401
Bryan,Texas77802
P 979.268.2000 I c 979.229.4977
www.OldhamGoodwin.com
@ 2013 Oitiharn Gontiwin Group, LLC. The information herein has been obt?.ined from source$ tit~erni:~ti reliabl<~. Aittiougrl we rJelieve 1t to be <Kcurate. Wt~ have not v~~rified it
and niake no guarantee. warranty or representation about it. It is your responsibility to independentiy confirm its accuracy and completeness. Any projections. assumptions, or
estimates usect are for exa:nple oniy and do not represent the current 01 future pe1formance of the property. The va!ue of this tr?.ns?.rt1011 depends on tilx and other foctors,
which .5hould be evaluated by your tax, f1nanoai, and legal advisors. You and your advi~,ors should conduct il careful, independent ;nve>ngation of the property to determine to
your sat1sfan1011 the suitability ot t11e property for your need~ •.
From: Alan Gibbs [mailto:agibbs@cstx.gov]
Sent: Wednesday, June 04, 2014 8:36 AM
To: 'rabon@rmengineer.com'; Erika Bridges
Cc: Chris Rhodes; Travis Nance
Subject: RE: RE : Complete Memo Greens Prairie Trail Bar Ditch (DP)# 14-141
Rabon,
1
Here are the main brief comments/questions:
1. Provide additional flowline shots : ditch west towards and including main culverts at Greens
Prairie and Royder, ditch eastward .
2. Design and construction should include ditch improvements all the way to noted western main
culverts.
3. Backwater impact from the creek.
4. A profile of the ditch improvements would be beneficial.
5. Confirm there is not additional eastern area draining into subject ditch improvements.
6. Velocity for sheet flow of 0 .25 ft/s appears low, increasing to 1 or 1.5 ft/s would likewise
increase the flow.
7. Berms of 302.8 and 304.1 do not appear to be depicted with the proposed contours.
8. Provide proposed min finished floors for lots adjacent to the ditch in future phase.
9. This submittal did not provide analysis of the private drainage system installed in the rear
of the lots.
10. This should be an NO! not Site Notice to TCEQ .
11. There should be a freeboard from the 100 yr water surface elevation to the berm and
adjacent f i nish floors to account for a margin of error, clogging factor debris in
culverts, etc.
12.A consideration for how the future expansion of Greens Prairie Trail would accommodate this
proposed drainage design.
13. Confirm compaction and vegetation specs .
Thanks,
Alan
From: rabon@rmengineer.com [mailto:rabon@rmengineer.com]
Sent: Tuesday, June 03, 2014 6:57 PM
To: Erika Bridges
Cc: Alan Gibbs; chris@oldhamgoodwin.com; 'Travis Nance'
Subject: Re: RE: Complete Memo Greens Prairie Trail Bar Ditch (DP) # 14-141
I'll be there at 11 :00 unless I hear differently.
Sent from Yahoo Mail on Android
From: Erika Bridges <ebridges@cstx.gov>;
To: 'Rabon Metcalf' <rabon@rmengineer.com>;
Cc: Alan Gibbs <agibbs@cstx.gov>; chris@oldhamgoodwin.com <chris@oldhamgoodwin.com>; 'Travis Nance'
<travis.nance@oldhamgoodwin.com>;
Subject: RE: Complete Memo Greens Prairie Trail Bar Ditch (DP)# 14-141
Sent: Tue, Jun 3, 2014 10:22:23 PM
Rabon,
Alan and I reviewed your submittal this afternoon and have a few comments. The most significant of which is
we think the regrading work should be extended all the way to the creek.
We'd like to sit down and discuss the comments with you if you have some time tomorrow morning. Would 10
or l l work for you?
2
Thanks,
Erika
From: Rabon Metcalf [ mailto:rabon@rmengineer.com]
Sent: Tuesday, June 03 , 2014 5:02 PM
To: chris@oldhamgoodwin.com; 'Travis Nance'
Cc: Erika Bridges; Alan Gibbs
Subject: RE: Complete Memo Greens Prairie Trail Bar Ditch (DP)# 14-141
Ericka:
Attached is the fully executed DP. Per my voice message OGG has a contractor lined up to do this work as soon
as it is permitted. Please let me know a timeline of when you will expect to be completed with review.
Thanks,
Rabon A. Metcalf, P.E., C.F.M.
3800 SH No. 6, Suite 108G < 77845>
P. 0. Box 9253
College Station, TX 77842
Off (9 79) 764-0704
Fax: (979) 764-0704
711e in.for111afion transmit1ed. by Rlv/E Consulting Engineers (RME),.for the above rejerencedprojecl is considered by RME to be confidential. This material is in/ended
ON!. Y for the use of the recipient named above and permission is not granted to the recipientjiir distribution of these documents in anyjiirm or.fashion. The recipient
understands and agrees to R,~1E that upon release of these documents is 110 longer responsible for their use or 111odificatio11. The user and recipielll of the documents
3
accept fall responsibility a11d liability for any consequences arising 0111 of the use of these documents.
From: Deborah Grace-Rosier [mailto:dgrace@cstx.gov]
Sent: Tuesday, June 03 , 2014 10:35 AM
To: 'Rabon Metcalf'; 'chris@oldhamgoodwin.com'
Cc: Erika Bridges
---------------
Subject: Complete Memo Greens Prairie Trail Bar Ditch (DP)# 14-141
Good afternoon!
Please see the attached memo regarding your project. If you should have any questions, please contact the
Project Manager listed in the attached memo.
Thank you!
Deborah Grace-Rosier "Grace"
Staff Assistant
Planning & Development Services
Phone: 979-764-3784
Fax: 979-764-3496
www.cstx.gov
City of College Station
Home of Texas A&M University
4
City of College Station
Home of Texas A&M University ®
City of College Station
Home of Texas A&M University ®
City of College Station
Home of Texas A&M University ®
5