Loading...
HomeMy WebLinkAboutEmails with Satff and Applicant.. Erika Bridges From: Erika Bridges Sent: To: Cc: Tuesday, August 12, 2014 11:32 AM 'Rabon Metcalf'; 'Chris Rhodes' Alan Gibbs Subject: RE: Creek Meadows, S3Pl -College Station, TX: GPT Bar-Ditch As-Bu ilt Rabon/Chris, Sorry for the delay in getting back with you on this item. After comparing the as-builts with the original design, it looks like there are a few issues that still need to be addressed. Starting around the temporary emergency access and continuing to the creek, the grades appear to be anywhere from 0.5-ft to 1-ft too high. Additionally, the flowline of the ditch seems to meander 5-ft or so toward Greens Prairie Tri., and t he berm near Shady Brook Ln. looks like it was built about 0.5-ft low. Not sure what happened t he first time, but hopefully the contractor can utilize survey equipment to avoid further busted elevations and a meandering centerline of the ditch. While the drainage and excess water on the commercial tract may be tolerable right now, we feel that this area really needs to be cut, re-graded, and day-lighted at the creek per plan in order to ensure proper drainage and avoid further flooding issues. We will be happy to issue an LOC for this work separately or, at a minim um, we will tie it to the LOC for Section 3, Phase 2. When the grading is complete, we will need 2 sets of as-built drawings including the contractor and engineer's certifications. Please let us know if you have any questions. Thanks, Erika From: Rabon Metcalf [mailto:rabon@rmengineer.com] Sent: Monday, July 28, 2014 5:25 PM To: Alan Gibbs; Erika Bridges Cc: 'Chris Rhodes' Subject: FW: Creek Meadows, S3Pl -College Station, TX: GPT Bar-Ditch As-Built See email string below and attached as-built shots. Rabon A. Metcalf, P.E., C.F.M. r. COft!SIU#r,ing &Jlginieier.s -·- 3800 SH No. 6, Suite 108G <77845> P.O. Box 9253 College Station, TX 77842 Off: (979) 764-0704 Fax: (979) 764-0704 The information transmitted, by RME Consulting Engineers (RME), for the above referenced project is considered by RME to be confidential. This material is intended ONL Y for the use of the recipient nomed obove and permission is not granted to the recipient for distribution of these documents in any form or fashion. The recipient understands and agrees to RME that upon release of these documents is no longer responsible for their use or modification. The user ond recipient of the documents accept full responsibility ond liability for ony consequences arising out of the use of these documents. 1 .. From: Chris Rhodes [mailto:chris.rhodes@oldhamgoodwin.com] Sent: Monday, July 28, 2014 5:24 PM To: Rabon Metcalf Subject: RE: Creek Meadows, S3P1 -College Station, TX: GPT Bar-Ditch As-Built Rabon, I am fine with the ditch as constructed since the areas where it is shallower are beyond the residential development sections and will need to be addressed with t he future commercial tract whenever it is built out. If some water fans out in this area for now it will not adversely affect anything we are doing (and it appears after the heavy rainfall event a couple of weeks ago to be working fine anyway.) Please let me know when we can get a Letter of Completion on this project. Thanks, Chris Rhodes, LEED AP Vice President I Construction Management Development Serv ices Oldham Goodwin Group, LLC Bryan/Col lege Station I Houston 2800 South Texas Avenue, Suite 401 Bryan, Texas 77802 P 979.268.2000 I c 979.219.1102 www.OldhamGoodwin.com @ 20.13 Oldham Goodwin Group, l..l.C. Thi:, email ,rnd any files transmitted with it are coni1dential ancl intended solely for the use of the inclividuai oc ent;:y to whom they are addressed. This message contains confidential information and is intended only for the individutll named. If you c.ue not the nc.1rned addressetl you should not disseminate, distribute or copy this e-mail. Plea:;~· notify the sender irnmed;ately by e·rn0il if you have received this e-mail by mistake and delete this e .. mail from your systern. If you are not the intendt1d r<:.1ctpient you are notified that disclosing; copying, distributing or taking any action in reliance on the contents of this inforn1ation is strictly prot11bited. From: Rabon Metcalf [mailto:rabon@rmengineer.com] Sent: Monday, July 28, 2014 3:14 PM To: Chris Rhodes Subject: Creek Meadows, S3P1 -College Station, TX: GPT Bar-Ditch As-Built Chris: Attached is my as-built survey of the GPT bar-ditch. Everything looks pretty close except for between 5+00 and 6+00, and downstream, BVS shallowed up. Thanks, Rabon A. Metcalf, P.E., C.F.M. 3800 SH No. 6, Suite 108G < 77845> P.O. Box 9253 College Station, TX 77842 Off: (979) 764-0704 Fax: (979) 764-0704 2 Erika Bridges From: Rabon Metcalf [rabon@rmengineer.com] Wednesday, June 04 , 2014 1 :33 PM Sent: To: Cc: Alan Gibbs; Erika Bridges chris@oldhamgoodwin·.com ; 'Travis Nance' Subject: RE : RE: Complete Memo Greens Prairie Trail Bar Ditch (DP)# 14-141 CM S3P1-2-NOl-060214.pdf Attachments: Brief recap of the comments be low. The game plan is to submit revised signed/sealed drawings tomorrow morning. Please let me know if they can be issued same day or next. Rabon A. Metcalf, P.E., C.F.M. '~ , Catni:!lldlkin§ &ld'nlll!ii!ilr.S -....__ t ' 3800 SH No. 6, Suite 108G < 77845> P.O. Box 9253 College Station, TX 77842 Off: (979) 764-0704 Fax: (979) 764-0704 The information transmitted, by RME Consulting Engineers {RME), for the above referenced project is considered by RME ta be confidential. This material is intended ONLY for the use of the recipient named above and permission is not granted ta the recipient far distribution of these documents in any form or fashion. The recipient understands and agrees ta RME that upon release of these documents is no longer responsible for their use or modification. The user and recipient of the documents accept full responsibility and liability for any consequences arising out of the use of these documents. From: Alan Gibbs [mailto:agibbs@cstx.gov] Sent: Wednesday, June 04, 2014 8:36 AM To: 'rabon@rmengineer.com'; Erika Bridges Cc: chris@oldhamgoodwin.com; 'Travis Nance' Subject: RE: RE: Complete Memo Greens Prairie Trail Bar Ditch (DP)# 14-141 Rabon, Here are the main brief comments/questions: 1. Provide additional flowline shots: ditch west towards and including main culverts at Greens Prairie and Royder, ditch eastward. Will be provided. 2. Design and construction should include ditch improvements all the way to noted western main culverts. May not be necessary. Will analyze; 3. Backwater impact from the creek. Statement of my opinion most likely will suffice; 4. A profile of the ditch improvements would be beneficial. Will provide; 5. Confirm there is not additional eastern area draining into subject ditch improvements. Drainage area is good; 6. Velocity for sheet flow of 0.25 ft/s appears low, increasing to 1 or 1.5 ft/s would likewise increase the flow. Adjust to 1.0 fps as a conservative approach; 7. Berms of 302.8 and 304.1 do not appear to be depicted with the proposed contours . Adjust if necessary (per comment #6); 8. Provide proposed min finished floors for lots adjacent to the ditch in future phase . Will provide; 9. This submittal did not provide analysis of the private drainage system installed in the rear of the lots. Not needed since the bar-ditch will be completely isolated during the 100-year event; 1 10. This should be an NO! not Site Notice to TCEQ. The signature pages of both were sent yesterday. Attached is the rest of t he NO!; 11. There should be a freeboard from the 100 yr water surface elevation to the berm and adjacent finish floors to account for a margin of error, clogging factor debris in culverts, etc. Disc ussed. The design includes 6" above the 100-year event and the conveyance of runoff will be wholly contained in the ba r -ditch; 12 .A consideration for how the future expansion of Greens Prairie Trail would accommodate this proposed drainage design. VE RY brief thoughts on piping will be illustrated on profile; 13.Confirm compaction and vegetation specs. Compaction efforts will be noted on berms. Vegetation (hydro-seeding) wi l l be provided for all disturbed areas; Thanks, Alan From: rabon@rmengineer.com [mailto: rabon@rmengineer.com] Sent: Tuesday, June 03, 2014 6:57 PM To: Erika Bridges Cc: Alan Gibbs; chris@oldhamgoodwin.com; 'Travis Nance' Subject: Re: RE: Complete Memo Greens Prairie Trail Bar Ditch (DP)# 14-141 I'll be there at 11 :00 unless I hear differently. Sent from Yahoo Mail on Android From: Erika Bridges <ebridges@cstx.gov>; To: 'Rabon Metcalf' <rabon@rmengineer.com>; Cc: Alan Gibbs <agibbs@cstx.gov>; chris@oldhamgoodwin.com <chris@oldhamgoodwin.com>; 'Travis Nance' <travis.nance@oldhamgoodwin.com>; Subject: RE: Complete Memo Greens Prairie Trail Bar Ditch {DP)# 14-141 Sent: Tue, Jun 3, 2014 10:22:23 PM Rabon, Alan and I reviewed your submittal this afternoon and have a few comments. The most significant of which is we think the regrading work should be extended all the way to the creek. We'd like to sit down and discuss the comments with you if you have some time tomorrow morning. Would 10 or 11 work for you? Thanks, Erika From: Rabon Metcalf [mailto:rabon@rmengineer.com] Sent: Tuesday, June 03, 201 4 5:02 PM 2 To: chris@oldhamgoodwin.com; 'Travis Nance' Cc: Erika Bridges; Alan Gibbs Subject: RE: Complete Memo Greens Prairie Trail Bar Ditch (DP)# 14-141 Ericka: Attached is the fully executed DP. Per my voice message OGG has a contractor lined up to do this work as soon as it is permitted. Please let me know a timeline of when you will expect to be completed with review. Thanks, Rabon A. Metcalf, P.E., C.F.M. ( ' 3800 SH No. 6. Suite 108G < 77845> P. 0. Box 9253 College Station, TX 77842 Off (9 79) 764-0704 Fax: (979) 764-070.:/ The information tra11smil!ed. by Riv!E Consulting Engineers (RME), for 1/ie above referenced project is considered by RME IO be confidential. 711is material is intended ONLY for the use of the recipient named above and permission is 11ot granted 10 the reci11ien1for distribution of these documents in any form or fashion. The recipient understands and agrees to RME that upon release of these documents is 110 longer responsible for their use or 111odificatio11. The user and recipient of the documents accept full responsibility and liability.for a11y co11seq11e11ces arising out of tire use of these documents. From: Deborah Grace-Rosier [mailto:dgrace@cstx.gov] Sent: Tuesday, June 03 , 2014 10:35 AM To: 'Rabon Metcalf; 'chris@oldhamgoodwin.com' Cc: Erika Bridges Subject: Complete Memo Greens Prairie Trail Bar Ditch (DP)# 14-141 3 Good afternoon! Please see the attached memo regarding your project. If you should have any questions, please contact the Project Manager listed in the attached memo. Thank you! Deborah Grace-Rosier "Grace" Staff Assistant Planning & Development Services Phone: 979-764-3784 Fax: 979-764-3496 www.cstx.gov City of College Station Home of Texas A&M University City of College Station Home of Texas A&M University ® City of College Station Home of Texas A&M University ® 4 City of College Station Home of Texas A&M University ® 5