HomeMy WebLinkAboutEmails with Satff and Applicant..
Erika Bridges
From: Erika Bridges
Sent:
To:
Cc:
Tuesday, August 12, 2014 11:32 AM
'Rabon Metcalf'; 'Chris Rhodes'
Alan Gibbs
Subject: RE: Creek Meadows, S3Pl -College Station, TX: GPT Bar-Ditch As-Bu ilt
Rabon/Chris,
Sorry for the delay in getting back with you on this item. After comparing the as-builts with the original design, it looks
like there are a few issues that still need to be addressed. Starting around the temporary emergency access and
continuing to the creek, the grades appear to be anywhere from 0.5-ft to 1-ft too high. Additionally, the flowline of the
ditch seems to meander 5-ft or so toward Greens Prairie Tri., and t he berm near Shady Brook Ln. looks like it was built
about 0.5-ft low. Not sure what happened t he first time, but hopefully the contractor can utilize survey equipment to
avoid further busted elevations and a meandering centerline of the ditch.
While the drainage and excess water on the commercial tract may be tolerable right now, we feel that this area really
needs to be cut, re-graded, and day-lighted at the creek per plan in order to ensure proper drainage and avoid further
flooding issues. We will be happy to issue an LOC for this work separately or, at a minim um, we will tie it to the LOC for
Section 3, Phase 2. When the grading is complete, we will need 2 sets of as-built drawings including the contractor and
engineer's certifications. Please let us know if you have any questions.
Thanks,
Erika
From: Rabon Metcalf [mailto:rabon@rmengineer.com]
Sent: Monday, July 28, 2014 5:25 PM
To: Alan Gibbs; Erika Bridges
Cc: 'Chris Rhodes'
Subject: FW: Creek Meadows, S3Pl -College Station, TX: GPT Bar-Ditch As-Built
See email string below and attached as-built shots.
Rabon A. Metcalf, P.E., C.F.M.
r. COft!SIU#r,ing &Jlginieier.s -·-
3800 SH No. 6, Suite 108G <77845>
P.O. Box 9253
College Station, TX 77842
Off: (979) 764-0704
Fax: (979) 764-0704
The information transmitted, by RME Consulting Engineers (RME), for the above referenced project is considered by RME to be confidential. This material is intended
ONL Y for the use of the recipient nomed obove and permission is not granted to the recipient for distribution of these documents in any form or fashion. The recipient
understands and agrees to RME that upon release of these documents is no longer responsible for their use or modification. The user ond recipient of the documents
accept full responsibility ond liability for ony consequences arising out of the use of these documents.
1
..
From: Chris Rhodes [mailto:chris.rhodes@oldhamgoodwin.com]
Sent: Monday, July 28, 2014 5:24 PM
To: Rabon Metcalf
Subject: RE: Creek Meadows, S3P1 -College Station, TX: GPT Bar-Ditch As-Built
Rabon,
I am fine with the ditch as constructed since the areas where it is shallower are beyond the residential development
sections and will need to be addressed with t he future commercial tract whenever it is built out. If some water fans out
in this area for now it will not adversely affect anything we are doing (and it appears after the heavy rainfall event a
couple of weeks ago to be working fine anyway.) Please let me know when we can get a Letter of Completion on this
project.
Thanks,
Chris Rhodes, LEED AP
Vice President I Construction Management
Development Serv ices
Oldham Goodwin Group, LLC
Bryan/Col lege Station I Houston
2800 South Texas Avenue, Suite 401
Bryan, Texas 77802
P 979.268.2000 I c 979.219.1102
www.OldhamGoodwin.com
@ 20.13 Oldham Goodwin Group, l..l.C. Thi:, email ,rnd any files transmitted with it are coni1dential ancl intended solely for the use of the inclividuai oc ent;:y to whom
they are addressed. This message contains confidential information and is intended only for the individutll named. If you c.ue not the nc.1rned addressetl you should not
disseminate, distribute or copy this e-mail. Plea:;~· notify the sender irnmed;ately by e·rn0il if you have received this e-mail by mistake and delete this e .. mail from your
systern. If you are not the intendt1d r<:.1ctpient you are notified that disclosing; copying, distributing or taking any action in reliance on the contents of this inforn1ation is
strictly prot11bited.
From: Rabon Metcalf [mailto:rabon@rmengineer.com]
Sent: Monday, July 28, 2014 3:14 PM
To: Chris Rhodes
Subject: Creek Meadows, S3P1 -College Station, TX: GPT Bar-Ditch As-Built
Chris:
Attached is my as-built survey of the GPT bar-ditch. Everything looks pretty close except for between 5+00 and 6+00,
and downstream, BVS shallowed up.
Thanks,
Rabon A. Metcalf, P.E., C.F.M.
3800 SH No. 6, Suite 108G < 77845>
P.O. Box 9253
College Station, TX 77842
Off: (979) 764-0704
Fax: (979) 764-0704
2
Erika Bridges
From: Rabon Metcalf [rabon@rmengineer.com]
Wednesday, June 04 , 2014 1 :33 PM Sent:
To:
Cc:
Alan Gibbs; Erika Bridges
chris@oldhamgoodwin·.com ; 'Travis Nance'
Subject: RE : RE: Complete Memo Greens Prairie Trail Bar Ditch (DP)# 14-141
CM S3P1-2-NOl-060214.pdf Attachments:
Brief recap of the comments be low. The game plan is to submit revised signed/sealed drawings tomorrow morning.
Please let me know if they can be issued same day or next.
Rabon A. Metcalf, P.E., C.F.M.
'~ , Catni:!lldlkin§ &ld'nlll!ii!ilr.S -....__
t ' 3800 SH No. 6, Suite 108G < 77845>
P.O. Box 9253
College Station, TX 77842
Off: (979) 764-0704
Fax: (979) 764-0704
The information transmitted, by RME Consulting Engineers {RME), for the above referenced project is considered by RME ta be confidential. This material is intended
ONLY for the use of the recipient named above and permission is not granted ta the recipient far distribution of these documents in any form or fashion. The recipient
understands and agrees ta RME that upon release of these documents is no longer responsible for their use or modification. The user and recipient of the documents
accept full responsibility and liability for any consequences arising out of the use of these documents.
From: Alan Gibbs [mailto:agibbs@cstx.gov]
Sent: Wednesday, June 04, 2014 8:36 AM
To: 'rabon@rmengineer.com'; Erika Bridges
Cc: chris@oldhamgoodwin.com; 'Travis Nance'
Subject: RE: RE: Complete Memo Greens Prairie Trail Bar Ditch (DP)# 14-141
Rabon,
Here are the main brief comments/questions:
1. Provide additional flowline shots: ditch west towards and including main culverts at
Greens Prairie and Royder, ditch eastward. Will be provided.
2. Design and construction should include ditch improvements all the way to noted western main
culverts. May not be necessary. Will analyze;
3. Backwater impact from the creek. Statement of my opinion most likely will suffice;
4. A profile of the ditch improvements would be beneficial. Will provide;
5. Confirm there is not additional eastern area draining into subject ditch improvements.
Drainage area is good;
6. Velocity for sheet flow of 0.25 ft/s appears low, increasing to 1 or 1.5 ft/s would
likewise increase the flow. Adjust to 1.0 fps as a conservative approach;
7. Berms of 302.8 and 304.1 do not appear to be depicted with the proposed contours . Adjust
if necessary (per comment #6);
8. Provide proposed min finished floors for lots adjacent to the ditch in future phase . Will
provide;
9. This submittal did not provide analysis of the private drainage system installed in the
rear of the lots. Not needed since the bar-ditch will be completely isolated during the
100-year event;
1
10. This should be an NO! not Site Notice to TCEQ. The signature pages of both were sent
yesterday. Attached is the rest of t he NO!;
11. There should be a freeboard from the 100 yr water surface elevation to the berm and
adjacent finish floors to account for a margin of error, clogging factor debris in
culverts, etc. Disc ussed. The design includes 6" above the 100-year event and the
conveyance of runoff will be wholly contained in the ba r -ditch;
12 .A consideration for how the future expansion of Greens Prairie Trail would accommodate this
proposed drainage design. VE RY brief thoughts on piping will be illustrated on profile;
13.Confirm compaction and vegetation specs. Compaction efforts will be noted on berms.
Vegetation (hydro-seeding) wi l l be provided for all disturbed areas;
Thanks,
Alan
From: rabon@rmengineer.com [mailto: rabon@rmengineer.com]
Sent: Tuesday, June 03, 2014 6:57 PM
To: Erika Bridges
Cc: Alan Gibbs; chris@oldhamgoodwin.com; 'Travis Nance'
Subject: Re: RE: Complete Memo Greens Prairie Trail Bar Ditch (DP)# 14-141
I'll be there at 11 :00 unless I hear differently.
Sent from Yahoo Mail on Android
From: Erika Bridges <ebridges@cstx.gov>;
To: 'Rabon Metcalf' <rabon@rmengineer.com>;
Cc: Alan Gibbs <agibbs@cstx.gov>; chris@oldhamgoodwin.com <chris@oldhamgoodwin.com>; 'Travis Nance'
<travis.nance@oldhamgoodwin.com>;
Subject: RE: Complete Memo Greens Prairie Trail Bar Ditch {DP)# 14-141
Sent: Tue, Jun 3, 2014 10:22:23 PM
Rabon,
Alan and I reviewed your submittal this afternoon and have a few comments. The most significant of which is
we think the regrading work should be extended all the way to the creek.
We'd like to sit down and discuss the comments with you if you have some time tomorrow morning. Would 10
or 11 work for you?
Thanks,
Erika
From: Rabon Metcalf [mailto:rabon@rmengineer.com]
Sent: Tuesday, June 03, 201 4 5:02 PM
2
To: chris@oldhamgoodwin.com; 'Travis Nance'
Cc: Erika Bridges; Alan Gibbs
Subject: RE: Complete Memo Greens Prairie Trail Bar Ditch (DP)# 14-141
Ericka:
Attached is the fully executed DP. Per my voice message OGG has a contractor lined up to do this work as soon
as it is permitted. Please let me know a timeline of when you will expect to be completed with review.
Thanks,
Rabon A. Metcalf, P.E., C.F.M.
( '
3800 SH No. 6. Suite 108G < 77845>
P. 0. Box 9253
College Station, TX 77842
Off (9 79) 764-0704
Fax: (979) 764-070.:/
The information tra11smil!ed. by Riv!E Consulting Engineers (RME), for 1/ie above referenced project is considered by RME IO be confidential. 711is material is intended
ONLY for the use of the recipient named above and permission is 11ot granted 10 the reci11ien1for distribution of these documents in any form or fashion. The recipient
understands and agrees to RME that upon release of these documents is 110 longer responsible for their use or 111odificatio11. The user and recipient of the documents
accept full responsibility and liability.for a11y co11seq11e11ces arising out of tire use of these documents.
From: Deborah Grace-Rosier [mailto:dgrace@cstx.gov]
Sent: Tuesday, June 03 , 2014 10:35 AM
To: 'Rabon Metcalf; 'chris@oldhamgoodwin.com'
Cc: Erika Bridges
Subject: Complete Memo Greens Prairie Trail Bar Ditch (DP)# 14-141
3
Good afternoon!
Please see the attached memo regarding your project. If you should have any questions, please contact the
Project Manager listed in the attached memo.
Thank you!
Deborah Grace-Rosier "Grace"
Staff Assistant
Planning & Development Services
Phone: 979-764-3784
Fax: 979-764-3496
www.cstx.gov
City of College Station
Home of Texas A&M University
City of College Station
Home of Texas A&M University ®
City of College Station
Home of Texas A&M University ®
4
City of College Station
Home of Texas A&M University ®
5