Loading...
HomeMy WebLinkAboutCost EstimateNO. 1 2 3 4 5 6 7 8 9 Engineer's Cost Estimate CREEK MEADOWS -SECTION 3, PHASE TWO G.P.T. BAR-DITCH COLLEGE STATION, BRAZOS COUNTY, TEXAS UNIT DESCRIPTION QUANTITY UNIT COST Mobilization, Construction Staking & All Required 1 LS $1 ,200.00 Testing by Contractor SWPP Measures (Rock Rip-Rap & Hydro-Mulch 1 LS $2,500.00 Seeding) Remove Existing CMP Driveway Culvert 2 EA $500.00 In-Place Earthwork Excavation 1,670 CY $4.00 In-Pace Earthwork Embankment 150 CY $4.50 6:1 SET (18" Pipe) 2 EA $800.00 18" RCP (CL 3) Storm Sewer w/Cement Stabilized 40 LF $75.00 Sand Bedding & Structural Backfill Remove & Reinstall Existing 18" RCP (CL 3) Storm Sewer w/Cement Stabilized Sand Bedding & Structural Backfill w/6:1 SET (Both Sides) Emergency Roadway Patch ,,,,,,, ,, 40 LF $50.00 1 LS $800.00 ESTIMATED CONSTRUCTION COST = 10% CONTINGENCY= TOTAL COST $1,200.00 $2,500.00 $1,000.00 $6,680.00 $675.00 $1 ,600.00 $3,000.00 $2,000.00 $800.00 $19,455.00 $1,945.50 GRAND TOTAL= $21,400.50 , RME Consulting Engineers TEXAS FIRM REGISTRATION No. F-4695 POST OFFICE BOX 9253 COLLEGE STATION, TEXAS 77842 OFF/FAX: (979) 764-0704 E-mail: civil@rmengineer.com Estimates and projections prepared by RME Consulting Engineers relating to construction costs and schedules, operation and maintenance costs, equipment characteristics and performance, and operating results are based on this office's experience, qualifications and judgment as a design professional. Since RME has no control over weather, cost and availability of labor, material and equipment, labor productivity, construction contractor's procedures and methods, unavoidable delays, construction contractor's methods of determining prices, economic conditions, competitive bidding or market conditions and other factors affecting such estimates or projections, this office does not guarantee that actual rates, costs, performance, schedules, etc., will not vary from estimates and projections prepared by the Engineer ofrecord. CD1-260-0531-EO 1.xlsx 1 of 1