Loading...
HomeMy WebLinkAboutDevelopment PermitDEVELOPMENT PERMIT PERMIT NO. 09-20 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION! Magnified H•alth & Rehab Called 2.805 Ac. Tract Vol. 4984, Pg. 1"46 & Vol. 3927, Pg. 169g DATE OF ISSUE: 6130/09 OWNER: Descending Dove LLC ( clo Mark Bixler) 475 Jack Kramer Dr. Memphis, TN 38117 SITE ADDRESS: 1115 Anderson St DRAINAGE BASIN: Main Bee Creek VALID FOR 24 MONTHS CONTRACTOR: TYPE OF DEVELOPMENT: Full Development Pennlt SPECIAL CONDITIONS: Atl construction muat be in compliance with th• approved construotlon plans All tree:s rBquired to be protected a. part of the landscape plan must be completely barricaded in accordance with Section 7.5.E .• Landscape/StrMtscape Plan Requirement& of ttie City's Unified Development OrdinllOOQ, prior to any operations of thl• permil The cleaning of equipment or materiala within the drip lne of any tree or group of trwt that are protected and required to remain ie •lrlctly prohibited. The d~aal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tnM required to remain is also prohibited. _,. TCEQ PHASE II RULES IN EFFECT .... The Contractor ahaD take all nec: ... my pnteaUtions to prevent silt and debris from leaving the Immediate construction •lte in accordance with the approved erosion control ptan as well a. lhe City of CoUege Station Drainage Policy and Design Criteria. If it ki determined lhe prescribed eroalon control measunn; ar• Ineffective to retain all •edlment onsite, it is the contractor. responsibility to implement meaaurea that will meet City, State and Federal requirements. The Owner and/or Contractor shall assure that all di&Wrbecl areas are sodden and eateb~shment of vegetation occur& prior to "'moval of any slit fencing or hay beloe uacd for temporary erosion control. The Owner aod/or Contractor shall ai.o Insure that any disturbed vegetation be returned to its original condition, plaeemant and atate. The Owner and/or Contractor &hlilll be responalble for any damage to adjacent properties. city streets or lntraatructtJre due to heavy machinery and/or equipment as well u eroalon, siltation or sedimentation reeultlng from the permitted work. In accordane& With Chaptar 13 of the Code of Ordlnanoet of the City of College Stalion, measurea shall ~ taken to insure that debris from conatructlon, ero5ion, and sedimentation shall not be deposited in city streets, or exlllting drainage facifities. I hereby grant this pennlt for develOpment of an are• outside the special 1lood h82:ard area. All development shall be In accordance with th• plAM and specifications 11ubmltted to end approved by the City Engineer in thG ·development permit application for the abova named project and all Qf the codes and ordinances of the Clty of College Station that apply. Date 7/z_tt(tCf Date 239t:Jd 669!SSb299! J l l ~tJ 9b:S0 6002-b!-60 DEVELOPMENT PERMIT PERMIT NO. 09-20 CITY OF COLLEGE STATION Planning & Devtlopmmt Snvius FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Magnified Health & Rehab Called 2.805 Ac. Tract Vol. 4984, Pg. 146 & Vol. 3927, Pg . 159g DATE OF ISSUE: 6/30/09 OWNER: Descending Dove LLC (c/o Mark Bixler) 475 Jack Kramer Dr. Memphis, TN 38117 SITE ADDRESS: 1115 Anderson St. DRAINAGE BASIN: Main Bee Creek VALID FOR 24 MONTHS CONTRACTOR: TYPE OF DEVELOPMENT: Full Development Permit SPECIAL CONDITIONS: All construction must be in compliance with the approved construction plans All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section 7.5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as , but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. *** TCEQ PHASE II RULES IN EFFECT*** The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite, it is the contractors responsibility to implement measures that will meet City, State and Federal requirements. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. Date ti IC(r-o c; Date