Thank you for the submittal of your SITE PLAN - COMMERCIAL and NON-RESIDENTIAL
ARCHITECTURE STANDARDS applications. This project will be distributed to staff next week
for their review.
cc: B/CS Regional Association of Realtors, via email: executiveofficer(cDbcsreaIto r.com
Fred Paine, Kling Engineering & Surveying, via email fred(cDklingeng.com
Case file no. 12-00500056 (SP)
Case file no. 12-00500057 (NRA)
1101 Texas Avenue, P.O. Box
9960
1/ College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
r n UAI J:GIS STATION
Jr —ABM Uxlwniry'
MEMORANDUM
March 29, 2012
TO: Jason Kinnard, Jim Singleton Architects, via email: Jason(cDisarchitects.com
FROM: Teresa Rogers, Staff Planner
Jason Schubert, AICP, Principal Planner
SUBJECT: B/CS Regional Association of Realtors (SP)
Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information by any Monday at 10:00 a.m. for further staff review:
City of College Station Transmittal Letter;
Memo providing written responses to all of staff's comments (identify the specific
page that each comment was addressed on or the reason for not addressing the
comment);
Seven (7) complete sets of site civil construction documents for the proposed
development with the revised site and landscaping plans attached (one set will
be returned to you, please submit additional copies if you want more than one
approved set);
Two (2) revised site plans;
One (1) landscaping plan;
One (1) 11x17 grading and erosion control plan;
Easement Dedication Sheet and required documents (please note that the Site
Plan will not be stamped approved until the Blanket Easement, or all other
appropriate easements, have been dedicated to the City of College Station).
Please note that this application will expire in 90 days from the date of this memo, if the
applicant has not provided written response comments and revised documents to the
Administrator that seek to address the staff review comments contained herein. If there are
comments that you are not addressing with the revised site plan, please attach a letter
explaining the details. If you have any questions or need additional information, please contact
Teresa Rogers at 979.764.3570.
Attachments: Staff review comments
PC: B/CS Regional Association of Realtors, via email: executiveofficer(cDbcsreaIto r.com
Fred Paine, Kling Engineering & Surveying, via email: fred(ftlingeng.com
Case file no. 12-00500056 (SP)
Home of TexasA&M University,
STAFF REVIEW COMMENTS NO. 1
Project: B/CS Regional Association of Realtors (SP — 12-00500056)
PLANNING
1. According to the Crescent Pointe Protective Covenants the minimum requirements for
parking and paving setbacks have not been met. Please review these requirements and
revise as necessary.
2. The end parking space located closest to Lot 9R is approximately 15 feet in depth and
interferes with the drive aisle. Revise the parking space to meet the minimum size
requirements of 9 feet by 18 feet and additionally insure the drive aisle has a minimum 23
foot clearance. The end island dimensions must also continue to meet the 180 square feet
minimum size requirement.
3. Label parking setback distance from R.O.W. to curb of parking lot.
4. Label the striping across the driveway. It appears to be a painted handicapped accessible
route.
5. Provide temporary curbing, according to Site Design Standards, at the Phase Line
boundary.
6. Revise the bike rack detail on C4.1 and Site Notes # 81 to match.
7. Please clarify how sanitation will be served for Phase 1. Phasing must be completed so that
each individual phase meets all requirements. Currently, the dumpster is included in Phase
2 construction, but it may be necessary as part of Phase 1.
8. Verify the proposed hammerhead for dumpster access meets the Site Design Standards
required for a turnaround.
9. Site Specific Note #7 should be amended to include the proposed use and improvements.
10. Add a label on the Site Plan noting the gross square footage of the building.
11. Revise the general note on the site plan that all roof and ground -mounted mechanical
equipment shall be screened from view or isolated so as not to be visible from any public
right-of-way or residential district within 150' of the subject lot, measured from a point five
feet above grade. Such screening shall be coordinated with the building architecture and
scale to maintain a unified appearance.
12. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter. Any additional changes
on these plans that the City has not be made of aware of will constitute a completely new
review.
13. Item # 30 is missing from the Verizon & Suddenlink Cable Notes. Is this intended to be item
# 33?
Reviewed by: Teresa Rogers Date: March 28, 2012
LANDSCAPING/STREETSCAPING/BUFFER
1. Point totals provided for the shrubs, as part of the plant list, should be revised giving Maiden
Grass 270 points and Texas Sage 740 points, for a total of 1,010 points.
2. Revise General Notes to include the following: Irrigation system must be protected by either
a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -
Check Back Flow Device, and installed as per City Ordinance 2394.
3. Revise General Notes to include the following: All back flow devices will be installed and
tested upon installation as per City Ordinance 2394.
Reviewed by: Teresa Rogers Date: March 28, 2012
Page 2 of 2
ENGINEERING COMMENTS NO. 1
1. Please submit an NOI.
2. Please submit an Engineer's Cost Estimate.
3. Please submit a Letter of Acknowledgment.
4. C1.1 —What portion of the storm will be built with Phase I construction?
5. C1.1 — Label the water meter sizes.
6. C1.1 — Add a note indicating building size, construction material type, whether or not the
building will be sprinkled, and the required fire flow per the 2012 IFC.
7. C1.1 — Please label each fire hydrant with required fire flow to achieve the necessary
total.
8. C1.1 — Add note specifying the material of the private water, sanitary sewer, and storm
sewer lines.
9. C1.1 — Label the volume and page number of the 10-ft Verizon Easement.
10. C2.1 —Add IPB to curb inlet just downstream of property.
11. C2.1 — Please remove "SWPY from the title block.
12. C2.1 — Add City Standard Details for Erosion Control.
13. C3.1 — Use City Standard Details for public curb ramps and storm sewer.
14. C3.1 — Please show the fire hydrant and water, phone, and sanitary sewer lines in profile
crossing the storm. It looks like there may be some conflicts.
15. C3.1 — Although the possibility of running a parallel HDPE storm sewer was previously
discussed, we feel that the other option you proposed of tying into the original storm
sewer and upsizing a portion of that pipe is actually preferable. At that time, we were
unaware of numerous utilities including storm, water, fire hydrant, sanitary sewer, gas,
telephone, and cable running in that portion of the right-of-way with little separation
distance and potential crossing conflicts. Please revise.
Reviewed by: Erika Bridges Date: 3/30/12
GENERAL ELECTRICAL COMMENTS NO. 2
1. Developer installs conduit per CSU specs and design.
2. CSU will provide drawings for electrical installation.
3. Developer will intercept existing conduit at designated transformers or other existing
devices and extend as required.
4. If conduit does not exist at designated transformer or other existing devices,
developer will furnish and install conduit as shown on CSU electrical layout.
5. Developer provides load data to CSU as soon as it is available to avoid
construction delays. Delivery time for transformers not in stock is approximately 24
weeks.
6. Final site plan must show all proposed electrical facilities necessary to provide
electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and
conduit routing as designed by CSU.
7. To discuss any of the above electrical comments please contact Sam Weido at
979.764.6314.
Reviewed by: Sam Weido Date: 5.10.12
1101 Texas Avenue, P.O. Box
9960
1/ College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
r n UAI J:GIS STATION
Jr —ABM Uxlwniry'
MEMORANDUM
April 2, 2012
TO: Jason Kinnard, Jim Singleton Architects, via email: Jason(cDisarchitects.com
FROM: Teresa Rogers, Staff Planner
Jason Schubert, AICP, Principal Planner
SUBJECT: B/CS Regional Association of Realtors (SP)
Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information by any Monday at 10:00 a.m. for further staff review:
City of College Station Transmittal Letter;
Memo providing written responses to all of staff's comments (identify the specific
page that each comment was addressed on or the reason for not addressing the
comment);
Seven (7) complete sets of site civil construction documents for the proposed
development with the revised site and landscaping plans attached (one set will
be returned to you, please submit additional copies if you want more than one
approved set);
Two (2) revised site plans;
One (1) landscaping plan;
One (1) 11x17 grading and erosion control plan;
Please note that this application will expire in 90 days from the date of this memo, if the
applicant has not provided written response comments and revised documents to the
Administrator that seek to address the staff review comments contained herein. If there are
comments that you are not addressing with the revised site plan, please attach a letter
explaining the details. If you have any questions or need additional information, please contact
Teresa Rogers at 979.764.3570.
Attachments: Staff review comments
PC: B/CS Regional Association of Realtors, via email: executiveofficer(cDbcsreaIto r.com
Fred Paine, Kling Engineering & Surveying, via email: fred(ftlingeng.com
Case file no. 12-00500056 (SP)
STAFF REVIEW COMMENTS NO. 1
Project: B/CS Regional Association of Realtors (SP — 12-00500056)
PLANNING COMMENTS
1. According to the Crescent Pointe Protective Covenants the minimum requirements for
parking and paving setbacks have not been met. Please review these requirements and
revise as necessary.
2. The end parking space located closest to Lot 9R is approximately 15 feet in depth and
interferes with the drive aisle. Revise the parking space to meet the minimum size
requirements of 9 feet by 18 feet and additionally insure the drive aisle has a minimum 23
foot clearance. The end island dimensions must also continue to meet the 180 square feet
minimum size requirement.
3. Label parking setback distance from R.O.W. to curb of parking lot.
4. Label the striping across the driveway. It appears to be a painted handicapped accessible
route.
5. Provide temporary curbing, according to Site Design Standards, at the Phase Line
boundary.
6. Revise the bike rack detail on C4.1 and Site Notes # 81 to match.
7. Please clarify how sanitation will be served for Phase 1. Phasing must be completed so that
each individual phase meets all requirements. Currently, the dumpster is included in Phase
2 construction, but it may be necessary as part of Phase 1.
8. Verify the proposed hammerhead for dumpster access meets the Site Design Standards
required for a turnaround.
9. Site Specific Note #7 should be amended to include the proposed use and improvements.
10. Add a label on the Site Plan noting the gross square footage of the building.
11. Revise the general note on the site plan that all roof and ground -mounted mechanical
equipment shall be screened from view or isolated so as not to be visible from any public
right-of-way or residential district within 150' of the subject lot, measured from a point five
feet above grade. Such screening shall be coordinated with the building architecture and
scale to maintain a unified appearance.
12. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter. Any additional changes
on these plans that the City has not be made of aware of will constitute a completely new
review.
13. Item # 30 is missing from the Verizon & Suddenlink Cable Notes. Is this intended to be item
# 33?
Reviewed by: Teresa Rogers Date: March 28, 2012
LANDSCAPING/STREETSCAPING/BUFFER COMMENTS
1. Point totals provided for the shrubs, as part of the plant list, should be revised giving Maiden
Grass 270 points and Texas Sage 740 points, for a total of 1,010 points.
2. Revise General Notes to include the following: Irrigation system must be protected by either
a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -
Check Back Flow Device, and installed as per City Ordinance 2394.
3. Revise General Notes to include the following: All back flow devices will be installed and
tested upon installation as per City Ordinance 2394.
Reviewed by: Teresa Rogers
Date: March 28, 2012
Page 2 of 4
ENGINEERING COMMENTS
1. Please submit an NOI.
2. Please submit an Engineer's Cost Estimate.
3. Please submit a Letter of Acknowledgment.
4. C1.1 -What portion of the storm will be built with Phase I construction?
5. C1.1 - Label the water meter sizes.
6. C1.1 - Add a note indicating building size, construction material type, whether or not the
building will be sprinkled, and the required fire flow per the 2012 IFC.
7. C1.1 - Please label each fire hydrant with required fire flow to achieve the necessary total.
8. C1.1 - Add note specifying the material of the private water, sanitary sewer, and storm
sewer lines.
9. C1.1 - Label the volume and page number of the 10-ft Verizon Easement.
10. C2.1 - Add IPB to curb inlet just downstream of property.
11. C2.1 - Please remove "SWPY from the title block.
12. C2.1 - Add City Standard Details for Erosion Control.
13. C3.1 - Use City Standard Details for public curb ramps and storm sewer.
14. C3.1 - Please show the fire hydrant and water, phone, and sanitary sewer lines in profile
crossing the storm. It looks like there may be some conflicts.
15. C3.1 - Although the possibility of running a parallel HDPE storm sewer was previously
discussed, we feel that the other option you proposed of tying into the original storm sewer
and upsizing a portion of that pipe is actually preferable. At that time, we were unaware of
numerous utilities including storm, water, fire hydrant, sanitary sewer, gas, telephone, and
cable running in that portion of the right-of-way with little separation distance and potential
crossing conflicts. Please revise.
Reviewed by: Erika Bridges Date: March 30, 2012
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
2. CSU will provide drawings for electrical installation.
3. Developer will intercept existing conduit at designated transformers or other existing devices
and extend as required.
4. If conduit does not exist at designated transformer or other existing devices, developer will
furnish and install conduit as shown on CSU electrical layout.
5. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to:
sweido@csbc.gov.
6. Developer provides load data to CSU as soon as it is available to avoid construction delays.
Delivery time for transformers not in stock is approximately 24 weeks.
7. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as
designed by CSU.
8. To discuss any of the above electrical comments please contact Sam Weido at
979.764.6314.
Reviewed by: Sam Weido Date: March 21, 2012
TxDOT COMMENTS
1. No Comment (off state system, no anticipated impact)
Reviewed by: Chad Bohne Date: March 23, 2012
(*- /�
l � a G M P.Gl: STATION
April 30, 2012
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
TO: Jason Kinnard, Jim Singleton Architects; via email: Jason(cDisarchitects.com
FROM: Teresa Rogers, Staff Planner
Jason Schubert, AICP, Principal Planner
SUBJECT: B/CS Regional Association of Realtors (SP)
Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. The next submittal will be the third
and final review by staff for this round of reviews. If all items have not been addressed on the
next submittal, another $932 processing fee will need to be submitted for the subsequent set of
three (3) reviews. Please address the comments and submit the following information by any
Monday at 10:00 a.m. for further staff review:
City of College Station Transmittal Letter
Seven (7) complete sets of site civil construction documents for the proposed
development with the revised site and landscaping plans attached (one set will
be returned to you, please submit additional copies if you want more than one
approved set)
Four (4) revised site plans
One (1) landscaping plan
One (1) 11x17 grading and erosion control plan
Please note that this application will expire in 90 days from the date of this memo, if the
applicant has not provided written response comments and revised documents to the
Administrator that seek to address the staff review comments contained herein. If there are
comments that you are not addressing with the revised site plan, please attach a letter
explaining the details. If you have any questions or need additional information, please contact
Teresa Rogers at 979.764.3570.
Attachments: Staff review comments
cc: B/CS Regional Association of Realtors; via email: executiveofficer(cDbcsrealtor.com
Fred Paine, Kling Engineering & Surveying; via email: fred(cDklingeng.com
Case file no. 12-00500056
STAFF REVIEW COMMENTS NO. 2
Project: B/CS Regional Association of Realtors (SP)
PLANNING
1. The minimum parking setback distance from the R.O.W. to the curb of the parking lot is ten
feet. Revise the Site Plan to show this requirement has been met.
2. Please note that we are still waiting for a response to NRA comments pertaining to this
project.
3. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not been made aware of will
constitute a completely new review.
Reviewed by: Teresa Rogers
Date: April 25, 2012
ENGINEERING COMMENTS NO. 2
1. Since minimum cover is not being provided over storm sewer pipe, Class IV RCP will be
required. Please revise C3.1 and cost estimate to reflect this change.
Reviewed by: Erika Bridges Date: April 27, 2012
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
2. CSU will provide drawings for electrical installation.
3. Developer will intercept existing conduit at designated transformers or other existing devices
and extend as required.
4. If conduit does not exist at designated transformer or other existing devices, developer will
furnish and install conduit as shown on CSU electrical layout.
5. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to:
sweido@csbc.gov.
6. Developer provides load data to CSU as soon as it is available to avoid construction delays.
Delivery time for transformers not in stock is approximately 24 weeks.
7. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as
designed by CSU.
8. To discuss any of the above electrical comments please contact Sam Weido at
979.764.6314.
Reviewed by: Sam Weido Date: 3-21-12
ENGINEERING COMMENTS NO. 2
1. Since minimum cover is not being provided over storm sewer pipe, Class IV RCP will be
required. Please revise C3.1 and cost estimate to reflect this change.
Reviewed by: Erika Bridges Date: 4/27/12
TxDOT Comments
1. No Comment (off state system, no anticipated impact)
Reviewed by: Chad Bohne Date: March 23, 2012
1101 Texas Avenue, P.O. Box
9960
1/ College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
i 11 C, M P.Gl: STATION
MEMORANDUM
April 25, 2012
TO: Jason Kinnard, Jim Singleton Architects, via email: Jason@jsarchitects.com
FROM: Teresa Rogers, Staff Planner
Jason Schubert, AICP, Principal Planner
SUBJECT: B/CS Regional Association of Realtors (SP)
Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. The next submittal will be the third
and final review by staff for this round of reviews. If all items have not been addressed on the
next submittal, another $932 processing fee will need to be submitted for the subsequent set of
three (3) reviews. Please address the comments and submit the following information by any
Monday at 10:00 a.m. for further staff review:
City of College Station Transmittal Letter
Seven (7) complete sets of site civil construction documents for the proposed
development with the revised site and landscaping plans attached (one set will
be returned to you, please submit additional copies if you want more than one
approved set)
Four (4) revised site plans
One (1) landscaping plan
One (1) 11x17 grading and erosion control plan
Please note that this application will expire in 90 days from the date of this memo, if the
applicant has not provided written response comments and revised documents to the
Administrator that seek to address the staff review comments contained herein. If there are
comments that you are not addressing with the revised site plan, please attach a letter
explaining the details. If you have any questions or need additional information, please contact
Teresa Rogers at 979.764.3570.
Attachments: Staff review comments
cc: B/CS Regional Association of Realtors, via email: executiveofficer(cDbcsrealtor.com
Fred Paine, Kling Engineering & Surveying, via email: fred(cD_klingeng.com
Case file no. 12-00500056
STAFF REVIEW COMMENTS NO. 2
Project: B/CS Regional Association of Realtors (SP)
PLANNING
1. The minimum parking setback distance from the R.O.W. to the curb of the parking lot is
ten feet. Revise the Site Plan to show this requirement has been met.
2. Please note that any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and "bubbled" on
your plans. Any additional changes on these plans that the City has not been made
aware of will constitute a completely new review.
Reviewed by: Teresa Rogers Date:
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: May 15, 2012