Loading...
HomeMy WebLinkAboutStaff Comments(*�" CITY OF COLLEGE STATION H ofTamAWUW.iry• 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM February 20, 2012 TO: Equifrst Financial Services Corp. Manuel Gonzalez via email, mgonzalez@stedingautogroup.net FROM: Jason Schubert, AICP Principal Planner SUBJECT: CENTURY HILL L1 R 2R 3R 5R & 6R (FP-REPLAT) Thank you for the submittal of your FINAL PLAT - COMMERCIAL application. This project will be distributed to staff this week for their review. cc: Shultz Engineering via email, joeschultz84@verizon.net Case file no. 12-00500031 (*�" CITY OF COLLEGE STATION H ofTamAWUW.iry• 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM February 20, 2012 TO: FROM: Jason Schubert, AICP Principal Planner SUBJECT: CENTURY HILL L1 R 2R 3R 5R & 6R (FP-REPLAT) Thank you for the submittal of your FINAL PLAT - COMMERCIAL application. This project will be distributed to staff this week for their review. cc: Case file no. 12-00500031 (*W`Fq" CITY OF COLLEGE STATION Home of Tar A6M Univmity' 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM April 5, 2012 TO: Manuel Gonzalez, Goncloss Realty, LP — via email: mgonzalez(cDsterlingautogroup.net FROM: Jason Schubert, AICP, Principal Planner Teresa Rogers, Staff Planner SUBJECT: CENTURY HILL L1R 2R 3R 5R & 6R (FP-REPLAT) - Final Plat Staff reviewed the above -mentioned revised final plat as requested. The revisions that have been submitted suffice for meeting all minimum plat requirements except for public utility easement abandonment that will be considered at the April 12'h City Council meeting and the requested waiver to sidewalks along the frontage road that will be considered by the Planning & Zoning Commission. Staff has requested private cross access easements to be shown on the plat to the C.S.L. of Texas lot and Lot 9 to comply with site development requirements for cross access (LIDO Section 7.3.B.2). If you choose not to provide these easements on the plat, they will still be required by separate instrument with the site plan and we can discuss as needed. As requested, this item will be scheduled for consideration by the Planning and Zoning Commission at their Thursday, May 3, 2012, 7:00 PM meeting held in the City Hall Council Chambers, 1101 Texas Avenue. If you propose additional revisions, please provide the following revised documents by Monday, April 16, 2012, 10:00 a.m. for consideration with your project at the May 3'' Planning and Zoning Commission meeting: One (1) 24"x36" copy of the revised final plat; Thirteen (13) 11 "x17" copies of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to P&DS—Digital_Submiftal@cstx.gov. The agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting: http://www.csb(.gov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. cc: Joe Schultz, Schultz Engineering, LLC —via email: loeschultz84(cDverizon.net Chuck Ellison, The Ellison Firm —via email: chuck(cDellisonlaw.com Case file #12-00500031 Home of Texas A&M University ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. The following easements will be required: 20' PUE along South side of Pavilion Avenue from Highway 6 to Sebesta Rd. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 7. Developer installs pull boxes per CSU specs and design (pull boxes provided by CSU). 8. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to: sweido@csbc.gov. 9. Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. 10. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. 11. To discuss any of the above electrical comments please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: 2-22-12 TxDOT Comments Access to these lots should be from Pavilion Avenue internal to the development. Any access drive from the frontage road would be required to meet TxDOT's current "Regulations for Access Driveways to State Highways". Location must consider the posted speed, location of the existing on ramp and the distance between existing, proposed and adjacent access points. Site conditions may not accommodate an access drive. Appropriate data, including drainage, must be submitted and approved prior to any future work/permits in State ROW. Reviewed by: Chad Bohne Date: February 24, 2012 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: February 24, 2012 (*Or1 CITY OF, COLLAGE STATION Home afTexz A&M University" February 27, 2012 Planning & Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM TO: Equifirst Financial Services Corp. — Manuel Gonzalez via email: mgonzalez@sterlingautogroup.net FROM: Jason Schubert, AICP, Principal Planner Teresa Rogers, Staff Planner SUBJECT: CENTURY HILL L1R 2R 3R 5R & 6R (FP-REPLAT) Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, , 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, , 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Thirteen (13) 11 "x17" copies of the revised final plat; One (1) Mylar original of the revised final plat (required after P&Z approval); and One (1) copy of the digital file of the final plat on diskette or e-mail to: P&DS—Digital_Submiftal@cstx.gov. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.csb(.gov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments cc: Schultz Engineering, LLC — Joe Schultz via email: joeschultz84@verizon.net Case file #12-00500031 STAFF REVIEW COMMENTS NO. 1 Project: CENTURY HILL L1 R 2R 3R 5R & 6R (FP-REPLAT) - 12-00500031 PLANNING 1. Sidewalks are required along frontage roads of State Highway 6, which is classified as a Freeways/Expressway in the Thoroughfare Plan. According to the Unified Development Ordinance (UDO) Section 8.2.K.5.b, you may request to pay a fee in lieu of constructing sidewalks upon approval by the Planning and Zoning Commission. 2. Label the 20-foot drainage and public utility easement located along the south side of Pavilion Avenue. The easement should be labeled on the diagram of the Original Plat as well as the Replat. 3. The 10-foot utility easement on Lot 1, adjacent to Sebesta Road, is recorded in two sections on the original plat. Revise the Final Plat to include the original labels, marking sections 418/527 and 418/530. 4. Label each lot to include the individual lot acreage and revise the title block to reflect a change to the total acreage if necessary. 5. As found in LIDO Section 8.8, the wording for the Certificate of Ownership and Dedication should be updated from 'owner and developer of this plat' to 'owner and develop of the land shown on this plat'. Also add the last sentence stating, "All such dedication shall be in fee simple unless expressly provided otherwise." 6. Remove the words "Deed Records" and replace with "Official Records" on the Certificate of County Clerk. 7. Provide cross access easements between all lots and adjacent properties. 8. Please note that you will be required to submit paid tax certificates reflecting the new owners prior to the filing of your plat. 9. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter. 10. The construction documents and reports are still under review and may affect the plat. Reviewed by: Jason Schubert and Teresa Rogers Date: February 27, 2012 ENGINEERING COMMENTS NO. 1 (Final Plat, Construction Documents, Abandonment) 1. The proposed sanitary sewer re -alignment needs to take place before the abandonment can go forward to the City Council. 2. Please submit the Suddenlink signature for the abandonment application. 3. The proposed abandonment needs to be approved by the City Council before the re -plat can go forward to the Planning & Zoning Commission, as to reflect the previously discussed easement abandonments. 4. Once the easements are abandoned, the ordinance number and volume/page of the abandonment should be reflected on the plat. 5. Please dedicate a temporary blanket easement to cover the subject tract, which can be released once site construction is complete. The blanket easement will help expedite the easement abandonment process. 6. Please specify the various access and drainage easement to be "private". 7. Please place a note on the plat explaining the ownership and maintenance responsibilities of the various private access and drainage easements. 8. Please illustrate on the plat the "private" drainage easement that will cover the proposed storm re -alignment and serve Lot 3R. 9. As a portion of the proposed sanitary sewer re -alignment is deeper than 14 feet, a 30 foot PUE is required in this area. 10. (Sheet 2) Please specify Detail S1-02, as manholes deeper than 12 feet require a thicker base with additional steel reinforcement. 11. (Sheet 1 & 2) Please illustrate the service line connections for the future buildings. 12. (Sheet 1 & 2) Please clarify the proposed storm re -alignment is private and will be designed and constructed with the site plan. Also note the storm re -alignment will be in keeping with the original subdivisions drainage design. 13. Please submit letter of acknowledgement. Reviewed by: Josh Norton Date: February 29, 2012 (_ 4IW4� CITY OF COI7.F.GF. STATION Home ofTe A&M Unioeaity' 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM March 12, 2012 TO: Goncloss Realty, LP — Manuel Gonzalez via email: mgonzalez(cDsterlingautogroup.net FROM: Jason Schubert, AICP, Principal Planner Teresa Rogers, Staff Planner SUBJECT: CENTURY HILL L1R 2R 3R 5R & 6R (FP-REPLAT) Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by 10:00 a.m. on any Monday, your project will be placed on the next available Planning and Zoning Commission meeting: One (1) 24"x36" copy of the revised final plat; Thirteen (13) 11 "x17" copies of the revised final plat; One (1) copy of the digital file of the final plat on diskette or e-mail to P&DS—Digital_Submiftal@cstx.gov. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.csb(.gov/pz Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review comments cc: Schultz Engineering, LLC — Joe Schultz via email: joeschultz84@verizon.net Case file #12-00500031 Case file #12-00500029 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 2 Project: CENTURY HILL L1 R 2R 3R 5R & 6R (FP-REPLAT) - 12-00500031 PLANNING 1. Please note that staff will not support the sidewalk waiver request as there are existing sidewalks to connect to on Pavilion Avenue. All of the justifications provided in the revised application are not accurate. TxDOT does allow sidewalks in their right-of-way and with over 40 feet in width between the pavement edge and property line there should be sufficient area to locate the sidewalk away from the high speed travel lanes for safety purposes. The public sidewalk could also be located on the lots with a public access easement over it. Please feel free to contact me to discuss further if desired. 2. Please revise the Original Plat exhibit to reflect the bearings and dimensions in what was originally approved and filed in Volume 7623, Page 231. Though there was a note stating the surveyor requested the Original and Replat exhibits to match, the Original Plat exhibit is to show the recorded plat information. Revert the Original Plat exhibit back to the recorded plat. 3. As provided on the Original Plat, provide cross access easements to the C.S.L. of Texas Inc. Addition property to the south and provide cross access easement to Lot 7 from the proposed driveway along the frontage road. 4. Verify the acreage of Lot 3R, it is different in the Replat and in the Title Block. Reviewed by: Jason Schubert and Teresa Rogers Date: March 19, 2012 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2 (*01F` CITY OF COTIEGF. STATION Home ofTa&AdM Unio iV- 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM March 19, 2012 TO: Goncloss Realty, LP — Manuel Gonzalez via email: mgonzalez(cDsterlingautogroup. net FROM: Jason Schubert, AICP, Principal Planner Teresa Rogers, Staff Planner SUBJECT. CENTURY HILL L1R 2R 3R 5R & 6R (FP-REPLA7) Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by 10:00 a.m. on any Monday, your project will be placed on the next available Planning and Zoning Commission meeting: One (1) 24"x36" copy of the revised final plat Thirteen (13) 11 "xl7" copies of the revised final plat, One (1) copy of the digital file of the final plat on diskette or e-mail to P&DS-DigitaLSubmittal@cstx.gov. Submittal@cstx.gov. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.csb(.gov/pz Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review comments cc: Schultz Engineering, LLC — Joe Schultz via email.-joeschultz84@verizon.net Case file #12-00500031 NOTH.' Any changes made to theplanr, that have not been requested by the Czty of College Station, mustbe ezblatmd znyour neat transmittal letter and "bubbled" on your plans Arty addzuonal changes on these plans that have not been pointed out to the City, will constatme a completely nev reVme 7 of STAFF REVIEW COMMENTS NO. 2 Project: CENTURY HILL L1R 2R 3R 5R & 6R (FP-REPLAT) - 12-00500031 PLANNING 1. Please note that staff will not support the sidewalk waiver request as there are existing sidewalks to connect to on Pavilion Avenue. All of the justifications provided in the revised application are not accurate. TxDOT does allow sidewalks in their right-of-way and with over 40 feet in width between the pavement edge and property line there should be sufficient area to locate the sidewalk away from the high speed travel lanes for safety purposes. The public sidewalk could also be located on the lots with a public access easement over it. Please feel free to contact me to discuss further if desired. 2. Please revise the Original Plat exhibit to reflect the bearings and dimensions in what was originally approved and filed in Volume 7623, Page 231. Though there was a note stating the surveyor requested the Original and Replat exhibits to match, the Original Plat exhibit is to show the recorded plat information. Revert the Original Plat exhibit back to the recorded plat. 3. As provided on the Original Plat, provide cross access easements to the C.S.L. of Texas Inc. Addition property to the south and provide cross access easement to Lot 7 from the proposed driveway along the frontage road. 4. Verify the acreage of Lot 3R, it is different in the Replat and in the Title Block. Reviewed by.- Jason Schubert and Teresa Rogers Date: March 19, 2012 NOT&.' Any changes made to theplanr, that have not been requested by the Czty of College Station, mustbe ezblatmd znyour neat transmittal letter and "bubbled" on your plans Arty addzuonal changes on these plans that have not been pointed out to the City, will constatme a completely nev reVme 2 of2 CITY OF COLLEGE STATION H~ ofTe A&M Uxio ity' 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM April 5, 2012 TO: Manuel Gonzalez, Goncloss Realty, LP — via email: mgonzalez(cDsterlingautogroup.net FROM: Jason Schubert, AICP, Principal Planner Teresa Rogers, Staff Planner SUBJECT: CENTURY HILL L1R 2R 3R 5R & 6R (FP-REPLAT) - Final Plat Staff reviewed the above -mentioned revised final plat as requested. The revisions that have been submitted suffice for meeting all minimum plat requirements except for public utility easement abandonment that will be considered at the April 12'h City Council meeting and the requested waiver to sidewalks along the frontage road that will be considered by the Planning & Zoning Commission. Staff has requested private cross access easements to be shown on the plat to the C.S.L. of Texas lot and Lot 9 to comply with site development requirements for cross access (LIDO Section 7.3.B.2). If you choose not to provide these easements on the plat, they will still be required by separate instrument with the site plan and we can discuss as needed. As requested, this item will be scheduled for consideration by the Planning and Zoning Commission at their Thursday, May 3, 2012, 7:00 PM meeting held in the City Hall Council Chambers, 1101 Texas Avenue. If you propose additional revisions, please provide the following revised documents by Monday, April 16, 2012, 10:00 a.m. for consideration with your project at the May 3'' Planning and Zoning Commission meeting: One (1) 24"x36" copy of the revised final plat; Thirteen (13) 11'k17" copies of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to P&DS—Digital_Submiftal@cstx.gov. The agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting: http://www.csb(.gov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. cc: Joe Schultz, Schultz Engineering, LLC —via email: loeschultz84(cDverizon.net Chuck Ellison, The Ellison Firm —via email: chuck(cDellisonlaw.com Case file #12-00500031 CITY OF COLLEGE STATION H~ ofTe A&M Uxio ity' 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM April 5, 2012 TO: Manuel Gonzalez, Goncloss Realty, LP — via email: mgonzalez(cDsterlingautogroup.net FROM: Jason Schubert, AICP, Principal Planner Teresa Rogers, Staff Planner SUBJECT: CENTURY HILL L1R 2R 3R 5R & 6R (FP-REPLAT) - Final Plat Staff reviewed the above -mentioned revised final plat as requested. The revisions that have been submitted suffice for meeting all minimum plat requirements except for public utility easement abandonment that will be considered at the April 12'h City Council meeting and the requested waiver to sidewalks along the frontage road that will be considered by the Planning & Zoning Commission. Staff has requested private cross access easements to be shown on the plat to the C.S.L. of Texas lot and Lot 9 to comply with site development requirements for cross access (LIDO Section 7.3.B.2). If you choose not to provide these easements on the plat, they will still be required by separate instrument with the site plan and we can discuss as needed. As requested, this item will be scheduled for consideration by the Planning and Zoning Commission at their Thursday, May 3, 2012, 7:00 PM meeting held in the City Hall Council Chambers, 1101 Texas Avenue. If you propose additional revisions, please provide the following revised documents by Monday, April 16, 2012, 10:00 a.m. for consideration with your project at the May 3'' Planning and Zoning Commission meeting: One (1) 24"x36" copy of the revised final plat; Thirteen (13) 11'k17" copies of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to P&DS—Digital_Submiftal@cstx.gov. The agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting: http://www.csb(.gov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. cc: Joe Schultz, Schultz Engineering, LLC —via email: loeschultz84(cDverizon.net Chuck Ellison, The Ellison Firm —via email: chuck(cDellisonlaw.com Case file #12-00500031 �1 Planning &Development Services 1101 Texas Avenue, P.O. Box 9960 (* College Station, Texas 77842 CITY On COIIJIGE STATION Phone 979.764.3570 / Fax 979.764.3496 Home afTexz A&M University MEMORANDUM March 1, 2012 TO: Equifirst Financial Services Corp. — Manuel Gonzalez via email: mgonzalez@sterlingautogroup.net FROM: Jason Schubert, AICP, Principal Planner Teresa Rogers, Staff Planner SUBJECT: CENTURY HILL L1R 2R 3R 5R & 6R (FP-REPLAT) Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address all comments and submit the following information by any Monday by 10:00 a.m., for further staff review and to be scheduled for a future Planning and Zoning Commission (P&Z) meeting. One (1) 24"x36" copy of the revised final plat; Thirteen (13) 11 "x17" copies of the revised final plat; Abandonment related documents as described in the Engineering Comments; One (1) Mylar original of the revised final plat (required after P&Z approval); and One (1) copy of the digital file of the final plat on diskette or e-mail to: P&DS—Digital_Submiftal@cstx.gov. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on an agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.csb(.gov/pz Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments cc: Schultz Engineering, LLC — Joe Schultz via email: joeschultz84@verizon.net Case file #12-00500031 Case file #12-00500029 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter. 1 of 3 STAFF REVIEW COMMENTS NO. 1 Project: CENTURY HILL L1 R 2R 3R 5R & 6R (FP-REPLAT) - 12-00500031 PLANNING 1. Sidewalks are required along frontage roads of State Highway 6, which is classified as a Freeways/Expressway in the Thoroughfare Plan. According to the Unified Development Ordinance (UDO) Section 8.2.K.5.b, you may request to pay a fee in lieu of constructing sidewalks upon approval by the Planning and Zoning Commission. 2. Label the 20 foot drainage and public utility easement located along the south side of Pavilion Avenue. The easement should be labeled on the diagram of the Original Plat as well as the Replat. 3. The 10 foot utility easement on Lot 1, adjacent to Sebesta Road, is recorded in two sections. Revise the Final Plat to include the original labels, marking sections 418/527 and 418/530. 4. Label each lot to include the individual lot acreage and revise the title block, if necessary, to reflect a change to the total acreage. 5. Revise the Certificate of Ownership and Dedication to reflect the certificate as found in LIDO Section 8.8, including language regarding the owner and include the second sentence. 6. Replace "Deed Records" with "Official Records" on the Certificate of County Clerk. 7. Provide cross access easements between all lots and adjacent properties. 8. Please note that you will be required to submit paid tax certificates reflecting the new owners prior to the filing of your plat. Reviewed by: Jason Schubert and Teresa Rogers Date: February 27, 2012 TxDOT Comments Access to these lots should be from Pavilion Avenue internal to the development. Any access drive from the frontage road would be required to meet TxDOT's current "Regulations for Access Driveways to State Highways". Location must consider the posted speed, location of the existing on ramp and the distance between existing, proposed and adjacent access points. Site conditions may not accommodate an access drive. Appropriate data, including drainage, must be submitted and approved prior to any future work/permits in State ROW. Reviewed by: Chad Bohne Date: February 24, 2012 ENGINEERING COMMENTS NO. 1 (Final Plat, Construction Documents, Abandonment) 1. The proposed sanitary sewer re -alignment needs to take place before the abandonment can go forward to the City Council. 2. Please submit the Suddenlink signature for the abandonment application. 3. The proposed abandonment needs to be approved by the City Council before the re -plat can go forward to the Planning & Zoning Commission, as to reflect the previously discussed easement abandonments. 4. Once the easements are abandoned, the ordinance number and volume/page of the abandonment should be reflected on the plat. 5. Please dedicate a temporary blanket easement to cover the subject tract, which can be released once site construction is complete. The blanket easement will help expedite the easement abandonment process. Please specify the various access and drainage easement to be "private". NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter. 2 of 3 7. Please place a note on the plat explaining the ownership and maintenance responsibilities of the various private access and drainage easements. 8. Please illustrate on the plat the "private" drainage easement that will cover the proposed storm re -alignment and serve Lot 3R. 9. As a portion of the proposed sanitary sewer re -alignment is deeper than 14 feet, a 30 foot PUE is required in this area. 10. (Sheet 2) Please specify Detail S1-02, as manholes deeper than 12 feet require a thicker base with additional steel reinforcement. 11. (Sheet 1 & 2) Please illustrate the service line connections for the future buildings. 12. (Sheet 1 & 2) Please clarify the proposed storm re -alignment is private and will be designed and constructed with the site plan. Also note the storm re -alignment will be in keeping with the original subdivisions drainage design. 13. Please submit letter of acknowledgement. Reviewed by: Josh Norton Date: February 29, 2012 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. The following easements will be required: 20 foot PUE along South side of Pavilion Avenue from Highway 6 to Sebesta Rd. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30 feet of rigid or IMC conduit for riser poles. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 7. Developer installs pull boxes per CSU specs and design (pull boxes provided by CSU). 8. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to: sweido@cstx.gov. 9. Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. 10. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. 11. To discuss any of the above electrical comments please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: February 22, 2012 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: February 24, 2012 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter. 3 of 3