HomeMy WebLinkAboutCost EstimateSCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No. 12327
Wellborn Business Park
Engineer's Estimate of Waterline Construction
Item
Description
Unit
Estimated
Quantity
Unit Price
Total
Water System
I
I Mobilization and Staking
LS
1
2000.00
2,000
2
3
1 Erosion and Sediment Control
8" C909 Water Pipe, non-structural backfill
LS
LF
t
85
1500.00
30.00
1,500
2,546
4
6" C909 Water Pipe, structural backfill
LF
107
28.00
2,996
5
6" C909 Water Pipe, non-structural backfill
LF
185
24.00
4,440
6
Fire Hydrant Assembly (w/valve, vert. extension)
EA
1
3500.00
3,500
7
10" x 8" M.J. Tee
EA
1
800.00
800
8
8" x 6" M.J. Tee
EA
1
600.00
600
9
8" M.J. Gate Valve
EA
2
1,850.00
3,700
10
—
6" M.J. Gate Valve
EA
1
1000.00
1,000
11
8" 450 M.J. Bend
EA
2
600.00
15200
12
6" 45° M.J. Bend
EA
1
500.00
500
13
1 Water line Testing
LS
1
500.00
500
ESTIMATED WATERLINE CONSTRUCTION
I $25,282
F-12327
ENGINEERING, LLC.
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No. 12327
Wellborn Business Park
Engineer's Estimate of Waterline Construction
Item
Description
Unit
Estimated
Quantit
Unit Price
Total
Water System
I
_2
Mobilization and Staking
LS
I
2000.00
2,005
60—sion and Sediment Control
—
—st -I -b-a —till -fi
LS
1750.00
1,750
3
10" c 9 0 9 Water Pipe, n o i i - r net mr a back 1-1
LF
2._00
____j,_7j_6
4
8" C909 Water Pipe, non-structural backfill
LF
292._
24.00
7,006
5
Fire I Assembly (w/valve, vert. "tension)
EA
2
3500.00
7,000
6
10" x 10" M.J. Tee
EA
1
750.00
750
7 _
10" x 8" M.J. Tee
EA
1
650.00
650
8
f� M.J.Gate Valve
2
2
1,850.00
3,700
8 M.J. Gate Valve
A
1
1100.00
1,100
10
10" 450 M.J. Bend
_8_WCFK.J.
EA
2
11
Bend
EA
12
Water line Testm
LS
1
5607,00
5001
ESTIMATED WATERLINE CONSTRUCTION
$28,62111
—1 /
F— 12327
SCHULTZ ENGINEERING, LLC.