HomeMy WebLinkAboutLetter Acknowledging City StandardsSchultz Engineering, LLC
Office: 979.764.3900
Fax: 979.764.3910
March 12, 2012
Alan Gibbs, P.E.
City Engineer
Development Services
City of College Station
College Station, Texas
RE: Letter Acknowledging City Standards — Wellborn Business Park Phase 1 & 2
Dear Mr. Gibbs:
The purpose of this letter is to acknowledge that the construction plans for the sitework
and utility infrastructure for the above -referenced project, to the best of my knowledge,
do not deviate from the B/CS Design Guideline Manual.
I also acknowledge that, to the best of my knowledge, the details provided in the
construction plans are in accordance with the B/CS Standard Details.
Sincerely,
Jo ph P. Schultz, P.E.
Cl Engineer
z --/ 2
SCHULTZ ENGINEERING, LLC.
P.O. Box 11995 • College Station, Texas 77842
schultzengineeringllc.com
Schultz Engineering, LLC
Office: 979.764.3900
Fax: 979.764.3910
September 9, 2011
Alan Gibbs, P.E.
City Engineer
Development Services
City of College Station
College Station, Texas
RE: Letter Acknowledging City Standards — Wellborn Business Park
Dear Mr. Gibbs:
The purpose of this letter is to acknowledge that the construction plans for the waterline,
for the above -referenced project, to the best of my knowledge, does not deviate from the
B/CS Design Guideline Manual.
I also acknowledge that, to the best of my knowledge, the details provided in the
construction plans are in accordance with the B/CS Standard Details.
Sincerely,
U —
Jo ph . Schultz, P.E.
Civil Engineer
qq?--J I
�4 1z32.'7
P.O. Box 11996 • College Station, Texas 77842
schultzengi n eeri ng Ilc. com