Loading...
HomeMy WebLinkAboutWater System ReportWater System Report for Allen Professional Building College Station, Texas March, 2009 Prepared By: Civil Development, Ltd. 2033 Harvey Mitchell Parkway South College Station, Texas 77840 (979) 764-7743 0~·"30 t.f · llrCti I~: \0 ¥-CO General Information Location: Land Use: Design Criteria WATER SYSTEM REPORT Allen Professional Building College Station, Texas March 17, 2009 The Allen Office building is located at the comer of Poplar Street and Texas Avenue. Commercial Office Building WATER SYSTEM ANALYSIS Primary Water Supply: Existing 8" line along Poplar Street Required Demand: Building Type: Building Size: Suppression: Required Flow: Pipe: Roughness Cqejf: Hydraulic Software: Type SB 9,727 sf Sprinkler System 2,750 gpm PVC DR-14 C909 150 (Hazen Williams) Haestad Methods WaterCAD v.6.0 Existing System Pressure Tests Flow Hydrant: Hydrant C-001 on Poplar Street Flowrate: 1250 gpm Gauge Location: Hydrant C-002 (location not given on report) Static Pressure: 76 psi (176 ft water) Residual Pressure: 74 psi (171 ft water) Applicable Exhibits: Exhibit A-Flow Test Report Water System Analysis Summary Criteria Min. Pressure -fire (psi) Max. Velocity (fps) Required 20 12 Applicable Exhibits: Exhibit B -Water System Schematic As Designed Location 66.29 EXISTING FH 11.27 P4 Exhibit D -Summary of Results-Static Flow Exhibit C -Summary of Results -Fire Flow Conclusion The proposed 8" water . lines and fire hydrants for this project have sufficient capacity to meet the International Fire Code requirements for the proposed building and the design guidelines for the City of College Station. College Station Utilities Reliable~ Affordable, Community Owned Date Friday, February 13, 2009 Time 9:15 Test completed by BENNY RODRIGUEZ Witness AARON MATTHEWS Location 104 POPLAR Nozzle size 2.5 Flow hydrant C-001 Pitot reading 58 G.P.M. 1250 Static hydrant C-002 Static PSI 76 Residual PSI 74 Comments EXHIBIT B -WATER ANALYSIS ALLEN PROFESSIONAL BUILDING COLLEGE STATION, TEXAS *Cnr.~L..* --·~-2033Hlrvey.-C:tte1Part..y~ ~ Stlltlon. T-77l40 P'.O. llox 11929, Coliitll'9 S•llarl, Tsxaa nlM2 (171)7'M-n43 Fax:l9'7V}l'M-T791 Label P-1 P-4 Exhibit C Allen Professional Building Water System Analysis Pipe Summary -Static Flow Conditions Length Diameter Material Hazen-Discharge (ft) (in) Williams C (gpm) 451 8 PVC 150 0.00 204 8 PVC 150 16.00 Junction Summary -Static Flow Conditions Label Elevation Demand Hydraulic Pressure Grade (ft) (gpm) (ft) (psi) EXISTING FH 340 0.0 515.50 75.93 PROPOSED FH 340 16.0 515.50 75.93 TESTED FH 340 0.0 515.50 75.93 Lowest Pressure = 75;9f • Velocity (ft/s) 0.00 0.10 • Label P-1 P-4 Exhibit D Allen Professional Building Water System Analysis Pipe Summary -Fire Flow Conditions Length Diameter Material Hazen-Discharge (ft) (in) WllliamsC (gpm) 451 8 PVC 150 750.00 204 8 PVC 150 1,766.00 Junction Summary -Fire Flow Conditions Label Elevation Demand Hydraulic Pressure Grade (ft) (gpm) (ft) (psi) EXISTING FH 340 750.0 493.21 66.29 PROPOSED FH 340 1,016.0 496.92 67.89 TESTED FH 340 1,000.0 505.1 2 71.44 Lowest Pressure = ' '.66.29 · Velocity (ft/s) 4.79 11 .27