Loading...
HomeMy WebLinkAboutDetention Pond Exemption Certification*CIVIL DEVELOPMENT, Ltd.* CIVIL ENGINEERING & DESIGN-BUILD SERVICES P.O. Box 11929 · College Station, Texas 77842 · Phone: 979-764-7743 · Fax: 979-764-7759 May 20, 2009 City of College Station Development Services Attn: Alan Gibbs P.O. Box 985 Bryan, Texas77806 Re: Allen Professional Building Detention Pond Exemption Certification Dear Alan, I have conducted a topographic review and field investigation of the existing and proposed flow patterns for stormwater runoff from Allen Professional Building to the main stem of Wolf Pen Creek. At build-out conditions allowable by zoning, restrictive covenant, or plat note, the stormwater flows from the subject subdivision or site project will not cause any increase in flooding conditions to the interior of existing building structures, including basement areas, for storms of magnitude up through the 100-year event. Sincerely, KL~Lr- Project Manager