HomeMy WebLinkAboutSanitary Sewer Design ReportJanuary 15, 2009 Ms . Erika Bridges Engineering Department City of College Station 1101 Texas Avenue College Station, Texas 77842 Re: Sanitary Sewer Design Report Public Restrooms Northgate Area College Station, Texas Gessner Engineering Job No.: 08-0256 Dear Ms . Bridges: This letter shall serve to meet the requirements of a Sanitary Sewer Design Report, showing that the design of the proposed improvements meet the flow requirements of the BCS Unified Design Guidelines Manual. The proposed development consists of an approximately 560 square foot (sf) public restroom facility and dumpster relocation in the Northgate Area. There is an existing eight (8) inch PVC sanitary sewer main that runs in a south-westerly direction on a 0.4% slope and is situated in the Patricia Street right-of-way, just south of the proposed public restroom. This eight (8) inch main ties into a manhole and feeds an eight (8) inch main at Boyett Street. It is unknown what the existing eight (8) inch main at G Patricia services as this information is not available on the design plans by McClure Engineering dated April 11 , 1997. Additionally, an analysis of the existing system and the entire area it serves is not within the scope of this project. The capacity of the existing eight (8) inch sanitary sewer on 0.4% slope , using Manning's Equation, is 494,441 .6 gallons per day (gpd). This calculation has been attached as Appendix A. Using a peak factor of 4 and the fixture unit method, the maximum sanitary sewer loading for the proposed public restroom is 59,616 gpd , based on an 18 hour per day usage. The Sanitary Sewer loading calculations by fixture count method have been attached as Appendix B. This peak demand constitutes 12% of the capacity of the existing eight (8) inch main at Patricia. The proposed six (6) inch service line for the new public restroom is on a 2% grade and has a capacity, according to Manning's Equation, of 511,892 .5 gpd, only 11.6% of which will be utilized by the Proposed Northgate Restroom. This calculation has been attached for reference as Appendix A. Gessner Engineering 1712 Southwest Pkwy Suire I 05 College Sta tion, Texas 77840 P.O. Box 10763, 77842-0763 979.680.8840 FAX 979.680.8841 2204 S. Chappell Hill Sr. Brenham, Texas 77833 979.836.6855 FAX 979.836.6847 We trust that this report is responsive to the city of College Station requirements. Please contact us if you have any questions or if we can be of further assistance . Sincerely, GESSNER ENGINEERING __ ..... ,,,,,, ----~ 0 F r €'''' ; b5-• • • • • • • • :.+-..., '• , ~ r -• * •, -,_ a ~OJ.·· · .. d> ,, "*' ·*'~ ,, . . * " l *: • e • • • e •I e I I.·. I I~ ~ · ~iei..issA f; :1:~~¥f.~. ~ ,., . . . . . . . . . . . ~ ,_ • 98 • ii! ,, -0... 983 Q ... $~ 1•,~o ·~~CENS~·· ~~ '' ;.<'f"s • • • .. • • ...,<§,,: ''' S/ONAl 'i:.~--,,,,,,..,.,- Gessner Engineering Appendix A: Sanitary Sewer Line Capacity Calculations Gessner Engineering Sanitary Sewer Capacity Calculations Manning's Equation: Capacity of Existing 8 inch Sanitary Sewer line on 0.4% slope: n= 0.013 A= 0.349 sf R= AIP = 0.167 ft S= 0.004 Therefore, Q=O. 765 cfs = 494,441 .6 gpd (1 gpd= 1.5472x10"-6 cfs) Capacity of Proposed 6 inch Sanitary Sewer Service line on 2.0% slope: n= 0.013 A= 0.196 sf R= AIP = 0.125 ft S= 0.02 Therefore, Q=O. 792 cfs = 511 ,892.5 gpd (1 gpd= 1.5472x10"-6 cfs) Gessner Engineering Appendix B: Fixture Count Determination Gessner Engineering Fixture Unit Determination Fixture Type Fixture Unit #of Fixture GPM/GPF Total Value Load Fixtures in Units per GPM/GPF Factor Project Fixture Lavatory 2 2 4 2.2 8.8 Urinal 4 2 8 1 8 Water Closet 4 6 24 1.6 38.4 (Tank Operated) Total Fixture Units= 36 (4 + 8+ 24) Peak Wastewater Flow, GPM = 55.2 (8.8 + 8 + 38.4) Peak Wastewater Flow, GPO= 59 ,616 (based on a 18 hour/ day usage) Gessner Engineering