Loading...
HomeMy WebLinkAboutLetter Acknowledging City StandardsJanuary 5, 2008 Ms. Erika Bridges Engineering Department City of College Station 1101 Texas Avenue College Station , Texas 77842 Re : Letter Acknowledging City Standards Public Restroom Northgate Area College Station, Texas Gessner Engineering Job No.: 08-0256 Dear Ms. Bridges: The purpose of this letter is to acknowledge that the construction plans for the water, sanitary sewer, streets and drainage for the above-referenced project, to the best of my knowledge, do not deviate from the B/CS Design Guideline Manual. Any alternate design or construction methodology that was used is listed below: 1. 'Perimeter Guard' Sediment Control Fence was utilized in lieu of standard silt fence because it was needed over paved areas since this is an addition. This fencing allows cars to drive over it as needed , yet provides sediment control during construction. G 2. Polycast Trench Drain System and HOPE Pipe used in the Storm Sewer Design. This is discussed in depth in the Drainage Report. The HOPE pipe is located entirely on private property and is not under vehicular traffic loading. In addition, the size, minimum slope, and velocity of this proposed pipe does not meet city Public Design Standards. Since this is a private line, it does not need to meet these public design standards. In addition , due to the tie in elevation of the storm sewer, minimum slopes had to be utilized. There is not enough proposed flow entering this storm sewer line to achieve required velocities, unless it was to be a 4 inch line, which of course is not appropriate for maintenance. The slope and size of the pipe, as well as velocity of proposed flow shall be adequate to handle this development as it has been designed, even though it does not meet the public design standards. Gessner Engineering 1712 Southwest Pkwy Suite I 05 College Station, Texas 77840 P.O. Box I 0763, 77842-0763 979.680.8840 FAX 979.680.8841 2204 S. Chappell Hill St. Brenham, Texas 77833 979.836.6855 FAX 979.836.6847 I also acknowledge , to the best of my knowledge, that the details provided in the construction plans are in accordance with the Bryan/College Station Standard Details. Sincerely, GESSNER ENGINEERING Melissa P. Thomas, P.E. ___ ,,,,,,, ---€.OF "f ''' ~'f'-"(. ••••••••• ~..f: ,, .:'V:J ••• * ··:9Qltl ""*·· "·*'' '*: ··*I. ~ ...................... ~ ~ MELISSA P. THOMAS ~ ~ ...................... ~ ~ . . ~ ,, ;() ••• 98398 ... Q::1 11-1>0 ·~1CENS~<?.· ~~ ,,;.<'~s .. ········~~: \\\Sf ON AL~~----,,,,,,....,, ... - Gessner Engineering