Loading...
HomeMy WebLinkAboutDrainage Report LetterOctober 6, 2008 Mr. Alan Gibbs, PE Engineering Department City of College Station 1101 Texas Avenue College Station, Texas 77842 Re : Drainage Report Public Restrooms Northgate Area College Station, Texas Gessner Engineering Job No.: 08-0256 Dear Mr. Gibbs: o~-10~ 10/u/CZ q : J./5 o-:Sc Gessner Engineering has determined that the differences in the pre-developed and post-developed impervious areas are extremely minimal and will result in an increase in run-off of less than one (1) cubic feet per second (cfs). In addition , it is our understanding that detention is not required for sites less than one (1) acre in size. We appreciate the opportunity to work with you on this phase of the project. We trust that this report is responsive to the requirements. Please contact us if you have any questions or if we can be of further assistance. Sincerely, GESSNER ENGINEERING Melissa P. Thomas, P.E. G Gessner Engineering 1712 Southwest Pkwy Suite I 05 College Station, Texas 77840 P.O. Box I 0763, 77842-0763 979.680.8840 FAX 979.680.8841 2204 S. Chappell Hill St. Brenham, Texas 77833 979.836.6855 FAX 979.836.6847