HomeMy WebLinkAboutDrainage Report LetterOctober 6, 2008
Mr. Alan Gibbs, PE
Engineering Department
City of College Station
1101 Texas Avenue
College Station, Texas 77842
Re : Drainage Report
Public Restrooms
Northgate Area
College Station, Texas
Gessner Engineering Job No.: 08-0256
Dear Mr. Gibbs:
o~-10~
10/u/CZ
q : J./5 o-:Sc
Gessner Engineering has determined that the differences in the pre-developed
and post-developed impervious areas are extremely minimal and will result in an
increase in run-off of less than one (1) cubic feet per second (cfs). In addition , it
is our understanding that detention is not required for sites less than one (1) acre
in size.
We appreciate the opportunity to work with you on this phase of the project. We
trust that this report is responsive to the requirements. Please contact us if you
have any questions or if we can be of further assistance.
Sincerely,
GESSNER ENGINEERING
Melissa P. Thomas, P.E.
G
Gessner
Engineering
1712 Southwest Pkwy
Suite I 05
College Station, Texas 77840
P.O. Box I 0763, 77842-0763
979.680.8840
FAX 979.680.8841
2204 S. Chappell Hill St.
Brenham, Texas 77833
979.836.6855
FAX 979.836.6847