Loading...
HomeMy WebLinkAboutSewer System ReportSewer System Report for Castlerock Subdivision, Phases lA, lB, lC, 2A, 2B & 8 College Station, Texas September, 2006 R evised July 2007 Prepared For: DDH Investments 4490 Castlegate Drive Coll ege Station, Texas 77845 (979) 690-7250 Prepared By: Civil Development, Ltd. 2033 Harvey Mitchell Parkway South College Station, Texas 77840 (979) 764-7743 Loco lion: General land Use: Area: Design Criteria: GENERAL INFORMATION The Castlerock Subdivision, Phases I A, J B, JC, 2A, 2B and 8 are located on the south side of SH 40 in southern College Station near Castl erock Parkway. The area encompassed by Phase 1 B will be served by an existing 18" line that roughly parallels Spring Creek. Thi s line was installed by the City of College Station several years ago and was intended to serve the entire area. All 7 lots that comprise this phase have direct access to this line. No additional sewer lines or manholes will be installed on that system with this project. Phase lC will involve the extension of 8" and 6" lines from the system that was built with Phase 1 A. It will be part of a larger system that will eventually include Phases 2A, 2B and 8 of the Castlerock Subdivision. This larger system was analyzed with the development of Phase IA. Since that time, the system has changed slightly to divide the original Phase 1 B into Phase 1 B & 1 C. This analysis incorporates the changes since the original analysis was prepared. Phase 18 Conm1ercial A-P Phase 1 C (and all others) Single Family Residential Phase I A (existing) = 13.4 ac. 30 lots Phase 1 B 3.6 ac. 7 Jots Phase IC 2.7 ac. 10 lots Phase 2A (future) 5.9 ac . 33 lots Phase 2B (future) 8.6 ac. 27 lots Phase 8 (future) 6.7 ac. 36 lots Primary Sewer Outfall: 18" sewer line along Spring Creek (Phase 1 B) 2 1" sewer line along Spring Creek (Phases 1 A, 1 C, 2A, 28 & 8) Commercial Demand (Phase J B): Avg. Pop Density: 30 people per acre Average Flow: 50 gpd/cap Peaking Factor: 4 Residential Demand (Phase 1 C): Avg. Pop Density: 2.67 people per lot Average Flow: 100 gpd/cap or 267 gpd per lot Peaking Factor: 4 Pipe. PVC D3034 SDR 26 Applicable Exhibits: Conclusion: Exhibit A -Sanit ary Sewer System Schemati c Exhibit 8 -Sanitary Sewer Analysis Spreadsheet The existing 18" line that will serve Phase I 8 was designed to include the flow fr om the area. This large line will easil y handle the small flowrate from this development. The sewer system for Phases 1 A, 1 C, 2A, 28 and 8 of the Castlegate Subdivision, consists of a series of 6" and 8" lines that tie to the city's 21" trunk lin e along Spring Creek. The analysis in Exhibit 8 checks the calculated slope required to pass the estimated fl ow against the minimum slope required by TCEQ. The spreadsheet indicates the minimum required slope is much greater than the computed slope, so we conclude that the system is more than capable of carrying the anticipated flows from the development. , I I; I g I! ! g 11 I, I I ! ~ I I i 'I !. ! I !1 I II l!: g . I ; I ~ f I I I,-II I I r--n I Ir-11 I Ir-11 I Ir 11 I I I I I 1r--l'I I 1r--II I 1,-I ' I I'-u-rr I I \J _ _;·-·-· SEWER SCH EMATIC EX HIBIT 1· '. ' .. Line C/l <!) 0 "O 0 ....:i z <!) (rj <!) E -o u From To c !..:: 0 0 ....... .... z <!) 0 u... "O E ~ C/l ' <!) 0 ~ I u... ' 267 GPO per ! MH# MH # GPO/lot Person I GPO Outfall #I -~erves Phase 1~, tC,_b}A and 8 SI IC! 36 0 ' 9,6 12 I -----------IC2 !Cl 5 0 1,335 I -----·--IC! IA2 3 0 80 1 Exhibit B Castlerock Subdivision -Phases lA, lB, lC, 2, 2A and 8 Sanitary Sewer Analysis Flow Calculations C/l I <!) bl) "O I c F= 0 I ·..= 0 z I Average Daily Infiltration Peaking .E <.I: I Peak E Size ·;:::: ~ "' Flows (ADF) i (10% ADF) Factoc 1 Flows c 0 <!) o -1:::: I u u... C/l 0. :J I I I I I I I I I I GPO I CFS CFS I CFS (in.) I I I -I 9,612 0.0 149 0.00 15 4.00 I 0.06 8 ---· -1,335 0.0021 l_ 0.0002 4.00 I 0.01 6 10,947 I 11,748 0.0 182 T 0.0018 4.00 l 0.07 8 I ' ----·--- -I IA! IA2 28 0 7,476 . IA2 IA3 3 0 80 1 ---2AI 21 33 0 8,~l_!__l.. ------21 IA 3 19 0 5,073 ' ----------·- IA3 JA4 3 0 801 -----22 IA4 3 0 801 I ----------· IA4 !AS 0 0 ---------Outfall #2 -Serves Phase 1 B 182]_0 _ -. ------181 I !Bl 3.61 ---- -7,476 i --19,224 20,025 r--I 8,8 I I - 8,811 I 13,884 33,909 I 34,710 I -801 3s,s 11 I 35,511 I I 33,909 I 34,090 0.0116 I 0.00 12 j 0.0310 0.0031 0.0136 0.0014 0.0215 0.0021 0.0537 0.0054 0.0012 0.000 1 0.0549 0.0055 0.0527 0.0053 Exhibit B Page I of I I_ 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 0.05 8 I 0.13 8 I I 0.06 8 I 0.09 8 ! 0.22 8 i 0.01 8 I 0.23 8 I l 0.22 18 , .. -· Pipe Calculations I ·Manning Min. Friction Design Pipe Inside Material Slope Slope Slope Diameter Peak Peak Check I Flows I Flows I I I ' In ches % % I ! ---0 3034 7.754 ' 0.0030 0.40 OK I -- 03034 5.793 I 0.0003 0.80 OK -- 0 3034 7.754 I 0.0045 0.40 OK ---- 0 3034 7.754 I 0.0018 0.40 OK ---- 03034 7.754 0.0130 0.40 OK - ----- 03034 7.754 I 0.0025 0.40 OK -·-- 03034 7.754 I 0.0062 0.40 OK --- 0 3034 7.754 I 0.0390 0.40 OK -03034 7.754 0.0000 0.40 OK - 03034 7.754 0.0408 0.40 OK -- ---- 02241 17.263 0.0005 : 0.20 OK ---