Loading...
HomeMy WebLinkAboutWater StudyOctober 20, 2008 David Loflin Texas Commission of Environmental Quality Water Supply Division MC 153 P.O. Box 13087 Austin, TX 78711 P.O. Box 9253, College Station, TX 77842 Off/Fax: (979) 690-0329 email: civil@rmengineer.com RE: Creek Meadows: Section 1 C, Phase One -College Station, TX TCEQ Exception Letter for· Water Improvements RME No. 202-0363 Mr. David Loflin: The above referenced project will install the following improvements within the distribution system of the Wellborn S.U.D.: •!• Approximately 230 linear fet::t of 16" PVC (C-905, Class 235) water line; •!• Applicable valves & fittings. Design and construction of these improvements will be in accordance with the latest Bryan/College Station Unified Water & Sewer Design Guideline Manual, Standard Details, and Specifications and Chapter 290 of the TCEQ Rules & Regulations. This quantity of water line is less than 10% of the total length Clf water line within the City's current distribution system. Therefore, an exception for plan review is being requested for this project and its water system improvements. Please call should you have any que~:tions or require assistance. CDl-202-0363-Ll I PUBLIC WATERS rSTEM PLAN REVIEW SUBMITTAL FORM (Complete and Attach to Submittal Package) Date: October 20, 2008 ___ CCN No. or Application No. -:"'""1-'-13-....4..-0.__ _____ _ TCEQ PWS Identification No.*: 0210016 Water System Name: Wellborn S.U.D. Water System Owner: Wellborn S.U.D. Address: P.O. Box 250, Wellborn, TX 77881 Responsible Official: Steven Cast _____ Type of Entity.:....: -=s;..:.;.u=·=o;.:.,. --------- _____ Phone: (979) 690-9799 ______ Title: Manager County (system location) : Brazos County Subdivision Sec., Phase, Unit, etc. Creek Meadows-Section 1C, Ph 1 _________________ Mechanism & Source of Financing:-'-P"""ri..;;..v=at=e"------------ Engineer: Rabon A. Metcalf, P.E. Reg istration Number:_8=8=5""'8;;..;;3'----------------- Firm Name: RME Consulting Engineers Phone: (979) 690-0329 Firm Address: P.O. Box 9253, College Station, TX 77842 Fax: (979) 690-0329 • If no PWS Number exists, the owner must submit a busin1~ss plan, if required, in accordance with §290.39(f) and (g). -If a required CCN number does not exist, an acceptable < pplication to obtain a CCN number must be made before a project submittal can be technically reviewed. In addition, if a submittal is for a proje:t located outside the CCN area, a CCN amendment application must be submitted before a project may be reviewed for construction approval. Please refer to 30 TAC Chapter 291 for additional information regarding CCNs. If this is a new (proposed) system, you must attach the following with this submittal: NOT APPLICABLE 0 Attach a list of all water utilities within Y:z mile of the proposed service area boundaries 0 Copies of formal applications for service! from each of the following 0 any municipality if the system is within its ET J; 0 any district or other political subdivision whose corporate boundaries are within Y:z mile of the proposed service area boundaries 0 any other water service provider whose certificated service area boundary is within Y:z mile of the proposed service area boundaries 0 Documentation that all application requi ements including payment of fees were complied with. 0 Copies of written responses from each of the entities listed above. 0 Business plan, if required by 30 TAC W0.39(f) & (g). The business plan financial requirements for non-community water systems must confirm capital availability to construct the system according to TCEQ requirements. This would consist of a balance sheet that shows liabilities as well as assets, not just a bank confirmation of a deposit account. Alternatively, if the project is being constructed with loan funds, then a loan commitment letter from the lender specific to that project will suffice. 0 Justification for constructing a separate system (unless none of the entities listed above exist) 0 Plans and specifications with an engine1~ring report all sealed by design engineer. Type of Project (please check the appropriate boxes): ./ Distribution System Modifications D Well completion data on previously approved well 0 Pressure Maintenance Facilities Modifications 0 Disinfection Facilities or Other Modifications 0 Preliminary Engineering Report w/o plans 0 Modification of Surface Water Treatment Plant 0 0 0 0 0 0 0 Storage Capacity Modifications Water Well Construction, Proposed Proposed Innovative Process Study Ground Water Treatment Plant, New Surface Water Treatment Plant, New Tex. Water Dev. Board Proj. No .. _____ _ Other(PleaseExplain) ________________________________ _ IF THIS SUBMITTAL IS A REVISION OF PREVIOUSLY SUBMITTED PLANS, PLEASE ENTER THE ASSIGNED TCEQ LOG NUMBER: . Please call (512) 239-6960 if you have questions regarding this form. Your cooperation will help us provide better service. Additional helpful information and rules are available at our website: Rabon A. Metcalf, P .E. Printed Engineer's Name Revised 9/12/02 October 20, 2008 Date