Loading...
HomeMy WebLinkAboutUtility AnalysisSeptember 29, 2008 Carol Cotter, P.E. Assistant City Engineer City of College Station 1101 Texas Avenue South College Station, TX 77842 P.O. Box 9253, College Station, TX 77842 Off/Fax: (979) 690-0329 email: civil@rmengineer.com RE: Utility Availability Analys~ for Creek Meadows Commercial Office Lot 1-2, Block One-Creek Meadows, Section lC, Phase One-College Station, TX RME No. 202-0363 Carol Cotter: There is sufficient capacity in the existing water distribution system and proposed sanitary sewer collection system to support the above referenced development and the associated proposed improvements. The existing and proposed improvements and projected demands, for both water and sanitary sewer, are summarized below: •:• The subject property has ace ~ssibility to existing public water for both domestic and fire use at the following locations: o Existing 16" PVC public water line located in an existing 16' PUE, along the right-of-way line of Greens Prairie Road West will be relocated (approximately 200 linear feet) into :t new 20' PUE required for the dedication of ROW along Greens Prairie Road w· est; o The proposed/relocated 16" PVC public water line will accommodate fire flows from a proposed fire hydrant which will be located in the front center of the development; o Flow tests were obtained from the Wellborn S.UD. from two existing fire hydrants installed al1)ng the 16" PVC water line located at the A&M Super Storage at Wellborn Gommercial development. This flow test was conducted on February 15, 2008, b~r Wellborn S.U.D. by Mr. Steven Cast and witnessed by this office. Since this time no changes to the distribution system, in the immediate influential area, have been made. The flow data is summarized below in Table #1 -Flow Test Data. A co y of this flow test re ort is attached to this letter. FLOW TEST DATA I Flow Pilot Static Residual Hydrant Reading Flow Pressure Pressure No. LocHtion si FH l SE Cor of A&M Super 55 FH2 SW Cor of A&M Super -53 1250 Static FH Southmost FH on SS Ct. 66 65 Note: The reported flow is from the 2.5" nozzle of the identified flow hydrant; •:• Fire Flow requirements and results: Creek Meadows -Section lC, Phase One Utility Availability Analysis September 29, 2008 o Commercial fire hydrants will be analyzed to provide a frre flow of 2,500 gpm. This flow may be spli t between two hydrant so long as they are within 600' of one another; o During fire flow conci.itions, the proposed system and adjacent infrastructure must provide the required fire flow with a minimum residual pressure of20 psi; o At all analyzed conditions, no water line shall have a velocity greater than 12 fps in both existing and proposed mains; o Utilizing the KYPIPE model, mentioned above, fire flow requirements for the proposed water system improvements were determined to adequately meet or positively exceed the minimum design standards. Resulting summary information for the fire flow sc·enario is illustrated below in Table #2 -Water System Summary and identifies the "worse-case" location in the water distribution system (lowest pressure node or highest velocity in pipe). The entire water system model is fully contained with the KYPIPE Hydraulic Analysis Data. o The required 2,500 gpm fire flow will be split between the new proposed fire hydrant located at t 1e front/center of this development and the existing frre hydrant located at the SE property comer of A&M Super Storage at Wellborn (common property comer with this development); •:• The subject property has accessibility to public sanitary sewer at the following location: o An existing 8" PVC public sanitary sewer line terminates on the northwest side of Greens Prairie Road West and flows in a southeasterly direction through the existing Creek Meadows development and eventually to the existing regional lift station; o A proposed 6" PVC Sanitary Sewer service line, laid at 0.80% grade, will be installed to the exi~:ting 8" PVC public sanitary sewer from this proposed development; •:• Projected daily sanitary sewer demands, for this development and future development contributing to the proposed 6" sanitary sewer line, are as follows (peaking factor of 4.0): o The commercial office development will have an average daily wastewater flow of 8,160 GPD and ;1 2-hour peak flow of 0.08 cfs (as determined using the calculated water dem.md); o The future residential development will contribute 100 gpd/capita and 2.67 capita per dwelling unit. Tims the ADF will be 267 gpd and 0.0017 cfs PF per dwelling unit. With 36 fourplex units proposed in the future the contributing residential Peak Flow is estimated at 0.24 cfs; o The wastewater flow from this development, and all other future developments discharging to the ex:.sting 8" sanitary sewer, will total 0.32 cfs at the 2-hour peak flow. The proposed 6" sanitary sewer line has an approximate capacity of 0.51 cfs at the proposed sl•)pe of 0.80% slope; Creek Meadows -Section 1C, Phase One Utility Availability Analysis September 29, 2008 Please call should you have any que~tions or require assistance. Sincerely,