HomeMy WebLinkAboutTCEQOctober 20, 2008
Louis Heron III, P .E.
Texas Commission of Environmental Quality
Plans & Specification Review
MC 148
P.O. Box 13087
Austin, TX 78711-3087
RE: Chapter 317 Summary Tra:11smittal Letter
Permittee: City of College Station
P.O. Box 9253, College Station, TX 77842
Off/Fax: (979) 690-0329
email: civil@rmengineer.com
Permit Number: Lick Creek WWTP: WQ0010024-006
Project Name: Creek :\.1eadows (Section lC, Phase One)-College Station, TX
County: Brazos County
Grant No.: NI A
Mr. Louis Heron:
The purpose of this letter is to provide the TCEQ with the information necessary to comply with
the requirements of Chapter 217.8(c) of the TCEQ's rules entitled, Design Criteria for Sewerage
Systems. The necessary information includes:
1. Engineering Firm:
RME Consulting Engineers
1391 Seamist Lane <77845>
P.O. Box 9253
College Station, TX 77842
2. Design Engineer:
Rabon A. Metcalf, P .E.
Off/Fax: (979) 690-0329
3. Location:
Brazos County, TX
4. Project Identifier:
Creek Meadows: Section 1 C, Phase One -Utility Improvements
5. Operator:
City of College Station
6. Collection System:
City of College Station -Public Utilities Department
CD 1-202-0363-L 12 Page 1 of2
06 ·'143 \0·1.D·O~
Cl: 80
CL
Creek Meadows (Section lC, Phase One)
TCEQ Chap 217 Summary Transmittal Letter
October 20, 2008
7. Plan & Specification Compliance:
Design and construction of these improvements are in accordance with the Bryan/College
Station Unified Water & Sewer Specifications, Design Guidelines Manual, and Chapter
217 of the TCEQ Rules & Regulations. This sanitary sewer improvement project will be
constructed with the City of College Station performing a technical review as specified in
Chapter 217. Therefore, an 1::xception for plan review is being requested for this project
and its sanitary sewer improvements.
The plans and specificatiorn: which describe the project identified in this letter are in
substantial compliance with all the requirements of Chapter 217.
8. Variances:
No variances are being sough for these proposed sanitary sewer improvements.
9. Project Scope:
The above referenced proje<.~t will install the following sanitary sewer improvements
within the CCN of the City of College Station (CoCS):
•!• Approximately 885 liaear feet of gravity sewer:
o 6" PVC (SDR 26, D3034) & (SDR 26 Class 160);
•!• Applicable manholes, cleanouts, and service leads;
Sincerely,
CD 1-202-0363-Ll2 Page 2 of2