Loading...
HomeMy WebLinkAboutCost EstimateNO. 1 2 3 4 4 5 6 Engineer's Cost Estimate CREEK MEADC>WS -SECTION lC, PHASE ONE SANITARY SEWER IMPROVEMENTS COLLEGE STATION, BRAZOS COUNTY, TEXAS UNIT DESCRIPTION QUANTITY UNIT COST SANITARY SEWER IMPROVEMENTS Mobilization, Staking, Trench Safety & TV Inspection 1 LS $4,500.00 (Sewer Line) 6" PVC Sanitary Sewer (SDR-26, 030:34) -Non 775 LF $20.00 Structural Backfill 6" PVC Sanitary Sewer (SDR-26, 030:34) -80 LF $40.00 Structural Backfill 6" PVC Sanitary Sewer (SDR-26, CL 160) -Non-18 LF $26.00 Structural Backfill 4' Diameter Standard Manhole w/32" Opening (Ring 6 EA $2,500.00 & Cover) Structural Bedding (Cement Stabilized Sand) 20 LF $25.00 Single Sanitary Sewer Service (Short Side) 1 EA $1 ,500.00 TOTAL COST $4,500.00 $1 5,500.00 $3,200.00 $468.00 $15,000.00 $500.00 $1,500.00 SUB-TOTAL= $40,668.00 ESTIMATED CONSTRUCTION COST= $40,668.00 10% CONTINGENCY = $4,066.80 GRAND TOTAL = $44,734.80 This Engineer's Cost Estimate was prepared in our office, at the date shown, and is released for the purpose of public infrastructure cost projections. CD1-202-0363-E01 RME CONSULTING ENGINEERS POST OFFICE BOX 9253 COLLEGE STATION. TEXAS 77842 OFF/FAX: (979) 690-0329 E-MAIL: CIVIL@RMENGINEER.COM 1 of 1