Loading...
HomeMy WebLinkAboutSewer ReportI I *CIVIL DEVELOPMENT, Ltd.* CIVIL ENGINEERING & DESIGN-BUILD SERVICES P.O. Box 11929 · College Station, Texas 77842 · Phone: 979-764-7743 · Fax: 979-764-7759 October 30, 2008 Alan Gibbs, P .E. City of College Station P.O. Box 9960 College Station, TX 77842 RE: Sewer Analysis and Report Oxford Court Office Building Lot 4 Block 11 , Castlerock Subdivision, Ph 1 B College Station, Texas Dear Alan: The Oxford Court Office Building is planned for Lot 4, Block 11 of the Castlerock Subdivision, Ph 1 B. When that subdivision was developed, the existing and proposed sewer systems were analyzed to determine if they had sufficient capacity to carry peak flows from the land uses that were anticipated. The office building planned for this lot is in keeping with the anticipated land use when the initial report was prepared. This lot encompasses an area of about 0.54 acres. Based on the BCS Design Guidelines, an office building on this size lot will produce a peak flowrate of 2.25 gpm (0.0375 cfs). The fixture count used to estimate water usage by the Plumbing Code indicates that a peak flow of 16 gpm (0.267 cfs) can be anticipated. In either case, the 18" sewer line at the rear of the lot that services this building can easily carry either of these flowrates . Sin{Z;.ur~, jL=,P~ Division Manager