Loading...
HomeMy WebLinkAboutCost EstimatePublic Infrastructure Required for Total Lot 4R -University Park Preliminary Engineering Estimate of Costs at 100% Design -"':> MD 6 P d W t Ufrt S repose a er I ICY erv1ce Item No. Item Quanitv 1 6" PVC Water Line (DR14 Class 200, AWWA C909) 1480 2 6" MJ TEE 6 3 6" 45° MJ Bend 18 4 6" 90° MJ Bend 1 5 6" Gate valve w/ Box 7 7 Fire Hydrant Assemblies 4 8 Trench Safety 1424 9 3" PVC Water Line (SDR21 ASTM 2241) 255 10 Fire Hydrant removal and discard 2 11 Structural backfill Under Pavement 855 12 Domestic Water Meter 73 13 lrriqation Water Meter w/ backflow preventers 4 14 AC Waterline: removal and grout fill 300 15 Remove existinq AC waterline and replace with 6" PVC 120 16 Cap existinq AC waterline (6") 1 Total Cost Estimate: Unit Unit Price Total LF $21 .00 $31,080.00 EA $259.00 $1 ,554.00 EA $203.00 $3,654.00 EA $285.00 $285.00 EA $600.00 $4,200.00 EA $2,500.00 $10,000.00 LF $1 .00 $1,424.00 LF $15.00 $3,825.00 EA $1 ,200.00 $2,400.00 LF $2.50 $2,137.50 EA $800.00 $58,400.00 EA $1,000.00 $4,000.00 LF $6.00 $1 ,800.00 LF $27.00 $3,240.00 EA $200.00 $200.00 $128,199.50