Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Cost Estimate
SPRING CREEK TOWNHOMES, PHASE 4 ENGINEER'S ESTIMATE May 11, 2006 Item Description Estimated nit Unit Price Estimated Cost No. Quantity Streets 1 jMobilization/Construction Staking 1 LS 4,000.00 4,000 2 Excavation/Grading 593 CY 6.501 3,855 3 6" Lime Stabilized Subgrade 1,712 SY l-4.00 6,848 4 Base Material -6" depth 1,519 SY 8.50 12,912 5 Asphalt Paving -2" depth -+ 1,519 SY 9.~~ 13 ,671 6 I Concrete Curb and Gutter (all types) 533 LF 9.00 4,797 Subtotal -Streets $46,082 Storm Drainage 7 24" HDPE, non-structural 43 LF 34.00 1,462 8 10' Inlet 1 EA 3,200.00 3,200 9 Safety End Treatment -24" Pipe 1 EA 1,000.00 1,000 10 Rock Riprap 300 SY 60.00 18,000 11 f Inlet Protection -I 6~5 -t EA 150 o~I 150 12 Hydromulch/Hydroseeding SY 0.60 405 13 Construction Exit 1 EA 1,500.00 1,500 14 I Silt Fence 150 LF 2.501 375 15 TV Inspection 43 I LF 10.00 430 Subtotal -Stonn Drainage! $26,522 Water 16 3" Water PVC Sch 40 -structural 75 LF 16.00 1,200 17 3" Water PVC Sch 40 -non-structural 129 LF 11.001 1,419 18 8"x 3" M.J. Reducer 1 EA 275.00 275 19 3"x 45° M.J. Bend 2 EA 125.00 250 20 2" Blow Off Assembly 1 EA 750.00 750 21 Connect to existing water line 1 EA 500.00t 500 22 l" Water Service,~ 15 ft (avg length = 3 ft) 3 EA 450.00 1,350 23 l" Water Service,> 15 ft (avg length = 90 ft) 1 EA 800.00 800 24 1.5'' Water Service,~ 15 ft (avg length = 2 ft) 2 EA 500.00 1,000 25 1.5" Water Service,> 15 ft (avg length = 49 ft 3 EA 900.00 2,700 Subtotal -Water $10,244 TOT AL CONSTRUCTION $82,848