Loading...
HomeMy WebLinkAboutResponse to CommentsDate: To: From: Subject: Remarks: TEX CON TRANSMITTAL November 15, 2005 Bridgette George Development Services City of College Station Joe Schultz, P.E. Texcon General Contractors 1707 Graham Road College Station, Texas 77845 Phone: (979) 764-7743 Revised Construction Plans Williams Creek Subdivision -Phase 3 College Station, Texas oc.J-/13! \t[n\o5 \o·.u.o v Attached are 4 sets of the revised construction plans for the above-mentioned project. Please return extra sets to our office. Also attached are 2 copies of the Water Design Report, 2 copies of the Engineer's Cost Estimate, and our Response to Staff Review Comments No . 1 (dated 11/4/05). Give me a call if you have any questions or need anything else. Response to Staff Review Comments No. 1 (dated 11/4/05) Williams Creek Subdivision, Phase 3 1. The TxDOT Roadway Design Manual, Appendix A -Metal Beam Guardrails, was used as a reference to determine if guardrails are necessary. Attached is Figure A from this manual which shows that for a 1 V:4H embankment slope, a guardrail is not necessary. Also, the culverts have sloped end treatments at the end, so there is no obstruction at the bottom of the slope. 2. The steel reinforcement has been added to the plans. 3. 2 copies of the Water Design Report are included with this submission.