TEX CON
TRANSMITTAL
November 15, 2005
Bridgette George
Development Services
City of College Station
Joe Schultz, P.E.
Texcon General Contractors
1707 Graham Road
College Station, Texas 77845
Phone: (979) 764-7743
Revised Construction Plans
Williams Creek Subdivision -Phase 3
College Station, Texas
oc.J-/13!
\t[n\o5
\o·.u.o v
Attached are 4 sets of the revised construction plans for the above-mentioned
project. Please return extra sets to our office. Also attached are 2 copies of
the Water Design Report, 2 copies of the Engineer's Cost Estimate, and our
Response to Staff Review Comments No . 1 (dated 11/4/05).
Give me a call if you have any questions or need anything else.
Response to Staff Review Comments No. 1
(dated 11/4/05)
Williams Creek Subdivision, Phase 3
1. The TxDOT Roadway Design Manual, Appendix A -Metal Beam Guardrails, was
used as a reference to determine if guardrails are necessary. Attached is Figure A
from this manual which shows that for a 1 V:4H embankment slope, a guardrail is not
necessary. Also, the culverts have sloped end treatments at the end, so there is no
obstruction at the bottom of the slope.
2. The steel reinforcement has been added to the plans.
3. 2 copies of the Water Design Report are included with this submission.