Loading...
HomeMy WebLinkAboutCost EstimateNO. 1 2 3 4 5 6 7 8 9 10 11 ENGINEER'S COST ESTIMATE -6/22/2006 CREEK MEADOW -ETJ SUBDIVISION OFF-SITE 6" FORCE MAIN GREENS PRAIRIE TRAIL & GREENS PRAIRIE ROAD COLLEGE STATION, BRAZOS COUNTY, TEXAS DESCRIPTION QUANTITY UNIT WATER LINE IMPROVEMENTS Mobilization, Staking, Traffic Control & Trench 1 LS Safety (Force Main) Erosion, Sedimentation Control & Seeding & Fence 1 LS Repair 6" PVC Force Main (SDR-26, Class 160) 4,482 LF Road Bore (Dry) (6" DIP-Class 250 Carrier Pipe & 169 LF 14" Steel Encasement-Sch 40 w/Casing Spacers) Ductile Iron Fittings (Class 350) 1 LS Sanitary Sewer Air Release Valve 2 EA Relocate Welborn Water Meter 4 EA Tie Into Existing Sanitary Sewer Manhole 1 EA Creek Crossing (6" DIP-Class 250 Carrier Pipe & 28 LF 14" Steel Encasement-Sch 40 w/Casing Spacers) Driveway Bore (Wet) 228 LF Structural Bedding (Cement Stabilized Sand) 40 LF UNIT COST $10,000.00 $8,000.00 $15.00 $200.00 $2,000.00 $3,000.00 $800.00 $1,000.00 $75.00 $40.00 $30.00 SUB-TOTAL= 10% CONTINGENCY= TOTAL ESTIMATED CONSTRUCTION COST= ~~"'-'1~. ~ :tE OF r~;'\\ This Engineer's Cost Estimate was prepared in our office, ~# 'h-<..,':••*•···~'5' .,, at the date shown, and is releas for the purpose of .f ··· ··• * f~ public in st proj • • :. • • • • • •••••••• \ 't l RABON A. METCALF I 1··~·················-I ate lf-~~ll;~~BJ.~.~':/ ~~.s~·····~~ RABON METCALF ENG . ~-· POST OFFICE BOX 9253 COLLEGE STATION, TEXAS 77842 CELL: (979) 219-4174 FAX: (979) 690-0329 E-mail: rmengineer@verizon.net TOTAL COST $10,000.00 $8,000.00 $67,230.00 $33,800.00 $2,000.00 $6,000.00 $3,200.00 $1,000.00 $2,100.00 $9,120.00 $1,200.00 $143,650.00 $14,365.00 $158,015.00 1of1